← All projectsCC03803 · CC04942
Project portal · built 17 Nov 2026, 10:03 am AEST · In drafting

240 Margaret St

Multiplex

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Multiplex on this project at 240 Margaret St, Brisbane City, QLD. 3 Monday requests are open; the most pressing is at the in drafting stage; the current CTMP on SharePoint is Rev 13; 7 TGS suites on file (General no rev, S1 Rev 21, S2 Rev 02, S3 Rev 01…). On the permit boards: 0 permits in force and 6 in progress. Monday holds 37 requests for this job (0 new, 37 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Multiplex
Crompton job
CC03803 · CC04942
Location
240 Margaret St, Brisbane City, QLD
LGA / authority
Brisbane City Council
Project coordinator
—
Latest planner · TMD
Rudra Khadka · Christopher Wright
Monday project status
Amendment Approved
Deliverables
—
Permits (Monday)
0 in force · 6 in progress
Last activity
16 Nov 2026
Files on SharePoint
1,337 in 374 folders

What needs attention now

  1. In drafting: CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St. Required by 18 Nov 2026. Planner: Rudra Khadka · TMD: Christopher Wright · Last note (16 Nov 2026, Riri D.): “Hi Team can i please have TGS Amended for the footpath closure and pedestrian detour, for front works CC03803-S1-21A We need the following TGS’s to review and approve and then you…”
  2. Issued, waiting on client: CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St. Required by 18 Sep 2026. Planner: Y.B · TMD: Christopher Wright · Last note (17 Sep 2026, Riri D.): “Plans sent to council - A007098712 - 240 MARGARET ST BRISBANE CITY QLD 4000.eml”
  3. Issued, waiting on client: CC03803-S1 - Rev 21 - Multiplex - 240 Margaret. Required by 11 Nov 2026. Planner: Marie Est · TMD: A.A · Last note (10 Nov 2026, S.B): “Hi Marie, * Daily arrangement part. The request was to combine the daily arrangement into this TGS. I can't see the site access bits on 21A: truck entry/exit route, gate TC or H&R…”
  4. Permit in progress: OOH: Multiples Activities 2 (BCC road) is Initial Pending. Follow up 16 Nov 2026. Wanted from 31 Aug 2026.
  5. Permit in progress: Footpath: Daily Arrangement (Footpath) is Amendment Requested. Follow up 18 Nov 2026. Wanted from 7 Dec 2026.
  6. Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 22 Nov 2026. Wanted from 20 Dec 2026.
  7. Permit in progress: Full Road: Tower Crane Dismantle (BCC road) is To do. Follow up 14 Dec 2026. Wanted from 12 Feb 2027.
  8. Permit in progress: OOH: Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 4 Jan 2027. Wanted from 5 Feb 2027.
  9. Permit in progress: Footpath: Full Closure (Footpath) is To do. Wanted from 5 Jan 2027.

PPermits

6 permit lines on the Monday permit boards: 0 in force, 6 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
OOH: Multiples Activities 2
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificIn progress
Initial Pending
31 Aug 2026 – 9 Oct 202627 Aug 202616 Nov 2026
Footpath: Daily Arrangement
Team Aisha · BCC Footpath Applications - Aisha
FootpathOngoingIn progress
Amendment Requested
7 Dec 2026 – 12 Jan 202729 Oct 202618 Nov 20261 Dec 2026
Road: Daily Arrangement
Team Aisha · BCC Road Permits - Aisha
BCC roadOngoingIn progress
Council Pending
20 Dec 2026 – 20 Jan 202729 Oct 202622 Nov 202613 Dec 2026
Full Road: Tower Crane Dismantle
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificIn progress
To do
12 Feb 2027 – 21 Feb 202714 Dec 2026
OOH: Tower Crane Dismantle
Team Aisha · BCC Road Permits - Aisha
BCC roadDate SpecificIn progress
Initial Pending
5 Feb 2027 – 21 Feb 20279 Nov 20264 Jan 2027
Footpath: Full Closure
Team Aisha · BCC Footpath Applications - Aisha
FootpathIn progress
To do
5 Jan 2027 – 28 Feb 2027

