NEXTDC B2 - Constance St, Valley
Multiplex
What's new
- 16 Nov 2026, 4:09 pmS.B on CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley: Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Still no amended on CTMP just only TGS.
- 16 Nov 20268 files saved on SharePoint: Noise Management Plan - OOH Works - Rev 10.docx, Noise Management Plan - OOH Works - Rev 10.pdf, CC05249 - Letter to Councilor.docx, CC05249 - Letter to Residents.docx and 4 more
- 16 Nov 2026, 3:43 pmS.B on CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation): Hi Janna, Thanks for the quick turnaround. The contingency note (11–14 December 2026, 6:30 AM – 6:30 PM and 6:30 PM – 6:30 AM) is in Section 2.2. I've been through the Rev 10 PDF and there are a few things to tidy before it goes to Multiplex / BCC: 1. The…
- 16 Nov 2026, 12:33 pmS.B on CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley: Hi John Paul, Thanks for the quick Rev 6, and for stepping it to a new revision. Good progress: the "Traffic controllers to alert vehicles after hours" line is gone from 20A, 19A now reads "Trucks reverse into Costin St and exit forward onto Water St; TC to…
- 16 Nov 2026, 11:15 amS.B on CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley: Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Regarding on the CTMP, we don't know if they need amend also.
- 16 Nov 2026, 10:52 amRosan Apolinaria on CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation): Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 10 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: NMP We need to make a condition in there for the…
Crompton Concepts prepares the traffic management for Multiplex on this project at Constance Street, Fortitude Valley, QLD. 7 Monday requests are open; the most pressing is at the TMD review stage; the current CTMP on SharePoint is Rev 15; 6 TGS suites on file (General no rev, S3 Rev 15, S4 Rev 02, S5 Rev 09…). On the permit boards: 0 permits in force and 6 in progress. Monday holds 47 requests for this job (4 new, 43 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC05249
- MondayCC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
- MondayCC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
- MondayCC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
- Client
- Multiplex
- Crompton job
- CC05249
- Location
- Constance Street, Fortitude Valley, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- C.C
- Latest planner · TMD
- Janna · S.B
- Monday project status
- Amendment Approved
- Deliverables
- Council Road Permit, Engineering (RPEQ), Engineering Design, Footpath Permit, Noise Management Plan, Out of Hours Permit, Police Permit, RA, Site Visit, Swept Path, TGS, TA, TMP, Workzone Permit, Traffic Counts
- Permits (Monday)
- 0 in force · 6 in progress
- Last activity
- 17 Nov 2026
- Files on SharePoint
- 1,561 in 424 folders
What needs attention now
- Needs TMD review: CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley. Required by 14 Nov 2026 (overdue). TMD: S.B · Last note (16 Nov 2026, S.B): “Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS:…”
- Needs TMD review: CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 18 Nov 2026. TMD: S.B · Last note (16 Nov 2026, S.B): “Hi Janna, Thanks for the quick turnaround. The contingency note (11–14 December 2026, 6:30 AM – 6:30 PM and 6:30 PM – 6:30 AM) is in Section 2.2. I've been through the Rev 10 PDF…”
- Review comments to action: CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 13 Nov 2026 (overdue). Planner: Leo Escoton · TMD: Christopher Wright · Last note (12 Nov 2026, S.B): “Hi Leo, Thanks for turning this around quickly. The main change has been carried through well. The overview, hours block and Scheduled Dates table now show Monday 7 to Thursday 10…”
- TMD approved, ready to issue: CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley. Required by 4 Nov 2026 (overdue). TMD: S.B · Last note (12 Nov 2026, S.B): “Hi Janna, * 20B (site inactive). Still showing "Generator 3: R29000 / Generator 2: R22500 / Generator 1: R21000 / Crane Pick-up and Slew Radius" (twice), "EXTRACT: WORK AREA", and…”
- Issued, waiting on client: CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle). Required by 30 Oct 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (30 Oct 2026, Riri D.): “CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle) Aisha Waver Client review no charged as per Aisha”
- Issued, waiting on client: CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 30 Oct 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (30 Oct 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Amended, added Tower Crane Installation on the NMP 1x Letter to Council 1x Letter to Residents Thank…”
- Issued, waiting on client: CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation). Required by 4 Nov 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (2 Nov 2026, Leo Escoton): “Hi @Aisha Waver and @Riri D., for review. Link: Sharepoint - Documents - Rev 08 - All Documents Accounts: 1x NMP - Work Schedule changed (Mon - Day 1 so on..); Remove Tower Crane…”
- Permit in progress: OOH: Generator Installation (BCC road) is Amendment Requested. Wanted from 21 Sep 2026.
- Permit in progress: Footpath: Generator Installation (Footpath) is FEE PAID. Follow up 18 Nov 2026. Wanted from 20 Nov 2026.
- Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 25 Nov 2026. Wanted from 10 Dec 2026.
- Permit in progress: Road: Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 4 Dec 2026. Wanted from 20 Feb 2027.
- Permit in progress: OOH: Generator Installation + Tower Crane Dismantle (BCC road) is Initial Pending. Follow up 27 Nov 2026. Wanted from 30 Nov 2026.
- Permit in progress: Constance St - Footpath: Daily Arrangement (Footpath) is Council Pending. Follow up 28 Nov 2026. Wanted from 1 Jan 2027.
