- 16 Nov 2026, 4:50 pmRiri D. on CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St: Hi Team can i please have TGS Amended for the footpath closure and pedestrian detour, for front works CC03803-S1-21A We need the following TGS’s to review and approve and then you can submit to BCC: * Two lane closure with footpath diversion, (all hours). *…
- 16 Nov 20262 files saved on SharePoint: Invoice IV0025968.pdf, Multiplex - 240 Margaret.xlsx
- 12 Nov 2026, 4:02 pmRica Panganiban on CC03803- S6 - Multiplex - 240 Margaret: IV0025968 - drafted - Rica
- 11 Nov 20262 files saved on SharePoint: CC03803-S1-TGS - Rev 21.tcp, CC03803-S1-TGS - Rev 21.pdf
- 10 Nov 2026, 3:05 pmS.B on CC03803-S1 - Rev 21 - Multiplex - 240 Margaret: Hi Marie, * Daily arrangement part. The request was to combine the daily arrangement into this TGS. I can't see the site access bits on 21A: truck entry/exit route, gate TC or H&R for trucks crossing the footpath. If those are meant to be included, please…
- 10 Nov 2026, 9:49 amPermits on CC03803-S1 - Rev 20 - Multiplex - 240 Margaret: 1 TGS AMENDMENT INV IV0025703 Invoice IV0025703 - Re 260729 240M - TC Recovery Using 650.eml
Crompton Concepts prepares the traffic management for Multiplex on this project at 240 Margaret St, Brisbane City, QLD. 3 Monday requests are open; the most pressing is at the in drafting stage; the current CTMP on SharePoint is Rev 13; 7 TGS suites on file (General no rev, S1 Rev 21, S2 Rev 02, S3 Rev 01…). On the permit boards: 0 permits in force and 6 in progress. Monday holds 37 requests for this job (0 new, 37 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC03803
- MondayCC04942-S1 - Rev 22 - Multiplex - 240 Margaret St
- MondayCC03803-S1 - Rev 21 - Multiplex - 240 Margaret
- MondayCC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St
- Client
- Multiplex
- Crompton job
- CC03803 · CC04942
- Location
- 240 Margaret St, Brisbane City, QLD
- LGA / authority
- Brisbane City Council
- Project coordinator
- —
- Latest planner · TMD
- Rudra Khadka · Christopher Wright
- Monday project status
- Amendment Approved
- Deliverables
- —
- Permits (Monday)
- 0 in force · 6 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 1,337 in 374 folders
What needs attention now
- In drafting: CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St. Required by 18 Nov 2026. Planner: Rudra Khadka · TMD: Christopher Wright · Last note (16 Nov 2026, Riri D.): “Hi Team can i please have TGS Amended for the footpath closure and pedestrian detour, for front works CC03803-S1-21A We need the following TGS’s to review and approve and then you…”
- Issued, waiting on client: CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St. Required by 18 Sep 2026. Planner: Y.B · TMD: Christopher Wright · Last note (17 Sep 2026, Riri D.): “Plans sent to council - A007098712 - 240 MARGARET ST BRISBANE CITY QLD 4000.eml”
- Issued, waiting on client: CC03803-S1 - Rev 21 - Multiplex - 240 Margaret. Required by 11 Nov 2026. Planner: Marie Est · TMD: A.A · Last note (10 Nov 2026, S.B): “Hi Marie, * Daily arrangement part. The request was to combine the daily arrangement into this TGS. I can't see the site access bits on 21A: truck entry/exit route, gate TC or H&R…”
- Permit in progress: OOH: Multiples Activities 2 (BCC road) is Initial Pending. Follow up 16 Nov 2026. Wanted from 31 Aug 2026.
- Permit in progress: Footpath: Daily Arrangement (Footpath) is Amendment Requested. Follow up 18 Nov 2026. Wanted from 7 Dec 2026.
- Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 22 Nov 2026. Wanted from 20 Dec 2026.
- Permit in progress: Full Road: Tower Crane Dismantle (BCC road) is To do. Follow up 14 Dec 2026. Wanted from 12 Feb 2027.
- Permit in progress: OOH: Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 4 Jan 2027. Wanted from 5 Feb 2027.
- Permit in progress: Footpath: Full Closure (Footpath) is To do. Wanted from 5 Jan 2027.