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

2 job numbers are treated as one project here (CC03803, CC04942): Monday requests name them together or they share a folder. 37 requests since 1 Aug 2024: 0 for new plans and 37 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC04942-S1 - Rev 22 - Multiplex - 240 Margaret StAmendmentS1Rev 22In drafting
Allocated
16 Nov 202618 Nov 2026Rudra KhadkaChristopher Wright
CC03803-S1 - Rev 21 - Multiplex - 240 MargaretAmendmentS1Rev 21With client
Client review
9 Nov 202611 Nov 2026Marie EstA.A
CC03803-S1 - Rev 20 - Multiplex - 240 MargaretAmendmentS1Rev 20Invoiced
Invoiced
26 Oct 202628 Oct 2026
CC03803-S1 - Rev 19 - Multiplex - 240 MargaretCouncil RFIS1Rev 19Invoiced
Invoiced
2 Oct 20264 Oct 2026
CC03803- S6 - Multiplex - 240 MargaretAmendmentS6Invoiced
Invoiced
29 Sep 20261 Oct 2026
CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)AmendmentNMPRev 18Invoiced
Invoiced
28 Sep 202630 Sep 2026
CC04942-S1 - Rev 18 - Multiplex - 240 Margaret StAmendmentS1Rev 18Invoiced
Invoiced
24 Sep 202626 Sep 2026
CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret StCouncil RFINMPRev 17With client
Client review
16 Sep 202618 Sep 2026Y.BChristopher Wright
CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret StAmendmentNMPRev 16Closed
No Charge
1 Sep 20263 Sep 2026
CC04942-S1 - Rev 17 - Multiplex - 240 Margaret StAmendmentS1Rev 17Invoiced
Invoiced
18 Aug 202620 Aug 2026
CC03803-NMP - Rev 14 - Multiplex - 240 MargaretAmendmentNMPRev 14Invoiced
Invoiced
8 Jul 202610 Jul 2026
CC04942-S1 - Rev 16 - Multiplex - 240 Margaret StAmendmentS1Rev 16Invoiced
Invoiced
3 Jun 20265 Jun 2026
CC04942-NMP - Rev 13 - Multiplex - 240 Margaret StAmendmentNMPRev 13Invoiced
Invoiced
26 Mar 202628 Mar 2026
CC04942-NMP - Rev 11 - Multiplex - 240 Margaret St (Hoist Installation)AmendmentNMPRev 11Invoiced
Invoiced
11 Nov 202513 Nov 2025
CC04942-S1 - Rev 15 - Multiplex - 240 Margaret StAmendmentS1Rev 15Invoiced
Invoiced
31 Oct 20252 Nov 2025
CC04942-NMP - Rev 10 - Multiplex - 240 Margaret St (Cable Pulling)AmendmentNMPRev 10Invoiced
Invoiced
13 Oct 202515 Oct 2025
CC04942-S1 - Rev 14 - Multiplex - 240 Margaret StAmendmentS1Rev 14Invoiced
Invoiced
21 Aug 202523 Aug 2025
CC04942-NMP - Rev 9 - Multiplex - 240 Margaret St (Tower Crane Installation)AmendmentNMPRev 09Invoiced
Invoiced
5 Aug 20257 Aug 2025
CC04942-NMP - Rev 8 - Multiplex - 240 Margaret StAmendmentNMPRev 08Invoiced
Invoiced
30 Jul 20251 Aug 2025
CC04942-S1 - Rev 12 - Multiplex - 240 Margaret StAmendmentS1Rev 12Invoiced
Invoiced
24 Jul 202526 Jul 2025
CC04942-S1 - Rev 11 - Multiplex - 240 Margaret StAmendmentS1Rev 11Invoiced
Invoiced
16 Jul 202518 Jul 2025
CC04942 -NMP - Rev 6 - Multiplex - 240 Margaret StAmendmentNMPRev 06Closed
No Charge
27 Mar 202529 Mar 2025
CC04942 - Multiplex - 240 Margaret StAmendmentInvoiced
Invoiced
27 Mar 202529 Mar 2025
CC04942 - Multiplex - 240 Margaret St - NMPAmendmentNMPPaid
Paid
7 Mar 20259 Mar 2025
CC04942 - Multiplex - 240 Margaret St - NMPAmendmentNMPPaid
Paid
29 Jan 202531 Jan 2025
CC04942 - Multiplex - 240 Margaret St - TGS's and CTMPClient review amendmentPaid
Paid
23 Jan 202525 Jan 2025
CC04942 - Multiplex - 240 Margaret StCouncil RFIPaid
Paid
17 Jan 202519 Jan 2025
CC04942 - Multiplex - 240 Margaret StCouncil RFIClosed
No Charge
7 Jan 20259 Jan 2025
CC04942 - Multiplex - 240 Margaret StCouncil RFIPaid
Paid
9 Dec 202411 Dec 2024
CC04942 - Multiplex - 240 Margaret StAmendmentPaid
Paid
26 Nov 202427 Nov 2024
CC04942 - Multiplex - 240 Margaret St - AmendmentAmendmentPaid
Paid
19 Nov 202419 Nov 2024
CC04942 - Multiplex - 240 Margaret StAmendmentPaid
Paid
12 Nov 202414 Nov 2024
CC04942 - Multiplex - 240 Margaret St - NMPAmendmentNMPPaid
Paid
31 Oct 20246 Nov 2024
CC04942 - Multiplex - 240 Margaret StAmendmentPaid
Paid
28 Aug 202429 Aug 2024
CC04942 - Multiplex - 240 Margaret StAmendmentClosed
No Charge
21 Aug 202421 Aug 2024
CC04942 - Multiplex - 240 Margaret StAmendmentPaid
Paid
5 Aug 20246 Aug 2024
CC04942 - Multiplex - 240 Margaret StAmendmentPaid
Paid
1 Aug 20241 Aug 2024