PPermits
8 permit lines on the Monday permit boards: 0 in force, 6 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| OOH: Generator Installation Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | In progress Amendment Requested | 21 Sep 2026 – 27 Nov 2026 | 14 Sep 2026 | |||
| Footpath: Generator Installation Team Aisha · BCC Footpath Applications - Aisha | Footpath | Date Specific | In progress FEE PAID | 20 Nov 2026 – 15 Dec 2026 | 27 Aug 2026 | 18 Nov 2026 | 16 Oct 2026 | |
| Road: Daily Arrangement Team Aisha · BCC Road Permits - Aisha | BCC road | Ongoing | In progress Council Pending | 10 Dec 2026 – 10 Jan 2027 | 23 Oct 2026 | 25 Nov 2026 | 25 Nov 2026 | |
| Road: Tower Crane Dismantle Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | In progress Initial Pending | 20 Feb 2027 – 21 Feb 2027 | 29 Sep 2026 | 4 Dec 2026 | ||
| OOH: Generator Installation + Tower Crane Dismantle Team Aisha · BCC Road Permits - Aisha | BCC road | Ongoing | In progress Initial Pending | 30 Nov 2026 – 21 Mar 2027 | 4 Nov 2026 | 27 Nov 2026 | 7 Feb 2027 | |
| Constance St - Footpath: Daily Arrangement Team Aisha · BCC Footpath Applications - Aisha | Footpath | Ongoing | In progress Council Pending | 1 Jan 2027 – 21 Mar 2027 | 7 Nov 2026 | 28 Nov 2026 | 7 Feb 2027 | |
| Full Road Closure :Generator Installation + Loading Dock Team Aisha · BCC Road Permits - Aisha | BCC road | Date Specific | Approved, starts later Done | 7 Dec 2026 – 10 Dec 2026 | 11 Nov 2026 | |||
| OOH: Multiple Activities Team Aisha · BCC Road Permits - Aisha | BCC road | Ongoing | Closed Waiting for Refund | 11 May 2026 – 24 May 2026 | 5 Nov 2025 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC05249-CTMP-R14.pdfCTMP Rev 15 · 17 Dec 2025
- DOCXConstance St Footpath Closure - Scope of Work.docx17 Dec 2025
- DOCXConstance St Footpath Closure - Scope of Work.docx17 Dec 2025
- PDFSchedule 6 - Statutory Declaration 2025-26.pdf29 Jul 2025
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLA007098734 - 454 ST PAULS TCE FORTITUDE VALLEY QLD 4006 - Fee Quote (id_7313321)2 Nov 2026
- MSGFw_ Revised Dates - Constance St - email regarding generator nstall road closure2 Nov 2026
- EMLA006924031 - 454 ST PAULS TCE FORTITUDE VALLEY QLD 4006 - Fee Quote (id_7299018)23 Oct 2026
- EMLA007098734 - 454 ST PAULS TCE FORTITUDE VALLEY QLD 4006 - Revised Fee Quote (id7265907)1 Oct 2026
- EMLFW Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH Generator Installation)_480729 Sep 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 15 | 17 Dec 2025 | 16 | CC05249-CTMP-R14.pdf |
| — | TMP | Rev 14 | 17 Dec 2025 | 15 | Barrier Design.pdfCC05249-TMP-R13.pdfCC05249-TMP-R14.pdf |
| — | NMP | Rev 10 | 16 Nov 2026 | 11 | Noise Management Plan - OOH Works - Rev 10.pdf |
| — | RA | Rev 14 | 16 Dec 2025 | 11 | CC05249-RA.pdf |
| — | Letter to residents | Rev 07 | 2 Nov 2026 | 2 | CC05249 - Letter to Residents.pdf |
| General | TGS | no rev | 27 Feb 2026 | 0 | CC05249 - S2 - NEXTDC - TGS.pdfCC05249-S3+S5-TGS.pdf |
| General | Swept path | no rev | 3 Aug 2026 | 0 | Constance St-Swept Path.pdfMULTIPLEX-CONSTANCE ST-GENERATOR INSTALLATION SWEPT PATH.pdfMisterton St Swept Paths.pdf |
| General | Workzone plan | no rev | 3 Jun 2025 | 0 | WORKZONE.pdfWORKZONE_2.pdf |
| S3 | TGS | Rev 15 | 17 Dec 2025 | 16 | CC05249-S3-1B - New TGS Constance Street Temporary Closure.pdfCC05249-S3-TGS-R15.pdf |
| S4 | TGS | Rev 02 | 15 May 2025 | 3 | CC05249-TGS-S4-R2-Concept Plans.pdf |
| S5 | TGS | Rev 09 | 27 Jan 2026 | 10 | CC05249-TGS-S5-R9.pdf |
| S6 | TGS | Rev 03 | 18 Jul 2025 | 4 | CC05249-TGS-S6-R3.pdf |
| S8 | TGS | Rev 06 | 16 Nov 2026 | 7 | CC05249-S8-TGS-R6.pdf |
| S8 | Swept path | Rev 03 | 3 Aug 2026 | 2 | Constance St-Swept Path.pdf |
03Requests on Monday
47 requests since 20 Nov 2024: 4 for new plans and 43 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- PM0400771988 · cameron.boyd@multiplex.global
- Proj Eng0439948945 · konrad.wosny@multiplex.global
- SiteEng0497898387 · Kaveh.batmani@multiplex.global
- !!! INVOICING !!! Include docs when invoicing
- !!! Invoice to Multiples Construction Pty Ltd !!!
- !!! Invoice to Multiples Constructions Pty Ltd !!!
