Homestead Dr Stayplton (Eastridge Rd)
Engage Built
What's new
- 5 Nov 20268 files saved on SharePoint: TCP2026-62328.pdf, TCP2026-62328.eml, NTP TRC20263220.pdf, Important correspondence from City of Gold Coast.eml and 4 more
- 29 Oct 2026, 11:11 amPermits on CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton: IV0025760 draft as per QU-5749 - Shaz 2910
- 27 Oct 2026, 3:32 pmS.B on CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton: Posted by marie@cromptonconcepts.com.au (marie@cromptonconcepts.com.au) · @Marie Est via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * CC05519-S1-4A
- 27 Oct 2026, 12:25 pmSandy on CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton: Hi Plans folder: Plans - CC05519 Suite: Save work here: TGS > Rev 1 Project location: Homestead Dr Stayplton (Eastridge Rd) Quote: N/A Request type: Amendment Scope: TGS Specific operations: Job Request for with information saved in folder along with Water…
Crompton Concepts prepares the traffic management for Engage Built on this project at 6-10 Eastridge St, Stayplton, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (General Rev 01). On the permit boards: 0 permits in force and 2 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Engage Built
- Crompton job
- CC05519
- Location
- 6-10 Eastridge St, Stayplton, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- K.R
- Latest planner · TMD
- —
- Monday project status
- Planning in Process
- Deliverables
- Council Road Permit, RA, TGS, TMP, TA
- Permits (Monday)
- 0 in force · 2 in progress
- Last activity
- 11 Nov 2026
- Files on SharePoint
- 76 in 25 folders
What needs attention now
- Permit in progress: Water Connection Works (Gold Coast) is FEE PAID. Follow up 13 Nov 2026. Wanted from 18 Nov 2026.
- Permit in progress: TCP – Water Connection Works (TMR) is Received/Holding. Follow up 10 Nov 2026. Wanted from 17 Nov 2026.
PPermits
2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Water Connection Works Team Kerri · Gold Coast Permits - Kerri | Gold Coast | Date Specific | In progress FEE PAID | 18 Nov 2026 – 25 Nov 2026 | 28 Oct 2026 | 13 Nov 2026 | ||
| TCP – Water Connection Works Team Kerri · TMR Permits - Kerri | TMR | Date Specific | In progress Received/Holding | 17 Nov 2026 – 30 Nov 2026 | 12 Nov 2026 | 10 Nov 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC05519 - S1- CTMP - Construction - Engage Built - 6-10 Eastridge Street, Stapylton - Rev 1.pdfCTMP Rev 01 · 28 Oct 2026
- PDFmerge-598134325644389-2025-03-12T230428Z.pdf17 Mar 2025
- PDFCivil Package P1.pdf17 Mar 2025
- PDF6337 - ADR - Att A - Current Preliminary Approval.pdf17 Mar 2025
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLTCP2026-623285 Nov 2026
- EMLImportant correspondence from City of Gold Coast5 Nov 2026
- EMLurgent tmp gold coast council area3 Nov 2026
- MSGFW_ Stapylton TMP from QPS27 Jun 2025
- MSGDraft CMP Staypylton24 Mar 2025
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 28 Oct 2026 | 1 | CC05519 - S1- CTMP - Construction - Engage Built - 6-10 Eastridge Street, Stapylton - Rev 1.pdf |
| — | TMP | Rev 01 | 28 Oct 2026 | 1 | CC05519 - S1- TMP - Construction - Engage Built - 6-10 Eastridge Street, Stapylton - Rev 1.pdf |
| General | TGS | Rev 01 | 28 Oct 2026 | 1 | CC05519 - S1 - TGS - Construction - Engage Built - 6-10 Eastridge Street, Stapylton - Rev 1.pdf |
03Requests on Monday
2 requests since 20 Mar 2025: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton | Amendment | S1 | Rev 01 | Invoiced Invoiced | 27 Oct 2026 | 29 Oct 2026 | ||
| CC05519 - Engage - Homestead Drive Stayplton | New plans | Invoiced Invoiced | 20 Mar 2025 | 24 Mar 2025 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- 1. Invoices toaccounts@engage-group.com.au
- Jason Verdouw - PM0402654296
- Jason@engage-group.com.auJason@engage-group.com.au
- Steve Spraljasteve@engage-group.com.au
Crompton Concepts
- K.RProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 29 Oct 2026, 11:11 am · Permits · CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton
IV0025760 draft as per QU-5749 - Shaz 2910
- 2 Nov 2026, 5:58 pm · Riri D.
invoice to client
- 2 Nov 2026, 6:33 pm · Riri D.
CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton.eml
- 2 Nov 2026, 5:58 pm · Riri D.
- 27 Oct 2026, 3:32 pm · S.B · CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton
Posted by marie@cromptonconcepts.com.au (marie@cromptonconcepts.com.au) · @Marie Est via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * CC05519-S1-4A
- 27 Oct 2026, 12:25 pm · Sandy · CC05519- S1 - Rev 1 - Engage - Homestead Drive Stayplton
Hi Plans folder: Plans - CC05519 Suite: Save work here: TGS > Rev 1 Project location: Homestead Dr Stayplton (Eastridge Rd) Quote: N/A Request type: Amendment Scope: TGS Specific operations: Job Request for with information saved in folder along with Water connection drawings and OPW approval ( these docs to be added as an appendix). TGS to amend: 1x TGS Client mark-ups/attachments: Any specific files the planner needs to refer to? Job Request_Watermarked.pdf BRW405BD87E76F2_002893.pdf COM.2025.98 Decision_Notice_with_Cover_Letter.pdf
- 27 Oct 2026, 3:32 pm · Marie Est
Hello @S.B , The TGS S1 has already been amended and new TGS uploaded to the folder. Please review it at your convenience. * 1x New TGS on S1 (Rev 1) - CC05519-S1-4A (Service Connection Works - Footpath and Parking Lane Closure) Link: TGS - https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume… If there are any updates or further changes needed, please let me know. Thank you.
- 28 Oct 2026, 8:48 am · Christopher Wright
This is GTG @K.R
- 28 Oct 2026, 11:04 am · K.R
- 28 Oct 2026, 11:05 am · K.R
@Riri D. Ready for invoicing - Sent to client by me.
- 28 Oct 2026, 11:09 am · K.R
Quote Approval.eml For invoicing
- 27 Oct 2026, 3:32 pm · Marie Est
06Every file and folder
76 files in 25 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|