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archive and updates !!
  • CA0472 864 950 · phoebe.barroso@multiplex.global
  • Project EngineerAnna.cox@multiplex.global
  • Project Manager0476 837 766
  • SM David MorganDavid.Morgan@multiplex.global
  • Site Manager0400 771 988
  • Site Supervisor0458 717 360
  • Accounts240MAccounts@multiplex.global
  • Ben.Wright@multiplex.globalBen.Wright@multiplex.global
  • Bob McCullochRobert.McCulloch@multiplex.global
  • CA Tessa Kurtz 458 633 015
  • CA Tessa Kurtztessa.kurtz@multiplex.global
  • Daniel LitzowDaniel.Litzow@multiplex.global
  • HSE Coordinator Bob McCulloch0472 847 248
  • Invoice details - Multiplex
  • Archive
  • Thomas - Development Manager
  • Uyen - Finance Manager
  • thomas@citiplan.com.authomas@citiplan.com.au
  • uyen.n@journalstudentliving.com.auuyen.n@journalstudentliving.com.au
  • PM Lachlan Fallon0476851653
  • 04768516530476851653
  • SM Lewis Redding
  • Site Engr Lewis Redding0428 577 233

Crompton Concepts

  • Rudra KhadkaPlanner
  • Christopher WrightTMD
  • Marie EstPlanner
  • A.ATMD
  • Y.BPlanner

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 16 Nov 2026, 4:50 pm · Riri D. · CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St

    Hi Team can i please have TGS Amended for the footpath closure and pedestrian detour, for front works CC03803-S1-21A We need the following TGS’s to review and approve and then you can submit to BCC: * Two lane closure with footpath diversion, (all hours). * Three lane closure with footpath diversion, (9am to 4pm). * Aftercare footpath closure with diversion, (after hours). CC03803-S1-TGS - Rev 21.pdf Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS > Rev 22 Project location: 240 Margaret St Quote: none Job request form: none Request type: Amendment Scope: TGS

    • 17 Nov 2026, 8:05 am · Aisha Waver

      Hi @Rudra Khadka i will need this back asap today please. Sorry!

  2. 12 Nov 2026, 4:02 pm · Rica Panganiban · CC03803- S6 - Multiplex - 240 Margaret

    IV0025968 - drafted - Rica

    • 16 Nov 2026, 6:01 pm · Riri D.