- !!! Invoices - !!NEXTDCB2.Accounts@multiplex.global
- Archive
- Amy StedallAmy.Stedall@multiplex.global
- CAMarco.fuentes@multiplex.global
- Marcos HigashiMarcos.Higashi@multiplex.global
- NEW CA Rachel Doherty0429 981 803
- 0429 981 8030429 981 803
- Rachel.Doherty@multiplex.globalRachel.Doherty@multiplex.global
- SE - Marcos HigashiMarcos.Higashi@multiplex.global
- SE Marcos HigashiMarcos.Higashi@multiplex.global
- SM - Mark WieseMark.Wiese@multiplex.global
- Construction Manager George Haddad0477 624 169
- George Haddadgeorge.haddad@multiplex.global
- Kamil SierantKamil.Sierant@multiplex.global
- Project Engr. Kamil Sierant - 439 948 945
- Project Engr. Kamil SierantKamil.Sierant@multiplex.global
- Project Engr. Konrad Wosny0439 948 945
- SM Mark Wiese0437 210 887
Crompton Concepts
- JannaPlanner
- S.BTMD
- John Paul EbarsabalPlanner
- Leo EscotonPlanner
- Christopher WrightTMD
- C.CProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 4:09 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Still no amended on CTMP just only TGS.
- 16 Nov 2026, 3:43 pm · S.B · CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi Janna, Thanks for the quick turnaround. The contingency note (11–14 December 2026, 6:30 AM – 6:30 PM and 6:30 PM – 6:30 AM) is in Section 2.2. I've been through the Rev 10 PDF and there are a few things to tidy before it goes to Multiplex / BCC: 1. The request isn't fully covered yet * The second half of Rosan's instruction is missing. Please add something like: "Should inclement weather affect the approved days, the Temporary Road Closures team (BCC) has agreed that the Road Closure Certificate will be updated accordingly to the contingency dates." * The Scheduled Dates table only shows 07/12 – 10/12 "Approved Permit". Please add a row: Generator installation – Constance St – Day/Night – 11/12/2026 (Fri) to 14/12/2026 (Mon) – Contingency (weather). * Hours of Work (2.2) still says Monday to Thursday only. The contingency runs Friday to Monday, including a weekend, so please update the hours to cover it. The OOH approval and resident notification will need to cover those nights too. 2. Conflicting old note * Straight after the new note there's an old one: "Monday to be contingency day should generator installation not be finalised over the weekend establishment…". This is from the earlier weekend schedule and contradicts both the Mon–Thu programme and the new 11–14 Dec contingency. Please delete it. 3. Word markup is printing in the PDF * Page 4 shows "Formatted: Body Text, Justified, Space Before: 6 pt…" and "Formatted: Check spelling and grammar". These are…
- 16 Nov 2026, 4:09 pm · Janna
Hi Sanju, Updated already Thanks,
- 16 Nov 2026, 4:09 pm · Janna
- 16 Nov 2026, 12:33 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi John Paul, Thanks for the quick Rev 6, and for stepping it to a new revision. Good progress: the "Traffic controllers to alert vehicles after hours" line is gone from 20A, 19A now reads "Trucks reverse into Costin St and exit forward onto Water St; TC to hold and release traffic during each movement", 20B now has the Stabilised-Sand Setup and 25 m dimension from 18B, the 20B legend is cleaned up, and all title blocks are on Rev 6 dated 16/11. A few things are still open: 1. 20B still doesn't match 18B (Riri's note) * 20B still has STOP HERE WHEN DIRECTED (3) and 9 PREPARE TO STOP signs, which is the same as 19C. 18B has no STOP HERE signs and only 3 PREPARE TO STOP. Please delete the extra TC signs from 20B so the sign layout is the same as 18B. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)". Once 20B is fixed, please regenerate the 20A manifest so no TC signs go out for the unattended site. * 20B also has "Saturday to Monday Road and footpath closure" (from 19B). If the closure does stay in place over the weekend, that's fine, but please confirm it's meant to be on the inactive sheet. 2. 40 km/h after hours (still open) * REDUCE SPEED 40 is still on 18B and 20B, and the 18A and 20A manifests still include "TC1828 Truck Symbolic, TC1174 Do Not Overtake, TC1217 (40) Speed 40". The only reasoning on 18A/20A is "40 km/hr speed…
- 16 Nov 2026, 11:15 am · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS: Rev 06 Additional Regarding on the CTMP, we don't know if they need amend also.
- 16 Nov 2026, 11:17 am · John Paul Ebarsabal
Good day, Hi @Aisha Waver and @S.B , TGS is already updated now. Thank you.
- 16 Nov 2026, 12:10 pm · Aisha Waver
@S.B is this good to go? :)
- 16 Nov 2026, 11:17 am · John Paul Ebarsabal
- 16 Nov 2026, 10:52 am · Rosan Apolinaria · CC05249-NMP - Rev 10 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 10 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: NMP We need to make a condition in there for the Generator installation contingency dates - Contingency dates are 11/12-14/12, The Temporary Road Closures Team (Deborah Burden) has agreed that should inclement weather affect the approved days the Road Closure Certificate will be updated accordingly.
- 16 Nov 2026, 1:38 pm · Janna
Hi @Riri D. Done with this one. Thank you!
