BAC DTB
Dowells
What's new
- 3 Nov 2026, 12:46 pmPermits on CC03805-S20 - Rev 2 - Dowells - BAC DTB: 1 TGS AMENDMENT INV IV0025721 Invoice IV0025721 - Re barrier removal TGS update .eml
- 3 Nov 20261 file saved on SharePoint: Invoice IV0025721.pdf
- 29 Oct 2026, 11:04 amPermits on CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure):
- 17 Oct 2026, 4:53 amP.P on CC03805-S20 - Rev 2 - Dowells - BAC DTB: @K.R minor amendments to TGS. Basically changed scope of works to barrier removal and removed cranes from TGS. Signage layout stays the same. Sent to client R2
- 16 Oct 2026, 1:11 pmPermits on CC03805-S20 - Rev 2 - Dowells - BAC DTB: Hi Pat, They are looking to amend this old TGS, see attached previous TGS we have from setting up cranes on Bribie way. They are looking to see if they can update this TGS to show that we are still closing the road, but are not setting up fixed cranes, they…
- 8 Oct 2026, 10:41 amLexi R on CC03805 -S35 - Dowells - BAC DTB (Airside Lane Closure): 1 TGS NEW INV IV0025314 Invoice IV0025314 - Re BAC Domestic airport TGS new one needed..eml
Crompton Concepts prepares the traffic management for Dowells on this project at Aero Rd, Brisbane, QLD. No Monday request is open right now; the latest one closed recently; the current TMP on SharePoint is Rev 01; 36 TGS suites on file (General Rev 02, S1 Rev 02, S10 Rev 02, S11 Rev 01…). Monday holds 17 requests for this job (0 new, 17 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Dowells
- Crompton job
- CC03805 · CC06249
- Location
- Aero Rd, Brisbane, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- K.R
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 3 Nov 2026
- Files on SharePoint
- 314 in 123 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDF1. TMP - 10651 Satellite Road Electricals rev 01.pdfTMP Rev 01 · 7 Nov 2023
- PDFCC03805-S20-TGS-Bribie Way.pdf17 Feb 2025
- PDFMicrosoft Outlook - Memo Style.pdf17 Feb 2025
- PDFTGS Mark ups for stage 1, 2 and 3..pdf26 Oct 2023
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFGeneral · Contam Investigation Pack for TGS Rev02.pdfRev 02 + 2 more
- PDFS1 · CC06127-S1-TGS-Rev 02- Erica Cct N Loading Dock.pdfRev 02
- PDFS10 · CC03805-S10-TGS-Rev 02.pdfRev 02 + 1 more
- PDFS11 · CC03805-S11-REV01-TGS.pdfRev 01
- PDFS12 · CC03805-S12-TGS.pdfno rev
- PDFS13 · CC03805-S13-TGS-Rev 2.pdfRev 02
- PDFS14 · CC03805-S14-TGS- Erica Cct Closure.pdfno rev
- PDFS15 · CC03805-S15-TGS-Rev 02.pdfRev 02
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- MSGFW_ barrier removal TGS update 16 Oct 2026
- MSGBAC Domestic airport TGS new one needed.12 Sep 2026
- EMLTGS Request - Northern Optimised Demo trucks - Erica Court (Northern Loading Dock) ACNXREF_RjfsvKKAauFv5DFru4PvtsD9N8M_30 Jun 2026
- EMLFW LL-GCOR-022228 TGS Request - Southern Macleay Way Stop_hold ACNXREF_8vbpnks4b63Nt8qokUdulB_20 May 2026
- MSGFW_ LL-GCOR-021934_ TGS request - Bribe Way - Pit D10 ACNXREF_bZy2gdULThWh2KrmkUdulB_7 May 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
03Requests on Monday
2 job numbers are treated as one project here (CC03805, CC06249): Monday requests name them together or they share a folder. 17 requests since 26 Jul 2024: 0 for new plans and 17 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC03805-S20 - Rev 2 - Dowells - BAC DTB | Amendment | S20 | Rev 02 | Invoiced Invoiced | 16 Oct 2026 | 18 Oct 2026 | ||
| CC03805 -S35 - Dowells - BAC DTB (Airside Lane Closure) | Amendment | S35 | Invoiced Invoiced | 20 Sep 2026 | 22 Sep 2026 | |||
| CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure) | Amendment | S35 | Rev 01 | Closed No Charge | 15 Sep 2026 | 17 Sep 2026 | ||
| CC06249/CC03805 - S33 - Rev 0 - BAC DTB | Amendment | S33 | Rev 00 | Invoiced Invoiced | 27 May 2026 | 29 May 2026 | ||
| CC06249/CC03805 - S34 - Rev 0 - BAC DTB | Amendment | S34 | Rev 00 | Invoiced Invoiced | 20 May 2026 | 22 May 2026 | ||
| CC03805 - S31 - Rev 0 - Dowells - BAC DTB - Airtrain | Amendment | S31 | Rev 00 | Invoiced Invoiced | 17 Apr 2026 | 19 Apr 2026 | ||
| CC03805 - S32 - Rev 0 - Dowells - BAC DTB - Pit 5 | Amendment | S32 | Rev 00 | Invoiced Invoiced | 17 Apr 2026 | 19 Apr 2026 | ||
| CC03805 - S15 - Rev 2 - Dowells - BAC DTB | Amendment | S15 | Rev 02 | Closed No Charge | 31 Mar 2026 | 2 Apr 2026 | ||
| CC03805 - S3 - Rev 2 - Dowells - BAC DTB | Amendment | S3 | Rev 02 | Invoiced Invoiced | 31 Mar 2026 | 2 Apr 2026 | ||
| CC03805 - S15 - Rev 1 - Dowells - BAC DTB | Amendment | S15 | Rev 01 | Invoiced Invoiced | 30 Mar 2026 | 1 Apr 2026 | ||
| CC03805 - S30 - Rev 0 - Dowells - BAC DTB | Amendment | S30 | Rev 00 | Invoiced Invoiced | 2 Mar 2026 | 4 Mar 2026 | ||
| CC03805 - S9 - Rev 2 - Dowells - BAC DTB | Amendment | S9 | Rev 02 | Closed No Charge | 23 Jan 2026 | 25 Jan 2026 | ||
| CC03805-S22 - Rev 1 - Dowells - Brisbane Airport | Amendment | S22 | Rev 01 | Closed No Charge | 2 May 2025 | 4 May 2025 | ||
| CC03805 - S4 - R0 - Dowells - Brisbane Airport | Amendment | S4 | Paid Paid | 2 May 2025 | 4 May 2025 | |||
| CC03805 - S23 - R0 - Dowells - Brisbane Airport | Amendment | S23 | Paid Paid | 1 May 2025 | 3 May 2025 | |||
| CC03805 - Dowells - Brisbane Airport | Amendment | Paid Paid | 29 Apr 2025 | 1 May 2025 | ||||
| CC03805-S19 - Rev 1 - Dowells - BAC | Amendment | S19 | Rev 01 | Paid Paid | 26 Jul 2024 | 28 Jul 2024 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- K.RProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 3 Nov 2026, 12:46 pm · Permits · CC03805-S20 - Rev 2 - Dowells - BAC DTB
1 TGS AMENDMENT INV IV0025721 Invoice IV0025721 - Re barrier removal TGS update .eml
- 29 Oct 2026, 11:04 am · Permits · CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure)
- 17 Oct 2026, 4:53 am · P.P · CC03805-S20 - Rev 2 - Dowells - BAC DTB
@K.R minor amendments to TGS. Basically changed scope of works to barrier removal and removed cranes from TGS. Signage layout stays the same. Sent to client R2
- 23 Oct 2026, 10:30 am · Riri D.
@P.P Hi Pat, Minor amendment for this one please mate. When you have time. See comments, they won’t need to make the U Turn down the bottom and would be looking to bring the trucks and semis down from the top road location they have marked up.CC03805-S20-Rev02-TGS- Bribie Way Barrier Removal.pdf
- 24 Oct 2026, 11:08 am · P.P
@Riri D. @K.R Minor TGS amendments. Hold & release removed, truck route updated, signage updated to reflect. Rev 03
- 23 Oct 2026, 10:30 am · Riri D.
- 16 Oct 2026, 1:11 pm · Permits · CC03805-S20 - Rev 2 - Dowells - BAC DTB
Hi Pat, They are looking to amend this old TGS, see attached previous TGS we have from setting up cranes on Bribie way. They are looking to see if they can update this TGS to show that we are still closing the road, but are not setting up fixed cranes, they will be putting a Franna down at material handling for the removal of concrete barriers (Clouded). Can we look to remove / include and signs for this set up as required? FW_ barrier removal TGS update .msg CC03805-S20-Rev01-TGS-Brisbane Airport Franna.pdf Thanks Iris (161026)
- 8 Oct 2026, 10:41 am · Lexi R · CC03805 -S35 - Dowells - BAC DTB (Airside Lane Closure)
1 TGS NEW INV IV0025314 Invoice IV0025314 - Re BAC Domestic airport TGS new one needed..eml
- 20 Sep 2026, 10:16 am · Permits · CC03805 -S35 - Dowells - BAC DTB (Airside Lane Closure)
Created this Monday line for invoicing purposes only - Lexi Link: S35- Airside Lane Closure
- 16 Sep 2026, 12:34 am · P.P · CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure)
@K.R non-billable amendment. Removed extra TC from setup. Kept under Rev 00 as amendment was more internal in nature Rev 00
- 15 Sep 2026, 1:47 pm · Permits · CC03805 -S35 - Rev 1 - Dowells - BAC DTB (Airside Lane Closure)
Hi @P.P, Plans folder: Plans - CC03805 Suite: S35- Airside Lane Closure Save work here: TGS > Rev 01 Project location: BAC DTB Quote: none Request type TGS Amendment Hi Patrick, Thanks for getting this over, I double checked with the site team and they don’t need the TC at the entrance of the baggage haul as its part of their works. No need for the TC here, please remove. RE_ BAC Domestic airport TGS new one needed..eml Thanks. Iris (150926)
06Every file and folder
314 files in 123 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|