      invoice IV0025968 sent to client Tree Trimming Works TGS.eml

  3. 10 Nov 2026, 3:05 pm · S.B · CC03803-S1 - Rev 21 - Multiplex - 240 Margaret

    Hi Marie, * Daily arrangement part. The request was to combine the daily arrangement into this TGS. I can't see the site access bits on 21A: truck entry/exit route, gate TC or H&R for trucks crossing the footpath. If those are meant to be included, please bring them across from the daily arrangement sheet so this one plan covers everything they'll run on those days. * "Vehicles can still park in the taper area". Please take this note out and keep the taper clear. Parked cars in the taper hide the delineation and mess up the merge. If parking has to stay, start the taper after the parking. * Title block. D.D shows 10/11/2023 (should be 2026), R.D is blank, and R.D.T says "Nikki". Please put in the right details. Approval date also shows 09/11, a day before the design date. * Cover schedule. Every sheet is now showing Rev 21 dated 23/10. Only 21A is new (10/11), so the others should keep their own last rev and date. Cheers @Marie Est @A.A

    • 11 Nov 2026, 10:19 am · Marie Est

      Hello @S.B and @A.A , The TGS S1 has already been amended and uploaded to the folder. * 1x TGS Amendment on S1 - CC03803-S1-21A - Added hold and release for truck entry and exit. Link: TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Thank you.

    • 11 Nov 2026, 1:51 pm · Aisha Waver

      @S.B can i please get an urgent review, i nedd this sent off this afternoon :)

  4. 10 Nov 2026, 9:49 am · Permits · CC03803-S1 - Rev 20 - Multiplex - 240 Margaret

    1 TGS AMENDMENT INV IV0025703 Invoice IV0025703 - Re 260729 240M - TC Recovery Using 650.eml

  5. 9 Nov 2026, 9:29 am · Riri D. · CC03803-S1 - Rev 21 - Multiplex - 240 Margaret

    New TGS to be created for 240 Margaret St - Multiplex. The client has requested to have a similar set up to the TGS above for the footpath closure. However they need to combine their daily arrangement, road closure that occupies 3 lanes out the front of the site. to the same TGS. Please and thank you! Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS > Rev 21 Project location: 240 Margaret St Quote: none Job request form: none Request type: Additional Scope: TGS

    • 10 Nov 2026, 9:35 am · Marie Est

      Hello @A.A , The TGS S1 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x New TGS on S1 - CC03803-S1-21A - Additional TGS (Request - Temp 3 Lane Closure + Ped Detour from Service Works) Link: TGS - CC03803-S1-TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Thank you.

  6. 3 Nov 2026, 10:06 am · Permits · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret

    2 TGS AMENDMENT INV IV0025702 Invoice IV0025702 - Re_ 260729 240M - TC Recovery Using 650.eml

  7. invoice to client

    • 2 Nov 2026, 6:06 pm · Riri D.

      Re_ 240M - Tower crane dismantle - OOH permit.eml

  8. 30 Oct 2026, 11:37 am · Riri D. · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret

    CC03803-S1 - Rev 19 - Multiplex - 240 Margaret Aisha Waver Client review no charged as per Aisha

  9. IV0025761 draft - Shaz 2910 1x nmp

  10. 26 Oct 2026, 12:53 pm · Permits · CC03803-S1 - Rev 20 - Multiplex - 240 Margaret

    Created this Monday line for invoicing purposes - Lexi Link - Rev 20

    • 26 Oct 2026, 1:13 pm · Riri D.

      1xNMP @Permits

  11. 8 Oct 2026, 11:42 am · Lexi R · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St

    2 TGS NEW INV IV0025436 Invoice IV0025436 - RE 240 Margaret Street - Tower Crane dismantle..eml

  12. @K.R @Permits 2xTGS amendments (minor ~45 mins) Rev 19

    • 22 Oct 2026, 12:21 pm · Riri D.

      @P.P Hi Pat, We’ll need to amend the attached TGS and implement a full footpath closure for the duration of these works in front of the site. The auxiliary cranes required adjacent to the site for installation of the 650t crane will clash with the existing site gantry. As a result, the gantry will need to be removed earlier than planned, meaning the footpath cannot remain open during this period. Could you please amend the TGS accordingly. This one can come back to me over the weekend or early next week mate. Not priority with all the other ones you have.RE_ 260729 240M - TC Recovery Using 650.eml

    • 24 Oct 2026, 10:46 am · P.P

      @Riri D. @K.R Minor amendment to TGS 19 & 20. Footpath closure added to each TGS. Not sure how to advise billing on this as it did not take long to do Rev 20

    • 26 Oct 2026, 10:26 am · Riri D.

      @P.P Hey Mate, Really minor, but can you change the wording for the gantry to be the below following? “Footpath closed due to gantry having been removed already” RE_ 260729 240M - TC Recovery Using 650.eml

    • 27 Oct 2026, 4:55 am · P.P

      @Riri D. @K.R additional amendment to change wording complete. Kept under Rev 20. No charge for this amendment

  13. 2 Oct 2026, 2:32 pm · Permits · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret

    Hi @P.P, Please instructions below: Main Folder Link: 240 Margaret St TGS > Rev 19 Instructions from Adam: " Hi Pat, Can you please update the attached as per the mark ups within the document?" Markup: CC03803-S1-TGS - Rev 18- 240 Margaret St Full Closure only (002) - MPX Comments 02.10.2026.pdf Email: Fw_ 260729 240M - TC Recovery Using 650 1.eml thanks thanks ~ clint

  14. NMP sent to client - Re_ 240M - Tower crane dismantle - OOH permit.eml

    • 6 Oct 2026, 11:26 am · Riri D.

      Amended NMP sent to client - Re_ 240M - Tower crane dismantle - OOH permit.eml

    • 14 Oct 2026, 11:11 am · Riri D.

      Amended NMP dates sent to client - Re_ 261007 240M - Crompton Status Update.eml

  15. 30 Sep 2026, 1:57 pm · Riri D. · CC03803- S6 - Multiplex - 240 Margaret

    • 1 Oct 2026, 11:54 am · Aisha Waver

      @Riri D. this is on the incorrect MPX project :)

  16. 29 Sep 2026, 10:29 am · Permits · CC03803- S6 - Multiplex - 240 Margaret

    Hi Plans folder: Plans - CC03803 Suite: S6 Save work here: TGS > S6 - Tree Trimming Crane Works Project location: 240 Margaret St Email Attached: Thank you! 🧡Kim

    • 29 Sep 2026, 10:39 am · Riri D.

      this will be a new suite for an additional TGS for tree trimming works

    • 29 Sep 2026, 2:13 pm · Santosh Giri

      Hi @A.A, Plan is available for your review. Link : TGS > S6 - Tree Trimming Crane Works Accounts 1 X New TGS Thank you.

    • 30 Sep 2026, 9:52 am · Christopher Wright

      This is GTG @Aisha Waver

  17. Hi team, Kindly save works here: NMP > NMP - Tower Crane Dismantle Main Project Link: 240 Margaret St Please see instructions from client below: "Hi Chelsea, Please find attached the set-up drawings now received from Lindores/Borgers for the erection of the Crane on the 240 Margaret Street Project. Dates as follows 11/12/26 – 13/12/26. Please note the following:- * TGS as per previous updated between MPX, Cromptons and Dowells * Access will be maintained to driveways on Margaret Street * MPX has commenced discussions and notifications with Neighbouring properties * Swept paths into Margaret Street for crane erection Approx time frames are as follows: * 11/12/26 – 11.00pm – 12/12/26 - 5 00am. Mobile Crane Mobilisation and erection * 12/12/26 - 5 00am – 5 30am. Inductions and prestart. As the mobile team are working are on a short timeline, it would be preferred if they could be inducted after the mobile is assembled. * 12/12/26 - 5 30am – 5 30pm. Dismantle of tower crane. * 12/12/26 - 5 30pm – 13/12/26 - 3 30 am. Mobile Crane demobilisation. Contingency (weather dependent) * 13/12/26 - 5 00am – 5 30am. Inductions and prestart. As the mobile team are working are on a short timeline, it would be preferred if they could be inducted after the mobile is assembled. * 13/12/26 - 5 30am – 5 30pm. Dismantle of tower crane. * 13/12/26 - 5 30pm – 14/12/26 - 3 30 am. Mobile Crane demobilisation. TGS has already been updated, however please advise if any further updates are required to…

    • 29 Sep 2026, 10:42 am · B.R

      Hi @Riri D., May I confirm the equipment/vehicles that will be used for these works, or will the same equipment be used as for the Tower Crane Installation shown below? Thank you!

    • 29 Sep 2026, 10:50 am · Riri D.

      @B.R NMP - Rev 09 - Tower Crane Installation you can use this one and update it for the tower crane removal. All attachment and Information from clients are saved in the folder, details for requirements are below. NMP - Rev 18 - Tower Crane Dismantle

    • 29 Sep 2026, 12:24 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: NMP - Tower Crane Dismantle NMP - Noise Management Plan - Tower Crane Dismantling.pdf Accounts: 1xNMP

    • 29 Sep 2026, 2:14 pm · Christopher Wright

      This appears to be GTG

    • 2 Oct 2026, 2:46 pm · Riri D.

      @B.R @Christopher Wright Could we please get this amended again. Thanks!

    • 2 Oct 2026, 3:29 pm · B.R

      Hi @Christopher Wright, dates are updated as above and for review. Thank you!

    • 6 Oct 2026, 7:14 am · Christopher Wright

      This is GTG @Aisha Waver

    • 8 Oct 2026, 11:47 am · Aisha Waver

      to be amended: My comments below regarding noise management plan (TC removal with 650), do you have any further? * Issue date / revision - Cover still shows 10/02/2025, Rev 0. Please update the date and bump the revision. * Work hours - There are no times in the NMP, only dates. Please add the following approx time frames, and make sure they line up with the OOH permit application:12/02/27 11:00pm - 13/02/27 5:00am: Mobile crane mobilisation and set-up * 13/02/27 5:00am - 5:30am: Inductions and prestart * 13/02/27 5:30am - 5:30pm: Dismantle of tower crane * 13/02/27 5:30pm - 14/02/27 3:30am: Mobile crane demobilisation * Weather day (if required): 14/02/27 5:00am - 15/02/27 3:30am, same sequence as above * The same time frames apply to Contingency 1 (5-7/02/27) and Contingency 2 (19-21/02/27) if they're needed. * Swept paths - Section 2.3 says swept paths are "for the crane erection".…

    • 8 Oct 2026, 2:00 pm · B.R

      Hi @Christopher Wright, This is revised and for review. Thank you very much! NMP - Noise Management Plan - Tower Crane Dismantling.pdf

    • 9 Oct 2026, 7:45 am · Christopher Wright

      @B.R Can you please go back through the NMP and make all the relevant changes as per @Aisha Waver I started reviewing this and I cannot see any times in rev 18, only dates. Please go through all 6 items and ensure they have been actioned.

    • 9 Oct 2026, 10:03 am · B.R

      Hi @Christopher Wright, My apologies, this was uploaded to the folder from the previous request as I didn’t realise the folder location had been changed. Noise Management Plan - Tower Crane Dismantling.pdf The revisions have been actioned as requested: * Issue date / revision - Cover still shows 10/02/2025, Rev 0. Please update the date and bump the revision. - Updated cover to Today date / Rev 18 * Work hours - There are no times in the NMP, only dates. Please add the following approx time frames, and make sure they line up with the OOH permit application:12/02/27 11:00pm - 13/02/27 5:00am: Mobile crane mobilisation and set-up * 13/02/27 5:00am - 5:30am: Inductions and prestart * 13/02/27 5:30am - 5:30pm: Dismantle of tower crane * 13/02/27 5:30pm - 14/02/27 3:30am: Mobile crane demobilisation * Weather day (if required): 14/02/27 5:00am - 15/02/27 3:30am, same sequence as above * The…

    • 12 Oct 2026, 6:46 am · Christopher Wright

      This is GTG

    • 14 Oct 2026, 10:03 am · Riri D.

      @B.R Can you please amend the primary dates table as it shows the 13/03 not 13/02.

    • 14 Oct 2026, 10:30 am · B.R

      Hi @Riri D. dates have been changed thank you :)

  18. 24 Sep 2026, 10:36 am · Riri D. · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St

    (This project is being done by Multiplex. These amendments to be invoiced to Dowells)

  19. 24 Sep 2026, 10:19 am · Permits · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St

    Hi, Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS/ TMP> Rev 18 Project location: 240 Margaret St CC03803-S1-Rev18- Multiplex- 240 Margaret St- (This project is being done by Multiplex. These amendments to be invoiced to Dowells) Request was for 2xTGS amendments. Saved Here: Rev 18 . I did a few internal amendments to this one today. They can be put under the same Monday line. -Karein (2409)

  20. 17 Sep 2026, 5:18 pm · Riri D. · CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St