PPermits
6 permit lines on the Monday permit boards: 0 in force, 6 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| OOH: Multiples Activities 2 Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | In progress Initial Pending | 31 Aug 2026 – 9 Oct 2026 | 27 Aug 2026 | 16 Nov 2026 | ||
| Footpath: Daily Arrangement Team Aisha · BCC Footpath Applications - Aisha | Footpath | Ongoing | In progress Amendment Requested | 7 Dec 2026 – 12 Jan 2027 | 29 Oct 2026 | 18 Nov 2026 | 1 Dec 2026 | |
| Road: Daily Arrangement Team Aisha · BCC Road Permits - Aisha | BCC road | Ongoing | In progress Council Pending | 20 Dec 2026 – 20 Jan 2027 | 29 Oct 2026 | 22 Nov 2026 | 13 Dec 2026 | |
| Full Road: Tower Crane Dismantle Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | In progress To do | 12 Feb 2027 – 21 Feb 2027 | 14 Dec 2026 | |||
| OOH: Tower Crane Dismantle Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | In progress Initial Pending | 5 Feb 2027 – 21 Feb 2027 | 9 Nov 2026 | 4 Jan 2027 | ||
| Footpath: Full Closure Team Aisha · BCC Footpath Applications - Aisha | Footpath | In progress To do | 5 Jan 2027 – 28 Feb 2027 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC03803-S1-Rev 13-CTMP.pdfCTMP Rev 13 · 19 Aug 2026
- PDFSite Establishment Plan v3.pdf3 Jun 2024
- PDFCondition 51(a) - APPROVED 26.03.24 - Construction Management Plans 41137092.pdf8 Apr 2024
- PDFStreet Tree pruning.pdf6 Mar 2024
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFGeneral · QPS TGS.pdfno rev + 2 more
- PDFS1 · CC03803-S1-TGS - Rev 21.pdfRev 21
- PDFS2 · CC03803-S2-Rev02-TGS - Long term signage.pdfRev 02
- PDFS3 · CC03803-S3-TGS - R1.pdfRev 01
- PDFS4 · CC03803-S4-Rev 1-TGS.pdfRev 01 + 1 more
- PDFS5 · CC03803-S5-Rev1-TGS.pdfRev 01
- PDFS6 · CC03803-S6-TGS - Rev 0.pdfRev 00 + 1 more
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLA006508345 - 240 MARGARET ST BRISBANE CITY QLD 4000 - Fee Quote (id_7321676)9 Nov 2026
- EML240M - Tower crane dismantle - OOH permit2 Nov 2026
- MSGRE_ 260729 240M - TC Recovery Using 65024 Oct 2026
- EMLFw_ 260729 240M - TC Recovery Using 650 124 Oct 2026
- MSG240 Margaret Street - Tower Crane dismantle.8 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
03Requests on Monday
2 job numbers are treated as one project here (CC03803, CC04942): Monday requests name them together or they share a folder. 37 requests since 1 Aug 2024: 0 for new plans and 37 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 22 | In drafting Allocated | 16 Nov 2026 | 18 Nov 2026 | Rudra Khadka | Christopher Wright |
| CC03803-S1 - Rev 21 - Multiplex - 240 Margaret | Amendment | S1 | Rev 21 | With client Client review | 9 Nov 2026 | 11 Nov 2026 | Marie Est | A.A |
| CC03803-S1 - Rev 20 - Multiplex - 240 Margaret | Amendment | S1 | Rev 20 | Invoiced Invoiced | 26 Oct 2026 | 28 Oct 2026 | ||
| CC03803-S1 - Rev 19 - Multiplex - 240 Margaret | Council RFI | S1 | Rev 19 | Invoiced Invoiced | 2 Oct 2026 | 4 Oct 2026 | ||
| CC03803- S6 - Multiplex - 240 Margaret | Amendment | S6 | Invoiced Invoiced | 29 Sep 2026 | 1 Oct 2026 | |||
| CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle) | Amendment | NMP | Rev 18 | Invoiced Invoiced | 28 Sep 2026 | 30 Sep 2026 | ||
| CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 18 | Invoiced Invoiced | 24 Sep 2026 | 26 Sep 2026 | ||
| CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St | Council RFI | NMP | Rev 17 | With client Client review | 16 Sep 2026 | 18 Sep 2026 | Y.B | Christopher Wright |
| CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St | Amendment | NMP | Rev 16 | Closed No Charge | 1 Sep 2026 | 3 Sep 2026 | ||
| CC04942-S1 - Rev 17 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 17 | Invoiced Invoiced | 18 Aug 2026 | 20 Aug 2026 | ||
| CC03803-NMP - Rev 14 - Multiplex - 240 Margaret | Amendment | NMP | Rev 14 | Invoiced Invoiced | 8 Jul 2026 | 10 Jul 2026 | ||
| CC04942-S1 - Rev 16 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 16 | Invoiced Invoiced | 3 Jun 2026 | 5 Jun 2026 | ||
| CC04942-NMP - Rev 13 - Multiplex - 240 Margaret St | Amendment | NMP | Rev 13 | Invoiced Invoiced | 26 Mar 2026 | 28 Mar 2026 | ||
| CC04942-NMP - Rev 11 - Multiplex - 240 Margaret St (Hoist Installation) | Amendment | NMP | Rev 11 | Invoiced Invoiced | 11 Nov 2025 | 13 Nov 2025 | ||
| CC04942-S1 - Rev 15 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 15 | Invoiced Invoiced | 31 Oct 2025 | 2 Nov 2025 | ||
| CC04942-NMP - Rev 10 - Multiplex - 240 Margaret St (Cable Pulling) | Amendment | NMP | Rev 10 | Invoiced Invoiced | 13 Oct 2025 | 15 Oct 2025 | ||
| CC04942-S1 - Rev 14 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 14 | Invoiced Invoiced | 21 Aug 2025 | 23 Aug 2025 | ||
| CC04942-NMP - Rev 9 - Multiplex - 240 Margaret St (Tower Crane Installation) | Amendment | NMP | Rev 09 | Invoiced Invoiced | 5 Aug 2025 | 7 Aug 2025 | ||
| CC04942-NMP - Rev 8 - Multiplex - 240 Margaret St | Amendment | NMP | Rev 08 | Invoiced Invoiced | 30 Jul 2025 | 1 Aug 2025 | ||
| CC04942-S1 - Rev 12 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 12 | Invoiced Invoiced | 24 Jul 2025 | 26 Jul 2025 | ||
| CC04942-S1 - Rev 11 - Multiplex - 240 Margaret St | Amendment | S1 | Rev 11 | Invoiced Invoiced | 16 Jul 2025 | 18 Jul 2025 | ||
| CC04942 -NMP - Rev 6 - Multiplex - 240 Margaret St | Amendment | NMP | Rev 06 | Closed No Charge | 27 Mar 2025 | 29 Mar 2025 | ||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Invoiced Invoiced | 27 Mar 2025 | 29 Mar 2025 | ||||
| CC04942 - Multiplex - 240 Margaret St - NMP | Amendment | NMP | Paid Paid | 7 Mar 2025 | 9 Mar 2025 | |||
| CC04942 - Multiplex - 240 Margaret St - NMP | Amendment | NMP | Paid Paid | 29 Jan 2025 | 31 Jan 2025 | |||
| CC04942 - Multiplex - 240 Margaret St - TGS's and CTMP | Client review amendment | Paid Paid | 23 Jan 2025 | 25 Jan 2025 | ||||
| CC04942 - Multiplex - 240 Margaret St | Council RFI | Paid Paid | 17 Jan 2025 | 19 Jan 2025 | ||||
| CC04942 - Multiplex - 240 Margaret St | Council RFI | Closed No Charge | 7 Jan 2025 | 9 Jan 2025 | ||||
| CC04942 - Multiplex - 240 Margaret St | Council RFI | Paid Paid | 9 Dec 2024 | 11 Dec 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Paid Paid | 26 Nov 2024 | 27 Nov 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St - Amendment | Amendment | Paid Paid | 19 Nov 2024 | 19 Nov 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Paid Paid | 12 Nov 2024 | 14 Nov 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St - NMP | Amendment | NMP | Paid Paid | 31 Oct 2024 | 6 Nov 2024 | |||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Paid Paid | 28 Aug 2024 | 29 Aug 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Closed No Charge | 21 Aug 2024 | 21 Aug 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Paid Paid | 5 Aug 2024 | 6 Aug 2024 | ||||
| CC04942 - Multiplex - 240 Margaret St | Amendment | Paid Paid | 1 Aug 2024 | 1 Aug 2024 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- !! Archive and updates !!
- CA0472 864 950 · phoebe.barroso@multiplex.global
- Project EngineerAnna.cox@multiplex.global
- Project Manager0476 837 766
- SM David MorganDavid.Morgan@multiplex.global
- Site Manager0400 771 988
- Site Supervisor0458 717 360
- Accounts240MAccounts@multiplex.global
- Ben.Wright@multiplex.globalBen.Wright@multiplex.global
- Bob McCullochRobert.McCulloch@multiplex.global
- CA Tessa Kurtz 458 633 015
- CA Tessa Kurtztessa.kurtz@multiplex.global
- Daniel LitzowDaniel.Litzow@multiplex.global
- HSE Coordinator Bob McCulloch0472 847 248
- Invoice details - Multiplex
- Archive
- Thomas - Development Manager
- Uyen - Finance Manager
- thomas@citiplan.com.authomas@citiplan.com.au
- uyen.n@journalstudentliving.com.auuyen.n@journalstudentliving.com.au
- PM Lachlan Fallon0476851653
- 04768516530476851653
- SM Lewis Redding
- Site Engr Lewis Redding0428 577 233
Crompton Concepts
- Rudra KhadkaPlanner
- Christopher WrightTMD
- Marie EstPlanner
- A.ATMD
- Y.BPlanner
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 4:50 pm · Riri D. · CC04942-S1 - Rev 22 - Multiplex - 240 Margaret St
Hi Team can i please have TGS Amended for the footpath closure and pedestrian detour, for front works CC03803-S1-21A We need the following TGS’s to review and approve and then you can submit to BCC: * Two lane closure with footpath diversion, (all hours). * Three lane closure with footpath diversion, (9am to 4pm). * Aftercare footpath closure with diversion, (after hours). CC03803-S1-TGS - Rev 21.pdf Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS > Rev 22 Project location: 240 Margaret St Quote: none Job request form: none Request type: Amendment Scope: TGS
- 17 Nov 2026, 8:05 am · Aisha Waver
Hi @Rudra Khadka i will need this back asap today please. Sorry!
- 17 Nov 2026, 8:05 am · Aisha Waver
- 12 Nov 2026, 4:02 pm · Rica Panganiban · CC03803- S6 - Multiplex - 240 Margaret
IV0025968 - drafted - Rica
- 16 Nov 2026, 6:01 pm · Riri D.
invoice IV0025968 sent to client Tree Trimming Works TGS.eml
- 16 Nov 2026, 6:01 pm · Riri D.
- 10 Nov 2026, 3:05 pm · S.B · CC03803-S1 - Rev 21 - Multiplex - 240 Margaret
Hi Marie, * Daily arrangement part. The request was to combine the daily arrangement into this TGS. I can't see the site access bits on 21A: truck entry/exit route, gate TC or H&R for trucks crossing the footpath. If those are meant to be included, please bring them across from the daily arrangement sheet so this one plan covers everything they'll run on those days. * "Vehicles can still park in the taper area". Please take this note out and keep the taper clear. Parked cars in the taper hide the delineation and mess up the merge. If parking has to stay, start the taper after the parking. * Title block. D.D shows 10/11/2023 (should be 2026), R.D is blank, and R.D.T says "Nikki". Please put in the right details. Approval date also shows 09/11, a day before the design date. * Cover schedule. Every sheet is now showing Rev 21 dated 23/10. Only 21A is new (10/11), so the others should keep their own last rev and date. Cheers @Marie Est @A.A
- 11 Nov 2026, 10:19 am · Marie Est
Hello @S.B and @A.A , The TGS S1 has already been amended and uploaded to the folder. * 1x TGS Amendment on S1 - CC03803-S1-21A - Added hold and release for truck entry and exit. Link: TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Thank you.
- 11 Nov 2026, 1:51 pm · Aisha Waver
@S.B can i please get an urgent review, i nedd this sent off this afternoon :)
- 11 Nov 2026, 10:19 am · Marie Est
- 10 Nov 2026, 9:49 am · Permits · CC03803-S1 - Rev 20 - Multiplex - 240 Margaret
1 TGS AMENDMENT INV IV0025703 Invoice IV0025703 - Re 260729 240M - TC Recovery Using 650.eml
- 9 Nov 2026, 9:29 am · Riri D. · CC03803-S1 - Rev 21 - Multiplex - 240 Margaret
New TGS to be created for 240 Margaret St - Multiplex. The client has requested to have a similar set up to the TGS above for the footpath closure. However they need to combine their daily arrangement, road closure that occupies 3 lanes out the front of the site. to the same TGS. Please and thank you! Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS > Rev 21 Project location: 240 Margaret St Quote: none Job request form: none Request type: Additional Scope: TGS
- 10 Nov 2026, 9:35 am · Marie Est
Hello @A.A , The TGS S1 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x New TGS on S1 - CC03803-S1-21A - Additional TGS (Request - Temp 3 Lane Closure + Ped Detour from Service Works) Link: TGS - CC03803-S1-TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Thank you.
- 10 Nov 2026, 9:35 am · Marie Est
- 3 Nov 2026, 10:06 am · Permits · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret
2 TGS AMENDMENT INV IV0025702 Invoice IV0025702 - Re_ 260729 240M - TC Recovery Using 650.eml
- 2 Nov 2026, 4:58 pm · Riri D. · CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)
invoice to client
- 2 Nov 2026, 6:06 pm · Riri D.
Re_ 240M - Tower crane dismantle - OOH permit.eml
- 2 Nov 2026, 6:06 pm · Riri D.
- 30 Oct 2026, 11:37 am · Riri D. · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret
CC03803-S1 - Rev 19 - Multiplex - 240 Margaret Aisha Waver Client review no charged as per Aisha
- 29 Oct 2026, 11:16 am · Permits · CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)
IV0025761 draft - Shaz 2910 1x nmp
- 26 Oct 2026, 12:53 pm · Permits · CC03803-S1 - Rev 20 - Multiplex - 240 Margaret
Created this Monday line for invoicing purposes - Lexi Link - Rev 20
- 13 Oct 2026, 2:52 pm · Riri D. · CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)
- 26 Oct 2026, 1:13 pm · Riri D.
1xNMP @Permits
- 26 Oct 2026, 1:13 pm · Riri D.
- 8 Oct 2026, 11:42 am · Lexi R · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St
2 TGS NEW INV IV0025436 Invoice IV0025436 - RE 240 Margaret Street - Tower Crane dismantle..eml
- 3 Oct 2026, 7:16 am · P.P · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret
@K.R @Permits 2xTGS amendments (minor ~45 mins) Rev 19
- 22 Oct 2026, 12:21 pm · Riri D.
@P.P Hi Pat, We’ll need to amend the attached TGS and implement a full footpath closure for the duration of these works in front of the site. The auxiliary cranes required adjacent to the site for installation of the 650t crane will clash with the existing site gantry. As a result, the gantry will need to be removed earlier than planned, meaning the footpath cannot remain open during this period. Could you please amend the TGS accordingly. This one can come back to me over the weekend or early next week mate. Not priority with all the other ones you have.RE_ 260729 240M - TC Recovery Using 650.eml
- 24 Oct 2026, 10:46 am · P.P
@Riri D. @K.R Minor amendment to TGS 19 & 20. Footpath closure added to each TGS. Not sure how to advise billing on this as it did not take long to do Rev 20
- 26 Oct 2026, 10:26 am · Riri D.
@P.P Hey Mate, Really minor, but can you change the wording for the gantry to be the below following? “Footpath closed due to gantry having been removed already” RE_ 260729 240M - TC Recovery Using 650.eml
- 27 Oct 2026, 4:55 am · P.P
@Riri D. @K.R additional amendment to change wording complete. Kept under Rev 20. No charge for this amendment
- 22 Oct 2026, 12:21 pm · Riri D.
- 2 Oct 2026, 2:32 pm · Permits · CC03803-S1 - Rev 19 - Multiplex - 240 Margaret
Hi @P.P, Please instructions below: Main Folder Link: 240 Margaret St TGS > Rev 19 Instructions from Adam: " Hi Pat, Can you please update the attached as per the mark ups within the document?" Markup: CC03803-S1-TGS - Rev 18- 240 Margaret St Full Closure only (002) - MPX Comments 02.10.2026.pdf Email: Fw_ 260729 240M - TC Recovery Using 650 1.eml thanks thanks ~ clint
- 30 Sep 2026, 2:00 pm · Riri D. · CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)
NMP sent to client - Re_ 240M - Tower crane dismantle - OOH permit.eml
- 6 Oct 2026, 11:26 am · Riri D.
Amended NMP sent to client - Re_ 240M - Tower crane dismantle - OOH permit.eml
- 14 Oct 2026, 11:11 am · Riri D.
Amended NMP dates sent to client - Re_ 261007 240M - Crompton Status Update.eml
- 6 Oct 2026, 11:26 am · Riri D.
- 30 Sep 2026, 1:57 pm · Riri D. · CC03803- S6 - Multiplex - 240 Margaret
- 1 Oct 2026, 11:54 am · Aisha Waver
@Riri D. this is on the incorrect MPX project :)
- 1 Oct 2026, 11:54 am · Aisha Waver
- 29 Sep 2026, 10:29 am · Permits · CC03803- S6 - Multiplex - 240 Margaret
Hi Plans folder: Plans - CC03803 Suite: S6 Save work here: TGS > S6 - Tree Trimming Crane Works Project location: 240 Margaret St Email Attached: Thank you! 🧡Kim
- 29 Sep 2026, 10:39 am · Riri D.
this will be a new suite for an additional TGS for tree trimming works
- 29 Sep 2026, 2:13 pm · Santosh Giri
Hi @A.A, Plan is available for your review. Link : TGS > S6 - Tree Trimming Crane Works Accounts 1 X New TGS Thank you.
- 30 Sep 2026, 9:52 am · Christopher Wright
This is GTG @Aisha Waver
- 29 Sep 2026, 10:39 am · Riri D.
- 28 Sep 2026, 3:04 pm · Permits · CC04942- NMP - Rev 18 - Multiplex - 240 Margaret St (Tower Crane Dismantle)
Hi team, Kindly save works here: NMP > NMP - Tower Crane Dismantle Main Project Link: 240 Margaret St Please see instructions from client below: "Hi Chelsea, Please find attached the set-up drawings now received from Lindores/Borgers for the erection of the Crane on the 240 Margaret Street Project. Dates as follows 11/12/26 – 13/12/26. Please note the following:- * TGS as per previous updated between MPX, Cromptons and Dowells * Access will be maintained to driveways on Margaret Street * MPX has commenced discussions and notifications with Neighbouring properties * Swept paths into Margaret Street for crane erection Approx time frames are as follows: * 11/12/26 – 11.00pm – 12/12/26 - 5 00am. Mobile Crane Mobilisation and erection * 12/12/26 - 5 00am – 5 30am. Inductions and prestart. As the mobile team are working are on a short timeline, it would be preferred if they could be inducted after the mobile is assembled. * 12/12/26 - 5 30am – 5 30pm. Dismantle of tower crane. * 12/12/26 - 5 30pm – 13/12/26 - 3 30 am. Mobile Crane demobilisation. Contingency (weather dependent) * 13/12/26 - 5 00am – 5 30am. Inductions and prestart. As the mobile team are working are on a short timeline, it would be preferred if they could be inducted after the mobile is assembled. * 13/12/26 - 5 30am – 5 30pm. Dismantle of tower crane. * 13/12/26 - 5 30pm – 14/12/26 - 3 30 am. Mobile Crane demobilisation. TGS has already been updated, however please advise if any further updates are required to…
- 29 Sep 2026, 10:42 am · B.R
Hi @Riri D., May I confirm the equipment/vehicles that will be used for these works, or will the same equipment be used as for the Tower Crane Installation shown below? Thank you!
- 29 Sep 2026, 10:50 am · Riri D.
@B.R NMP - Rev 09 - Tower Crane Installation you can use this one and update it for the tower crane removal. All attachment and Information from clients are saved in the folder, details for requirements are below. NMP - Rev 18 - Tower Crane Dismantle
- 29 Sep 2026, 12:24 pm · B.R
Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: NMP - Tower Crane Dismantle NMP - Noise Management Plan - Tower Crane Dismantling.pdf Accounts: 1xNMP
- 29 Sep 2026, 2:14 pm · Christopher Wright
This appears to be GTG
- 2 Oct 2026, 2:46 pm · Riri D.
@B.R @Christopher Wright Could we please get this amended again. Thanks!
- 2 Oct 2026, 3:29 pm · B.R
Hi @Christopher Wright, dates are updated as above and for review. Thank you!
- 6 Oct 2026, 7:14 am · Christopher Wright
This is GTG @Aisha Waver
- 8 Oct 2026, 11:47 am · Aisha Waver
to be amended: My comments below regarding noise management plan (TC removal with 650), do you have any further? * Issue date / revision - Cover still shows 10/02/2025, Rev 0. Please update the date and bump the revision. * Work hours - There are no times in the NMP, only dates. Please add the following approx time frames, and make sure they line up with the OOH permit application:12/02/27 11:00pm - 13/02/27 5:00am: Mobile crane mobilisation and set-up * 13/02/27 5:00am - 5:30am: Inductions and prestart * 13/02/27 5:30am - 5:30pm: Dismantle of tower crane * 13/02/27 5:30pm - 14/02/27 3:30am: Mobile crane demobilisation * Weather day (if required): 14/02/27 5:00am - 15/02/27 3:30am, same sequence as above * The same time frames apply to Contingency 1 (5-7/02/27) and Contingency 2 (19-21/02/27) if they're needed. * Swept paths - Section 2.3 says swept paths are "for the crane erection".…
- 8 Oct 2026, 2:00 pm · B.R
Hi @Christopher Wright, This is revised and for review. Thank you very much! NMP - Noise Management Plan - Tower Crane Dismantling.pdf
- 9 Oct 2026, 7:45 am · Christopher Wright
@B.R Can you please go back through the NMP and make all the relevant changes as per @Aisha Waver I started reviewing this and I cannot see any times in rev 18, only dates. Please go through all 6 items and ensure they have been actioned.
- 9 Oct 2026, 10:03 am · B.R
Hi @Christopher Wright, My apologies, this was uploaded to the folder from the previous request as I didn’t realise the folder location had been changed. Noise Management Plan - Tower Crane Dismantling.pdf The revisions have been actioned as requested: * Issue date / revision - Cover still shows 10/02/2025, Rev 0. Please update the date and bump the revision. - Updated cover to Today date / Rev 18 * Work hours - There are no times in the NMP, only dates. Please add the following approx time frames, and make sure they line up with the OOH permit application:12/02/27 11:00pm - 13/02/27 5:00am: Mobile crane mobilisation and set-up * 13/02/27 5:00am - 5:30am: Inductions and prestart * 13/02/27 5:30am - 5:30pm: Dismantle of tower crane * 13/02/27 5:30pm - 14/02/27 3:30am: Mobile crane demobilisation * Weather day (if required): 14/02/27 5:00am - 15/02/27 3:30am, same sequence as above * The…
- 12 Oct 2026, 6:46 am · Christopher Wright
This is GTG
- 14 Oct 2026, 10:03 am · Riri D.
@B.R Can you please amend the primary dates table as it shows the 13/03 not 13/02.
- 14 Oct 2026, 10:30 am · B.R
Hi @Riri D. dates have been changed thank you :)
- 29 Sep 2026, 10:42 am · B.R
- 24 Sep 2026, 10:36 am · Riri D. · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St
(This project is being done by Multiplex. These amendments to be invoiced to Dowells)
- 24 Sep 2026, 10:19 am · Permits · CC04942-S1 - Rev 18 - Multiplex - 240 Margaret St
Hi, Plans folder: Plans - CC03803 Suite: S1 Save work here: TGS/ TMP> Rev 18 Project location: 240 Margaret St CC03803-S1-Rev18- Multiplex- 240 Margaret St- (This project is being done by Multiplex. These amendments to be invoiced to Dowells) Request was for 2xTGS amendments. Saved Here: Rev 18 . I did a few internal amendments to this one today. They can be put under the same Monday line. -Karein (2409)
- 17 Sep 2026, 5:18 pm · Riri D. · CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St
Plans sent to council - A007098712 - 240 MARGARET ST BRISBANE CITY QLD 4000.eml
- 16 Sep 2026, 11:45 am · Sandy · CC04942 -NMP - Rev 17 - Multiplex - 240 Margaret St
Hi @Y.B Plans folder: Plans - CC03803 Suite: Plans Save work here: NMP > NMP - Rev 17 - OOH Project location: 240 Margaret St Quote: N/A Request type: Amendment Scope: NMP Specific operations: finalise this, I need this to be emailed through to specialist services and Ken Mckenzie OOH with the revised NMP for reference A007098712 - Chelsea Client mark-ups/attachments: BCC out of hours (OOH) + Road clousures_16.09.2026.xlsx Noise Management Plan - OOH Screen and Sign - R17 Draft.docx 240M - OOH permits.eml
- 16 Sep 2026, 2:37 pm · Y.B
@C.C Hi @A.A, I've amended the NMP and uploaded it in sharepoint for your review. Please let me know if any changes are required. Thank you! 1x NMP Amendment REV 17: Sharepoint - Documents - NMP - Rev 17 - OOH - All Documents CHANGES: 1. Added 4 sections for the upcoming works (Loading Dock, Sewer and Stormwater Services, Tower Crane Installation, and Water/Sewer/Stormwater Inground Services) 2. Added the TGSs for each work in Appendix H - CC05249-S5-9B - Loading Dock Works - CC05249-S3-10B - Sewer, stormwater inground services - CC05249-S5-6B/6C - Tower Crane installation - CC05249-S3-8B/6B/7B - Water, sewer, stormwater inground services (Stage 1 + 2) TGS Reference (CC05249) S3: Sharepoint - Documents - Rev 15 - All Documents S5: Sharepoint - Documents - Rev 09 - All Documents
- 18 Sep 2026, 12:36 pm · Christopher Wright
Hi @Y.B after going through the NMP i noticed that a lane stat is missing from TGS 7A in the diagram. Can you amend that please, then this will be GTG.
- 18 Sep 2026, 1:18 pm · Y.B
@Sandy @Riri D. Hi @Christopher Wright, I've reflected the most recent version of TGS (CC03803-S1-7A) in the NMP. Thanks!
- 18 Sep 2026, 1:20 pm · Christopher Wright
This is GTG @C.C
- 16 Sep 2026, 2:37 pm · Y.B
- 10 Sep 2026, 7:20 pm · Riri D. · CC04942-S1 - Rev 17 - Multiplex - 240 Margaret St
Chelsea team catch up 10-09-26.pdf Invoice 2x TGS additional CC03803-S1-19A - Tower Crane Dismantle CC03803-S1-20A - Aftercare 1x CTMP amendment
- 14 Sep 2026, 2:53 pm · Permits
✓ Invoice: IV0025260 ✓ Sent to client 🧡Kim Invoice IV0025260 from Crompton Concepts for CC04942-S1 - Rev 17 - Multiplex - 240 Margaret St.eml
- 14 Sep 2026, 2:53 pm · Permits
- 10 Sep 2026, 6:37 pm · Riri D. · CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St
No charged Chelsea team catch up 10-09-26.pdf
- 3 Sep 2026, 12:04 pm · A.A · CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St
@Permits I have done a minor amendment. Give it 5. GTG
- 1 Sep 2026, 11:55 am · Permits · CC04942 -NMP - Rev 16 - Multiplex - 240 Margaret St
Hi, Please save work here: Plans Folder: Plans - CC03803 (NEW CC is CC04942) Suite: NA NMP: NMP - Rev 16 - Only showing the potholes Project Location: 240 Margaret St Quote: none Request type: Amendment Scope: NMP Specific operations: Can we please do an additional NMP for MPX 240, excluding the other activities and only showing the potholes? TGS to amend: na Client mark-ups/attachments: requested via teams by Chelsea -Karein
- 1 Sep 2026, 12:19 pm · Y.B
@C.C @Permits are there specific plant and equipment that will be used during works? Needed to add it in the NMP. Sample below.
- 2 Sep 2026, 11:58 am · Y.B
@C.C @Riri D. Hi @A.A I've amended the NMP to reflect only the Manhole Works. Please note that I've included the excavator and impact wrench as the listed equipment. Kindly advise if any additional plant or equipment is required on site for the works. Thank you. 1x NMP Amendment Sharepoint - Documents - NMP - Rev 16 - Only showing the potholes - All Documents
- 1 Sep 2026, 12:19 pm · Y.B
06Every file and folder