- 16 Nov 2026, 1:38 pm · Janna
- 16 Nov 2026, 7:04 am · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi John Paul, Thanks for turning this around so quickly. Most of the list is closed out now. The reviewer initials are R.R on every sheet, 17B only reads "JOINS 17C", 18A no longer mentions traffic controllers after hours, the 20A risk table and bus stop table are fixed (no more "Enter Reasoning"), the loose line on 19B is gone, 20B is titled "Site Inactive", its legend no longer has the concrete pump, generators or work area, and the "Bays remain closed during the install period" note is a nice touch. A few things left: 1. 20B / 20A: TC signs on the inactive setup (Riri's note) * The 20B text still has STOP HERE WHEN DIRECTED (3) and several PREPARE TO STOP signs. Riri asked for 20B to match 18B exactly, and 18B has no STOP HERE signs. Please delete them from 20B rather than covering them. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)", plus "TC1828 Truck Symbolic … Speed 40". Please regenerate the 20A manifest from the final 20B so nothing TC-related goes out for the unattended site. * The 18B closure point has "Stabilised-Sand Setup" and a 25 m dimension that I can't find on 20B. Please check that the closure points on 20B are identical to 18B. 2. 20A reasoning (new) * 20A now reads "Work vehicles and equipment will occupy the road; detours to be provided. Traffic controllers to alert vehicles after hours." That line came off…
- 13 Nov 2026, 4:58 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS
- 13 Nov 2026, 3:09 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi John Paul, Thanks for the quick turnaround on Rev 5. Good progress: the 19B notes now show the 2 + 6 car parks taken out for the 3 days of the generator install, 20B no longer has the queue lengths, crane/generator radii or TC notes, the risk tables on 17A, 18A and 19A now say the road closure and detour are anticipated, and the title blocks are all on Rev 5 dated 13/11. A few things still need fixing before this goes back to Multiplex: 1. 20B to match 18B (Riri's note) * 20B still shows STOP HERE WHEN DIRECTED (6) and PREPARE TO STOP signs. 18B has no STOP HERE signs. As the site is unattended, please remove them from 20B rather than just covering them, so the closure matches 18B. * The 20A manifest still lists "2 x Multi Message (TC1257 Traffic Controller Symbolic, TC1173 Prepare To Stop, TC1174 Do Not Overtake)" and "1 x Multi Message (TM1-35C Stop here when directed…)". Please regenerate the 20A manifest from 20B so no TC signs go out for the inactive setup. * 18B shows a "Stabilised-Sand Setup" closure point and a 25 m dimension that I can't find on 20B. Please check the closure points are identical. * 20B legend still has Concrete Pump, Roof Generators 80T, Exclusion Zone and Work Zone, plus "EXTRACT: WORK AREA". Please drop anything not drawn on the inactive sheet. * 20B still has REDUCE SPEED 40 (twice). With no workers on site, either justify keeping 40 overnight on 20A or remove/cover it. * Title typo: "Site In Active" should be "Site Inactive". 2. 19B car park…
- 13 Nov 2026, 5:02 pm · John Paul Ebarsabal
Updated already mate.
- 13 Nov 2026, 5:02 pm · John Paul Ebarsabal
- 13 Nov 2026, 1:49 pm · John Paul Ebarsabal · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi @Aisha Waver , TGS is already updated with the same folder on Rev 05. Thank you.
- 13 Nov 2026, 1:56 pm · Aisha Waver
@S.B please review
- 13 Nov 2026, 1:56 pm · Aisha Waver
- 13 Nov 2026, 1:47 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS
- 12 Nov 2026, 4:07 pm · S.B · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * Rev 05 - TGS
- 12 Nov 2026, 2:59 pm · Riri D. · CC05249-S8 - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley
can we please get a TGS amendment - CC05249-S8-19B for multiplex constance. We need to exclude the carparks on the generator install. CC05249-S8-TGS-R4.pdf Plans folder: Plans - CC05249 Suite: S8 New Main Works Save work here: TGS > Rev 05 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: TGS
- 13 Nov 2026, 11:26 am · Riri D.
@John Paul as discussed on teams, please amend TGS CC05249-S8-20B closures back to the way it was before exactly like TGS CC05249-S8-18B
- 13 Nov 2026, 11:26 am · Riri D.
- 12 Nov 2026, 8:05 am · S.B · CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi Leo, Thanks for turning this around quickly. The main change has been carried through well. The overview, hours block and Scheduled Dates table now show Monday 7 to Thursday 10 December 2026 against the approved permit. The three old date ranges and contingency weekends are gone from the table, and the issue date is updated to 11/11/2026. A few leftovers from Rev 08 still need cleaning up, and the notification letters weren't updated. Most important first: 1. Letters to Residents and Councillor (Rev 09 folder): not updated * Both letters are still dated 28 October 2026. They still say "Generator Installation on 30 November to 4 December 2026, with contingency works from 7 December to 14 December 2026". Please change this to 7–10 December 2026, with no contingency, to match the NMP and RC-14993-4. * Both letters show "Tower Crane Installation on 5 to 6 December 2026, with a contingency weekend on 12 to 13 December". The NMP now has a Tower Crane Dismantle on 20/02/2027 with four contingency weekends. Please confirm with Riri whether the tower crane should be in this letter at all. If it stays, the activity name and dates must match the NMP. * Both letters have copy-paste text from another job. "Police, Fire or Ambulance are required to attend a property on Coronation Drive" should be Constance Street. The Residents letter also has a "HUTCHINSON BUILDERS" footer, which needs to come out. * Also: "Multiplex wish to all residents" is missing a word (should be "wish to advise…
- 12 Nov 2026, 8:04 am · S.B · CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi Janna, * 20B (site inactive). Still showing "Generator 3: R29000 / Generator 2: R22500 / Generator 1: R21000 / Crane Pick-up and Slew Radius" (twice), "EXTRACT: WORK AREA", and Work Area / Crane Base / Concrete Pump / Roof Generators 80T in the legend. Please take these off. It also still has STOP HERE WHEN DIRECTED (6) and PREPARE TO STOP. With no TC on site after hours, please remove these, or if they're meant to stay up covered, make sure each one is clearly drawn and labelled as covered (same for the 40 and DO NOT OVERTAKE signs). * 20A manifest and reasoning. The manifest still lists TC1257 Traffic Controller Symbolic (2 + 2 + 1) and 3 x TM1-35C Stop here when directed. Please regenerate it from 20B as drawn. The selected option reasoning on 20A says "Traffic controllers are to hold and release when trucks are reversing onto site", which is the 19A wording. Please reword it for the site-inactive setup (no TC, static closure and detour only). * 18A risk table still says "1. No closure / detour anticipated during construction." Please match 19A/20A, and check 17A as well. * 17B still reads "JOINS 3C". Please delete it (17C is the right one). * Revision block. R.D is still 04/11/2026 on every sheet while the design date is 11/11/2026. Please update the Rev 4 date/description to cover this round. * CTMP:* Table 1: please add a Rev 4 "Revised By" row (last one is 31/07). * Table 2 still lists "CC05249 - S5 - CTMP - R0" to R4. Should be S8. * Table 4 change log stops at…
- 12 Nov 2026, 11:40 am · Janna
Hi @S.B I have updated the file accordingly based on the provided comments. Kindly refer to the folder link below. Rev 04 Thanks,
- 12 Nov 2026, 11:40 am · Janna
- 11 Nov 2026, 2:37 pm · Leo Escoton · CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 09 - All Documents Accounts: 1x NMP - NMP updated to reflect the approved road permit dates for the Generator Installation works from 7–10 December 2026. Thank you!
- 11 Nov 2026, 3:01 pm · Aisha Waver
@S.B can you please review :)
- 11 Nov 2026, 3:01 pm · Aisha Waver
- 11 Nov 2026, 1:04 pm · S.B · CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi Rudra, * 19B/19C swept path. Following my reply above, please use Constance St-Swept Path.pdf (MP-CS-FV-01 Rev A, 03/08/2026) in the RPEQ / Generator Installation Swept Path folder. Please don't use the July Options 1-3 set or the path currently in the CTMP. On 19B/19C:* Trace the forward legs in the forward colour and the reverse leg in the reverse colour, exactly as the RPEQ sheet shows them (entry from Costin St, reverse, exit via Baxter St / Water St). * Put a TC at every H&R point on that sheet: the reversing manoeuvre and the AV left turn where it uses the opposing lane. * The RPEQ sheet notes the path encroaches the car park and the existing parking bays need to be removed or relocated. Please show those bays as closed on 19B/19C. * Replace CTMP Appendix I with this same sheet, so the TGS and CTMP match. * 20B (site inactive). With no TC on site after hours, please remove everything that only applies while we're working: the queue lengths (6 m / 22 m / 30 m / 45 m / 70 m), STOP HERE WHEN DIRECTED, PREPARE TO STOP, and the crane pick-up/slew and generator radius labels (R21000 / R22500 / R29000). Leave only the static road/footpath closure, detour and signs that actually stay up overnight. If the 40 km/h and DO NOT OVERTAKE signs stay on 20B, please show them covered. * 20A options sheet. The bus stop reasoning still says "Enter Reasoning" three times. Please fill it in the same way as 19A. * Risk table on 19A and 20A (please check 17A and 18A too) still says "No…
- 11 Nov 2026, 1:19 pm · Aisha Waver
can we please have this done today, I really need to get this sent to the client and application submitted. Thank you!
- 11 Nov 2026, 1:53 pm · S.B
@Aisha Waver Could you please ask other planner to fix these issues, @Rudra Khadka is offline today.
- 11 Nov 2026, 2:04 pm · Riri D.
@Janna can you review and takeover from here? We need this asap today hope you can help jump into this right away. Thanks!
- 11 Nov 2026, 3:06 pm · Riri D.
Rev 04
- 11 Nov 2026, 8:11 pm · Janna
hi @S.B hi team, Kindly check the folder Rev 04 for CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley Please reach out if there is additional info needed. Thanks! 2 x TGS Amendment (19A/B/C & 20A/B) 1 x TCMP Amendment thanks!
- 11 Nov 2026, 1:19 pm · Aisha Waver
- 11 Nov 2026, 10:38 am · Riri D. · CC05249-NMP - Rev 9 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Can we please get the NMP amended for Next DC - MPX. To match the approved road permit now, for the generator install. We currently have 3 lots of date ranges, but we need it to represent the permit we now have approved, which is 7th-10th December, no contingency weekends. Thank you! Noise Management Plan - OOH Works - Rev 08 2.pdf Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 09 Project location: NEXTDC B2 - Constance St, Valley Quote: none Job request form: none Request type: Amendment Scope: NMP
- 10 Nov 2026, 3:44 pm · S.B · CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Hi Rudra, * Truck path colours. This is the main one. "Reverse Truck Access" and "Vehicle Path" are both red in the legend, so the red line running the full length of Costin St from past Carriage St reads as the truck reversing that whole way. Please show the forward approach in magenta up to where the truck actually starts reversing, and keep red for the reverse leg only. Give "Vehicle Path" its own colour too (or drop it if it isn't needed). * 20B (site inactive) still has the 19B setup on it: the crane and truck in the work zone, the TC notes ("walk trucks out and manage H&R", "manage the affected driveways", "manage pedestrians on St Paul Tce") and the queue lengths on Costin and Water St. There won't be TCs on site after hours, so please strip all of that out and leave only the static closure/detour that stays up. The 20A reasoning ("Traffic controllers to alert vehicles after hours") needs updating to match. * Swept path in the CTMP. The appendix still has the July Rev A options via Gregory Tce / King St / Machinery St. None of them show Riri's movement (reverse into Costin, then nose out into Water St). Please add a swept path for the actual movement, coloured the same way as the TGS, so the H&R points line up with it. * Anderson St is one way. The END ROADWORK / 50 sign on Anderson (19C) only works if Anderson runs away from Water St. If the one-way flows into Water St, that approach needs advance warning (Roadwork Ahead / Prepare to Stop) instead. * 19B has "JOINS…
- 10 Nov 2026, 3:38 pm · S.B · CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley
* Truck path colours. This is the main one. "Reverse Truck Access" and "Vehicle Path" are both red in the legend, so the red line running the full length of Costin St from past Carriage St reads as the truck reversing that whole way. Please show the forward approach in magenta up to where the truck actually starts reversing, and keep red for the reverse leg only. Give "Vehicle Path" its own colour too (or drop it if it isn't needed). * AV left turn note on 19C. Ignore my earlier comment on this one. It's at Water/Baxter, not Anderson, so it's fine. * Anderson St. The END ROADWORK / 50 sign on Anderson only works if Anderson runs away from Water St. If the one-way flows into Water St, that approach needs advance warning (Roadwork Ahead / Prepare to Stop) instead. * 20B. Confirmed on the drawing: along with the TC notes and queue lengths, the crane and truck are still drawn in the work zone. For site inactive, please take all of that out. * Clipped callout. Ignore this one too. It's hidden under the insert, so nothing shows on the printed sheet. Cheers @Rudra Khadka
- 2 Nov 2026, 3:36 pm · Leo Escoton · CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @Aisha Waver and @Riri D., for review. Link: Sharepoint - Documents - Rev 08 - All Documents Accounts: 1x NMP - Work Schedule changed (Mon - Day 1 so on..); Remove Tower Crane Installation and move the Tower Crane Installation schedule to reflect on Tower Crane Dismantle 1x Letter to Residents 1x Letter to Councilor Note: Amended both Letter to Residents and Councilor and remove Tower Demobilisation/Dismantle so NMP and Letters are cohesive Thank you!
- 2 Nov 2026, 3:58 pm · Aisha Waver
@Leo Escoton - should the hours of work change, as the dates we are no requesting are essentilly monday to friday instead?
- 2 Nov 2026, 4:05 pm · Leo Escoton
Hi @Aisha , I've successfully updated the working hours from Friday to Monday to Monday to Friday to align with the revised work schedule. Thank you!
- 2 Nov 2026, 4:06 pm · Aisha Waver
thank you!
- 2 Nov 2026, 3:58 pm · Aisha Waver
- 2 Nov 2026, 12:12 pm · Leo Escoton · CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @S.B and @Riri, for review Link: NMP Account: 1x NMP - Added Tower Crane Demobilisation on existing NMP 1x Letter to Resident - Added Tower Crane Demobilisation 1x Letter to Councilor - Added Tower Crane Demobilisation Thank You!
- 2 Nov 2026, 12:42 pm · Christopher Wright
Approved again
- 2 Nov 2026, 1:27 pm · Riri D.
@Leo Escoton please update and move it back to Rev 08
- 2 Nov 2026, 12:42 pm · Christopher Wright
- 2 Nov 2026, 11:55 am · Riri D. · CC05249-S8 - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley
As discussed on teams, with regards to their NMP amendment—we will also need to amend the TGS as per markups above Save here: S8 New Main Works >
- 4 Nov 2026, 11:17 am · Riri D.
@Rudra Khadka the blue line is the trucks path. it will have to reverse up in to costin, then nose out into water st to be able to exit the site. The red dots are where we will require hold and release for this
- 5 Nov 2026, 3:32 am · Rudra Khadka
Hi @Aisha Waver @S.B @Riri D. Task is completed and uploaded to attached link below. Kindly let me know if this requires further adjustments. Link:https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts, 1 x TGS Amendment (19B/C) 1 x TMP ( Updated 19B/C on CTMP) Thank You!
- 9 Nov 2026, 1:22 pm · S.B
@Rudra Khadka Implement swept path direction correctly in the tgs (forward and reverse) with colour coding for forward and reverse Reference tc position properly Anderson st is one way
- 9 Nov 2026, 4:16 pm · Rudra Khadka
Hi @S.B Comments are amended and uploaded to its respective folder. If this requires any further changes kindly let me know. Thank You!
- 10 Nov 2026, 9:41 pm · Rudra Khadka
Hi @S.B Will you please confirm the swept path direction of 19B; i see it different what we have on CTMP and what i am told to do above from Rihana. Remaining other changes are made and uploaded to its respective folder. Thank You!
- 11 Nov 2026, 8:28 am · S.B
@Rudra Khadka Please use the Swept path from the RPEQ Folder Generator Installation Swept Path
- 4 Nov 2026, 11:17 am · Riri D.
- 2 Nov 2026, 11:50 am · Riri D. · CC05249-NMP - Rev 8 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Please amend NMP to include everything all together—generator installation, tower crane installation and dismantle. We will also require to amend their notification letter for both residents and councilor. The rest of the details will remain as is Save here: Generator Installation > Rev 03
- 30 Oct 2026, 12:10 pm · Leo Escoton · CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Amended, added Tower Crane Installation on the NMP 1x Letter to Council 1x Letter to Residents Thank you!
- 2 Nov 2026, 10:43 am · Christopher Wright
This appears to be GTG @Aisha Waver
- 2 Nov 2026, 10:43 am · Christopher Wright
- 30 Oct 2026, 11:38 am · Riri D. · CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle)
CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle) Aisha Waver Client review no charged as per Aisha
- 30 Oct 2026, 11:37 am · Riri D. · CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation) Aisha Waver Client review no charged as per Aisha
- 29 Oct 2026, 10:09 am · Riri D. · CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Sent to client Fw_ NMP - Generator Installation.eml
- 29 Oct 2026, 10:08 am · Riri D. · CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle)
Sent to client NMP - Tower Crane Dismantle Review.eml
- 28 Oct 2026, 4:31 pm · Leo Escoton · CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle)
Hi @Christopher Wright and @Riri D., for review Link: NMP Accounts: 1x NMP - Created NMP for Tower Crane Demobilization and reflected the correct dates. Thank you!
- 29 Oct 2026, 2:02 pm · Riri D.
@Leo Escoton can you make sure the letters to residents and councilor are done for this too
- 29 Oct 2026, 2:02 pm · Riri D.
- 28 Oct 2026, 3:28 pm · Leo Escoton · CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @Christopher Wright and @Riri D., for review. Link: NMP Accounts: 1x NMP - Remove any references for Tower Crane and updated the Schedule. Thank you!
- 29 Oct 2026, 11:19 am · Riri D.
@Leo Escoton NMP amendement please - Next DC constance - Generator install can we please add the tower crane Install works. Please also change the schedule of works from friday saturday etc to day 1 day 2 etc so its not so specific
- 29 Oct 2026, 2:02 pm · Riri D.
@Leo Escoton can you make sure the letters to residents and councilor are done as well
- 29 Oct 2026, 11:19 am · Riri D.
- 28 Oct 2026, 12:16 pm · Sandy · CC05249 - NMP - Multiplex - NEXTDC - Constance St, Fortitude Valley (Tower Crane Dismantle)
Hi Plans folder: Plans - CC05249 Suite: NMP Save work here: Tower Crane Dismantle > Rev 00 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: New Scope: NMP Specific operations: Client mark-ups/attachments: Any specific files the planner needs to refer to?
- 28 Oct 2026, 12:53 pm · Riri D.
@Leo Escoton we need to create a new NMP for the tower crane dismantle for Next DC - Constance, with the attached dates
- 29 Oct 2026, 6:56 am · Christopher Wright
This is GTG @Aisha Waver
- 28 Oct 2026, 12:53 pm · Riri D.
- 28 Oct 2026, 12:10 pm · Sandy · CC05249-NMP - Rev 7 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi Plans folder: Plans - CC05249 Suite: Save work here: NMP > Generator Installation > Rev 07 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations: Client mark-ups/attachments: Any specific files the planner needs to refer to?
- 28 Oct 2026, 12:53 pm · Riri D.
@Leo Escoton We need to remove the tower crane completely from this NMP. Amend the dates for the following
- 29 Oct 2026, 6:58 am · Christopher Wright
This is GTG @Aisha Waver
- 28 Oct 2026, 12:53 pm · Riri D.
- 19 Oct 2026, 11:53 am · Riri D. · CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
- 19 Oct 2026, 10:07 am · K.R · CC05249-NMP - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
No charge - Per Chelsea - Dates updated only
- 16 Oct 2026, 5:52 pm · A.A · CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
@Riri D. GTG
- 15 Oct 2026, 11:14 am · Sandy · CC05249-NMP - Rev 6 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi Plans folder: Plans - CC05249 Suite: NMP Save work here: Generator Installation > Rev 06 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations:Can we please get the NMP for Constance st actioned. We need to include the tower crane and miserton st works Client mark-ups/attachments: Any specific files the planner needs to refer to?
- 15 Oct 2026, 1:25 pm · Aisha Waver
the remaining of the email following the image from above
- 16 Oct 2026, 10:51 am · R.R
Hi @Aisha Waver @Christopher Wright, NMP uploaded here: Sharepoint - Documents - Rev 06 - All Documents Accounts: 1 NMP amendments
- 15 Oct 2026, 1:25 pm · Aisha Waver
- 13 Oct 2026, 2:52 pm · Riri D. · CC05249-NMP - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
- 7 Oct 2026, 5:02 pm · Permits · CC05249-NMP - Rev 5 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi, Save Work Here: Plans - CC05249 > NMP > Generator Installation > Rev 05 Folder Name: NEXTDC B2 - Constance St, Valley NO CHARGE. INSTRUCTIONS: change of dates of Misterton St... Generator Install Dates: Generator Installation Dates Activity Street Shift From To Duration Day / Night 20/11/2026 Friday 23/11/2026 Monday weekend Generator installation Constance St Day / Night 27/11/2026 Friday 30/11/2026 Monday weekend (contingency 1) Day / Night 4/12/2026 Friday 7/12/2026 Monday weekend (contingency 2) Day / Night 11/12/2026 Friday 14/12/2026 Monday weekend (contingency 3) Misterton St Loading Dock Demolition & Bulk Excavation works Dates: Misterton St Loading Dock Demolition & Bulk Excavation Dates Activity Street Shift From To Hours Noise Level Duration Shifts Loading Dock Demolition & Bulk Excavation Misterton St Night 19/10/2026 Monday 18/12/2026 Friday 18:30 - 12:00 High level noise 4 weeks (4 active weeks, 4 contingency weeks) 20 shifts (20 contingency shifts) New activity to be added to the NMP Tower Crane Dismantle Dates: Tower Crane Dismantle Dates Activity Street Shift From To Duration Tower Crane Dismantle Constance St Day / Night 05/12/2026 Friday 06/12/2026 Monday weekend Day / Night 12/12/2026 Friday 13/12/2026 Monday weekend (contingency 1) Schedule of works: Saturday 12:00am – 6:30am * Traffic Control set-up Constance St road closure (TGS Attached) * Borgers 500T to be unloaded off float into area off Gregory Terrace * LCL 150t & Borgers 500t crane to…
- 8 Oct 2026, 10:42 am · B.R
Hi @Aisha Waver, can I ask for a copy of the email? thank you!
- 8 Oct 2026, 12:30 pm · Aisha Waver
will try to attach it here - FW_ Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH_ Generator Installation).eml
- 8 Oct 2026, 8:08 pm · B.R
Hi @Christopher Wright, This is uploaded and for review. Thank you! NMP - Noise Management Plan - OOH Works - Rev 05.pdf Account: 1xNMP Amendment
- 9 Oct 2026, 6:19 am · Christopher Wright
This is GTG
- 9 Oct 2026, 2:37 pm · Aisha Waver
will send to client myself
- 8 Oct 2026, 10:42 am · B.R
- 30 Sep 2026, 12:13 pm · Riri D. · CC05249-NMP - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
The dates may be changing again. So please hold off on the amendment request.
- 29 Sep 2026, 2:05 pm · Leo Escoton · CC05249-NMP - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @A.A and @Riri D. for review CC05249 Accounts: 1x NMP Changes: Updated the Generator Installation and Loading Dock Demolition OOH schedules as instructed. Thank you!
- 30 Sep 2026, 10:57 am · K.R
@Leo Escoton this has not been updated per the new schedule in the email chain. Please update the schedule only. Can you please advise if you made any other changes?
- 30 Sep 2026, 11:15 am · Leo Escoton
Hi @K.R ! I must've uploaded the wrong file but everything's good now, the new and amended version of the file has been uploaded. Thank you!
- 30 Sep 2026, 10:57 am · K.R
- 29 Sep 2026, 10:21 am · Permits · CC05249-NMP - Rev 4 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi @Leo, Pls see instructions below. Main Project Folder: NEXTDC B2 - Constance St, Valley Save work here: NMP > Rev 04 Instructions as provided: "urgent noise management plan amendment. Very simple. if you could copy and paste the update schedule from the email below. Revise up the noise management plan, no other wording needs to be changed. We need to update the attached version. Need this done as soon as possible please." Email: FW Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH Generator Installation)_4807.eml File: Noise Management Plan - OOH Works_1123.pdf Any questions, kindly liaise with @Riri D. thanks thanks ~ clint
- 29 Sep 2026, 10:30 am · Riri D.
@Leo Escoton please message or mentioned me once done. THanks!
- 29 Sep 2026, 10:30 am · Riri D.
- 11 Sep 2026, 11:04 am · Sandy · CC05249-NMP - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude Valley (Generator Installation)
Hi Plans folder: CC05249 - NMP Suite: Save work here: NMP > Generator Installation > Rev 03 Project location: NEXTDC B2 - Constance St, Valley Quote: N/A Request type: Amendment Scope: NMP Specific operations: Please amend the dates as per email Client mark-ups/attachments: Generator Install _ Misterton St Loading Dock Permit Application Dates.eml
- 11 Sep 2026, 11:10 am · Riri D.
@B.R just update the current activity to the new one
- 11 Sep 2026, 2:11 pm · B.R
Hi @A.A, This is uploaded and for review. Thank you! Folder Link: Generator Installation > Rev 03 NMP - Noise Management Plan - OOH Works - Rev 03.pdf Account: 1xNMP Amendment
- 15 Sep 2026, 10:16 am · Riri D.
@B.R could you please check and see if the same details for their activities A007083310 Decision Notice.pdf Generator Install _ Misterton St Loading Dock Permit Application Dates.eml NMP.pdf RE_ Approved Permits – CC05249 - Multiplex - NextDC - Constance St, Fortitude Valley (OOH_ Generator Installation).eml
- 15 Sep 2026, 10:42 am · B.R
Hi @Riri D., upon checking the email. the approved hours is outdated and is based on the previous dates. The latest should be the below which is reflected on NMP Rev3
- 18 Sep 2026, 11:30 am · Riri D.
@Christopher Wright could you please assist in reviewing this? Thanks!
- 18 Sep 2026, 12:25 pm · Christopher Wright
This appears to be GTG @C.C
- 11 Sep 2026, 11:10 am · Riri D.
- 7 Sep 2026, 5:19 pm · Riri D. · CC05249-S8 - Rev 3 - Multiplex - NEXTDC - Constance St, Fortitude Valley
Please invoice @Sandy @Permits 4xTGS amendment (CC05249-S8-17B, CC05249-S8-18B, CC05249-S8-19B, CC05249-S8-20B) 1x TMP amendment
- 9 Sep 2026, 9:28 am · Permits
Invoice Sent to Client (IV0025206)- Karein (0909) Re_ RE_ Generator Install Swept Path.eml
- 9 Sep 2026, 9:28 am · Permits
06Every file and folder
1,561 files in 424 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|