    Plans sent to council - A007098712 - 240 MARGARET ST BRISBANE CITY QLD 4000.eml

  21. 16 Sep 2026, 11:45 am · Sandy · CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St

    Hi @Y.B Plans folder: Plans - CC03803 Suite: Plans Save work here: NMP > NMP - Rev 17 - OOH Project location: 240 Margaret St Quote: N/A Request type: Amendment Scope: NMP Specific operations: finalise this, I need this to be emailed through to specialist services and Ken Mckenzie OOH with the revised NMP for reference A007098712 - Chelsea Client mark-ups/attachments: BCC out of hours (OOH) + Road clousures_16.09.2026.xlsx Noise Management Plan - OOH Screen and Sign - R17 Draft.docx 240M - OOH permits.eml

    • 16 Sep 2026, 2:37 pm · Y.B

      @C.C Hi @A.A, I've amended the NMP and uploaded it in sharepoint for your review. Please let me know if any changes are required. Thank you! 1x NMP Amendment REV 17: Sharepoint - Documents - NMP - Rev 17 - OOH - All Documents CHANGES: 1. Added 4 sections for the upcoming works (Loading Dock, Sewer and Stormwater Services, Tower Crane Installation, and Water/Sewer/Stormwater Inground Services) 2. Added the TGSs for each work in Appendix H - CC05249-S5-9B - Loading Dock Works - CC05249-S3-10B - Sewer, stormwater inground services - CC05249-S5-6B/6C - Tower Crane installation - CC05249-S3-8B/6B/7B - Water, sewer, stormwater inground services (Stage 1 + 2) TGS Reference (CC05249) S3: Sharepoint - Documents - Rev 15 - All Documents S5: Sharepoint - Documents - Rev 09 - All Documents

    • 18 Sep 2026, 12:36 pm · Christopher Wright

      Hi @Y.B after going through the NMP i noticed that a lane stat is missing from TGS 7A in the diagram. Can you amend that please, then this will be GTG.

    • 18 Sep 2026, 1:18 pm · Y.B

      @Sandy @Riri D. Hi @Christopher Wright, I've reflected the most recent version of TGS (CC03803-S1-7A) in the NMP. Thanks!

    • 18 Sep 2026, 1:20 pm · Christopher Wright

      This is GTG @C.C

  22. 10 Sep 2026, 7:20 pm · Riri D. · CC04942-S1 - Rev 17 - Multiplex - 240 Margaret St

    Chelsea team catch up 10-09-26.pdf Invoice 2x TGS additional CC03803-S1-19A - Tower Crane Dismantle CC03803-S1-20A - Aftercare 1x CTMP amendment

    • 14 Sep 2026, 2:53 pm · Permits

      ✓ Invoice: IV0025260 ✓ Sent to client 🧡Kim Invoice IV0025260 from Crompton Concepts for CC04942-S1 - Rev 17 - Multiplex - 240 Margaret St.eml

  23. 10 Sep 2026, 6:37 pm · Riri D. · CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St

    No charged Chelsea team catch up 10-09-26.pdf

  24. @Permits I have done a minor amendment. Give it 5. GTG

  25. 1 Sep 2026, 11:55 am · Permits · CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St

    Hi, Please save work here: Plans Folder: Plans - CC03803 (NEW CC is CC04942) Suite: NA NMP: NMP - Rev 16 - Only showing the potholes Project Location: 240 Margaret St Quote: none Request type: Amendment Scope: NMP Specific operations: Can we please do an additional NMP for MPX 240, excluding the other activities and only showing the potholes? TGS to amend: na Client mark-ups/attachments: requested via teams by Chelsea -Karein

    • 1 Sep 2026, 12:19 pm · Y.B

      @C.C @Permits are there specific plant and equipment that will be used during works? Needed to add it in the NMP. Sample below.

    • 2 Sep 2026, 11:58 am · Y.B

      @C.C @Riri D. Hi @A.A I've amended the NMP to reflect only the Manhole Works. Please note that I've included the excavator and impact wrench as the listed equipment. Kindly advise if any additional plant or equipment is required on site for the works. Thank you. 1x NMP Amendment Sharepoint - Documents - NMP - Rev 16 - Only showing the potholes - All Documents

06Every file and folder

1,337 files in 374 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved