← All projectsCC03531 · CC05192
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

399 Montague Road, West End

Stockwell

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Stockwell on this project at Montague Rd, West End, QLD. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 13; 1 TGS suite on file (S2 Rev 16). On the permit boards: 0 permits in force and 2 in progress. Monday holds 16 requests for this job (1 new, 15 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Stockwell
Crompton job
CC03531 · CC05192
Location
Montague Rd, West End, QLD
LGA / authority
—
Project coordinator
C.C
Latest planner · TMD
Christine Vilador · Christopher Wright
Monday project status
Amendment Approved
Deliverables
TGS, TMP
Permits (Monday)
0 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
161 in 47 folders

What needs attention now

  1. Review comments to action: CC05192-S2 - Rev 16 - Stockwell - Montague Road. Required by 18 Nov 2026. Planner: Christine Vilador · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Christine, 14A/B/C are in the Rev 16 deck with a clear cover note ("Additional TGS for EWP/Boom Lift Works with Shuttle Flow and Hold & Release arrangements – 16 –…”
  2. Permit in progress: Tondara, Montague, Rogers (Road: Daily Arrangement) (BCC road) is Council Pending. Follow up 2 Dec 2026. Wanted from 6 Dec 2026.
  3. Permit in progress: Tondara, Montague, Rogers (Footpath: Daily Arrangement) (Footpath) is Fee Quote/Notice to Pay Received / Sent. Follow up 19 Nov 2026. Wanted from 25 Oct 2026.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Tondara, Montague, Rogers (Road: Daily Arrangement)
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn progress
Council Pending
6 Dec 2026 – 6 Jan 20274 Nov 20262 Dec 20264 Dec 2026
Tondara, Montague, Rogers (Footpath: Daily Arrangement)
Team Ethan · BCC Footpath Applications - Ethan
FootpathOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
25 Oct 2026 – 17 Jan 202730 Sep 202619 Nov 20266 Dec 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

    Nothing filed for this yet.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 132 Oct 20264CC03531-CTMP- REV 13 - Montague Rd, West End.pdf
—TMPRev 132 Oct 20264CC03531-TMP- REV 13 - Montague Rd, West End.pdf
—RARev 1123 Jun 20261Risk Assessment.pdf
S2TGSRev 1616 Nov 20268CC03531-S2-TGS- REV 16 - Montague Rd, West End.pdf

03Requests on Monday

2 job numbers are treated as one project here (CC03531, CC05192): Monday requests name them together or they share a folder. 16 requests since 26 Sep 2024: 1 for new plans and 15 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05192-S2 - Rev 16 - Stockwell - Montague RoadAmendmentS2Rev 16Review amendments
Internal Amendments
16 Nov 202618 Nov 2026Christine ViladorChristopher Wright
CC05192-S2 - Rev 15 - Stockwell - Montague RoadAmendmentS2Rev 15Invoiced
Invoiced
1 Oct 20263 Oct 2026
CC05192-S2 - Rev 14 - Stockwell - Montague Road UrgentAmendmentS2Rev 14Invoiced
Invoiced
18 Sep 202620 Sep 2026
CC05192-S2 - Rev 13 - Stockwell - Montague RoadAmendmentS2Rev 13Invoiced
Invoiced
9 Sep 202611 Sep 2026
CC05192-S2 - Rev 11 - Stockwell - Montague RoadAmendmentS2Rev 11Invoiced
Invoiced
19 Jun 202621 Jun 2026
CC05192-S2 - Rev 10 - Stockwell - Montague RoadAmendmentS2Rev 10Closed
No Charge
22 Apr 202624 Apr 2026
CC05192-S2 - Rev 9 - Stockwell - Montague RoadAmendmentS2Rev 09Invoiced
Invoiced
10 Apr 202612 Apr 2026
CC05192-S2 - Rev 8 - Stockwell - Montague RoadAmendmentS2Rev 08Invoiced
Invoiced
11 Feb 202613 Feb 2026
CC05192-S2 - Rev 7 - Stockwell - Montague RoadAmendmentS2Rev 07Invoiced
Invoiced
9 Jan 202611 Jan 2026
CC05192-S2 - Rev 6 - Stockwell - Montague RoadAmendmentS2Rev 06Invoiced
Invoiced
2 Oct 20254 Oct 2025
CC05192 - Stockwell - Montague RoadAmendmentClosed
No Charge
13 Mar 202515 Mar 2025
CC05192 - Stockwell - Montague RoadAmendmentPaid
Paid
19 Feb 202521 Feb 2025
CC05192 - Stockwell - Montague RoadAmendmentInvoiced
Invoiced
10 Feb 202512 Feb 2025
CC05192 - Stockwell - Montague Road - update site frontage planCouncil RFIClosed
No Charge
14 Jan 202516 Jan 2025
CC05192 - Stockwell - Montague Road - Site frontage PlanCouncil RFIPaid
Paid
29 Nov 20241 Dec 2024
CC05192 - Stockwell - Montague RoadNew plansClosed
No charge
26 Sep 202427 Sep 2024

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Christine ViladorPlanner
  • Christopher WrightTMD
  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Christine, 14A/B/C are in the Rev 16 deck with a clear cover note ("Additional TGS for EWP/Boom Lift Works with Shuttle Flow and Hold & Release arrangements – 16 – 16/11/2026"). 14C has STOP HERE WHEN DIRECTED on each approach, PREPARE TO STOP, the 40 km/h reduction, 30 m queue lengths and END ROADWORK / 50 on the exits. A few things before it goes to Stockwell: 1. Stray "DUPLICATED" labels (14C) * "DUPLICATED" prints four times on 14C next to ROADWORK AHEAD / REDUCE SPEED 40. If these are meant to be duplicated (left and right) signs, please show both signs and remove the text. If it's a drafting note, please delete it. 2. Pedestrians and the EWP * 14C's legend has no pedestrian route, and I can't see how pedestrians in the laneway (Woolworths shoppers / loading) are managed past the EWP. Please show the pedestrian route or closure, plus the EWP exclusion zone under the boom/basket (fenced or spotter-controlled), so nobody walks under the lift. 3. Staffing and traffic direction * 14A doesn't state Minimum TGS Assets / TC numbers. With three STOP HERE WHEN DIRECTED positions in the manifest, please state the number of TCs (plus break cover) and how they communicate (radio / line of sight). * There's an existing ONE WAY sign shown near the laneway. Please confirm the laneway's direction. If any leg is one-way, shuttle flow doesn't apply there and the sign layout needs to suit. 4. Admin * 14A/B/C show D.D 01/07/2024 (the original deck date). For new sheets I'd expect the…

  2. 16 Nov 2026, 10:33 am · Rica Panganiban · CC05192-S2 - Rev 16 - Stockwell - Montague Road

    Plans folder: Plans - CC03531 Suite: S2 Save work here: TGS > Rev 16 Project location: 399 Montague Road, West End Quote: none Job request form: none Request type: Additional TGS Scope: TGS Please prepare a new TGS for EWP/boom lift works within the laneway adjacent to the Woolworths elevation. Traffic is intended to be maintained past the work area using Hold & Release and/or Shuttle Flow arrangements rather than a full closure. Refer to client markup in the email thread and add the completed new TGS to the suite. Re_ 399 Montague.eml

    • 16 Nov 2026, 2:08 pm · Christine Vilador

      @Christopher Wright for TMD review. 1x Additional TGS - CC05192-S2-14A/B/C (Shuttle Flow on the Laneway adjacent to Woolworth. Link: TGS - Rev 16

  3. 22 Oct 2026, 12:42 pm · Permits · CC05192-S2 - Rev 13 - Stockwell - Montague Road

    Invoice IV0025651 --> scheduled on 25 Oct - Clint 1 x Additional TGS

    • 4 Nov 2026, 9:18 am · Permits

      invoice sent Lexi 2610

  4. 19 Oct 2026, 10:06 am · K.R · CC05192-S2 - Rev 13 - Stockwell - Montague Road

    1 x Additional TGS - Chargeable

  5. 13 Oct 2026, 5:25 pm · Permits · CC05192-S2 - Rev 15 - Stockwell - Montague Road

    IV0025554 scheduled for 25 Oct - Shaz 1310 1x tgsa 1x tmpa

  6. 13 Oct 2026, 5:21 pm · Permits · CC05192-S2 - Rev 14 - Stockwell - Montague Road

    IV0025554 invoice scheduled for 25 Oct - Shaz 1310 1x amendpa

  7. 12 Oct 2026, 5:29 pm · Ethan Mathews · CC05192-S2 - Rev 15 - Stockwell - Montague Road

    @Riri D. / @Lexi R / @Permits ACCOUNTS - Please invoice as per below: Accounts: 1xTGS Amendment - CC03531-S2-13A/B - Service Upgrade Works 1xTMP Amendment

  8. 12 Oct 2026, 5:02 pm · Ethan Mathews · CC05192-S2 - Rev 14 - Stockwell - Montague Road

    @Permits / @Lexi R / @Riri D. ACCOUNTS - Please invoice x1 TGS amendment to amend the TGS for soft closure on Tondara Lane request

  9. 6 Oct 2026, 10:58 am · Riri D. · CC05192-S2 - Rev 15 - Stockwell - Montague Road

    Plans sent to client - Re_ Stockwell House - 399 Montague St - TGS.eml

  10. 1 Oct 2026, 12:30 pm · Sandy · CC05192-S2 - Rev 15 - Stockwell - Montague Road

    Hi Plans folder: Plans - CC03531 Suite: S2 Save work here: TGS > Rev 15 Project location: 399 Montague Road, West End Quote: none Request type: Amendment Specific operations: Please add extra TC to create shuttle flow here as requested by Trish to road closure works. Request amendment to permit @Permits please amend the permit once plans has been amended Client mark-ups/attachments: requested by Trish liaised by Mark Fw_ Stockwell House - 399 Montague St - TGS.eml

    • 2 Oct 2026, 11:45 am · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: Plans - CC03531 Files: TGS - Rev 15 - CC03531-S2-TGS- REV 15 - Montague Rd, West End.pdf TMP - Rev 13 - CC03531-CTMP- REV 13 - Montague Rd, West End.pdf Accounts: 1xTGS Amendment - CC03531-S2-13A/B - Service Upgrade Works 1xTMP Amendment

    • 2 Oct 2026, 12:17 pm · Christopher Wright

      This is GTG

  11. 18 Sep 2026, 2:07 pm · Leo Escoton · CC05192-S2 - Rev 14 - Stockwell - Montague Road

    Hi @Riri D. , the requested amendment has been completed, and the document is now waiting for review. Links: TGS Account: 1x TGS Amendment completed: * TGS: Amended the soft closure at the top end of Tondara Lane near Kurilpa St and added a Traffic Controller to allow local access, as per the client’s comments.

  12. 18 Sep 2026, 12:49 pm · Sandy · CC05192-S2 - Rev 14 - Stockwell - Montague Road

    URGENT! Plans folder: Plans - CC03531 Suite: S2 Save work here: TGS > Rev 14 Project location: 399 Montague Road, West End Quote: N/A Request type: Amendment Scope: TGS Specific operations: Can you please show a soft closure on Tondara Lane, top end near Kurilpa St, please show a TC at the top end allowing local access. We are implementing the TGS Monday. We will need the TGS today Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 18 Sep 2026, 12:50 pm · Riri D.

      @Leo Escoton let me know if you have questions I need this asap today. Thanks!

    • 21 Sep 2026, 1:47 pm · Christopher Wright

      This is GTG @Ethan Mathews

  13. Posted by Ykath (ykath@cromptonconcepts.com.au) · @Y.B via Work Flow RapidPlan screenshot skipped: No plan file for this task

  14. 9 Sep 2026, 4:08 pm · Sandy · CC05192-S2 - Rev 13 - Stockwell - Montague Road

    Hi @Y.B Plans folder: Plans - CC03531 Suite: S2 Save work here: TGS > Rev 13 Project location: 399 Montague Road, West End Quote: N/A Request type: Amendment Scope: TGS Specific operations: sorry for the messy markup, the marked closure on bailey is meant to be on tondara. Client is doing service works upgrade for 1 week. TGS to amend: Client mark-ups/attachments:

    • 15 Sep 2026, 2:56 pm · Y.B

      @C.C Hi @A.A, I've added the additional TGS and uploaded it in SharePoint for your review. Please let me know if there are any revisions. Thank you! 1x Additional TGS CC03531-S2-13A/B - Service Upgrade Works - Full Road closure (Rogers Street and Tondara Lane intersection) Sharepoint - Documents - Rev 13 - All Documents

    • 17 Sep 2026, 11:52 am · Christopher Wright

      This is GTG

06Every file and folder

161 files in 47 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved