Crompton Concepts prepares the traffic management for McNab on this project at Scape Tribune St, South Brisbane, QLD. 3 Monday requests are open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 05; 5 TGS suites on file (S1 Rev 02, S2 Rev 06, S3 Rev 11, S5 Rev 00…). On the permit boards: 2 permits in force and 4 in progress. Monday holds 29 requests for this job (1 new, 28 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
McNab
Crompton job
CC05649
Location
Scape Tribune St, South Brisbane, QLD
LGA / authority
City of Brisbane
Project coordinator
C.C
Latest planner · TMD
Marie Est · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
2 in force · 4 in progress
Last activity
16 Nov 2026
Files on SharePoint
1,232 in 282 folders

What needs attention now

  1. Review comments to action: CC05649-S3 - Rev 11 - McNab - Scape Tribune St. Required by 18 Nov 2026. Planner: Marie Est · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Marie, Thanks, quick turnaround on this one. The Rev 11 cover note ("TGS amend for Road Work Ahead, Pedestrian Signs and Aftercare – 11 – 16/11/2026") is in, the title blocks…”
  2. Urgent TMD approved, ready to issue: CC05649- NMP - McNab - Scape Tribune St (External Water Works). Required by 13 Nov 2026 (overdue). Planner: Leo Escoton · Last note (12 Nov 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review Link: Sharepoint - Documents - External Water Works - All Documents Accounts: 1x NMP – Created Noise Management Plan for Tower…”
  3. TMD approved, ready to issue: CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours). Required by 14 Nov 2026 (overdue). Planner: Leo Escoton · Last note (12 Nov 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 01 - All Documents Account: 1x NMP = Amended the Project Specific Conditions, including the…”
  4. Permit in progress: OOH: Water Connection Works (BCC road) is Initial Pending. Follow up 18 Nov 2026. Wanted from 23 Nov 2026.
  5. Permit in progress: Road: Daily Arrangement (BCC road) is Council Pending. Follow up 21 Dec 2026. Wanted from 25 Dec 2026.
  6. Permit in progress: Early Works (Footpath) is Fee Quote/Notice to Pay Received / Sent. Follow up 18 Nov 2026. Wanted from 23 Oct 2026.
  7. Permit in progress: OOH: Concrete Pours (BCC road) is Initial Pending. Follow up 23 Nov 2026. Wanted from 3 Dec 2026.

PPermits

11 permit lines on the Monday permit boards: 2 in force, 4 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
OOH: Water Connection Works
Team Ethan · BCC Road Permits - Ethan
BCC roadDate SpecificIn progress
Initial Pending
23 Nov 2026 – 30 Nov 202613 Nov 202618 Nov 2026
Road: Daily Arrangement
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn progress
Council Pending
25 Dec 2026 – 25 Jan 202730 Oct 202621 Dec 202621 Dec 2026
Early Works
Team Ethan · BCC Footpath Applications - Ethan
FootpathOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
23 Oct 2026 – 31 Jan 20274 Nov 202618 Nov 202619 Nov 2026
OOH: Concrete Pours
Team Ethan · BCC Road Permits - Ethan
BCC roadDate SpecificIn progress
Initial Pending
3 Dec 2026 – 31 Mar 202713 Nov 202623 Nov 202616 Nov 2026
Footpath: Water Connection Works
Team Ethan · BCC Footpath Applications - Ethan
FootpathDate SpecificIn force
Done
2 Nov 2026 – 30 Nov 202630 Oct 2026
Workzone: 30m
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn force
Done
17 Sep 2026 – 31 Dec 202618 Sep 2026
Prelodgement Meeting
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONO
Done
CMP Application (Early Works)
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONO
Done
CMP Application (Main Works)
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONO
Done
Prestart Meeting (Early Works)
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONO
Done
Prestart Meeting (Main Works)
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONO
Done

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

29 requests since 12 May 2025: 1 for new plans and 28 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05649-S3 - Rev 11 - McNab - Scape Tribune StAmendmentS3Rev 11Review amendments
Internal Amendments
16 Nov 202618 Nov 2026Marie EstChristopher Wright
CC05649 - NMP - Rev 1 - McNab - Scape Tribune St (Concrete Pours)AmendmentNMPRev 01TMD approved
TMD Approved
12 Nov 202614 Nov 2026Leo Escoton
CC05649- NMP - McNab - Scape Tribune St (External Water Works) UrgentAmendmentNMPTMD approved
TMD Approved
11 Nov 202613 Nov 2026Leo Escoton
CC05649-S7 - Rev 11 - McNab - Scape Tribune StAmendmentS7Rev 11Closed
No Charge
2 Nov 20264 Nov 2026
CC05649-S7 - Rev 10 - McNab - Scape Tribune StAmendmentS7Rev 10Invoiced
Invoiced
13 Oct 202615 Oct 2026
CC05649-S3 - Rev 10 - McNab - Scape Tribune StAmendmentS3Rev 10Invoiced
Invoiced
25 Sep 202627 Sep 2026
CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours)AmendmentNMPInvoiced
Invoiced
14 Sep 202616 Sep 2026
CC05649-S3 - Rev 9 - McNab - Scape Tribune StAmendmentS3Rev 09Invoiced
Invoiced
24 Aug 202626 Aug 2026
CC05649-S3 - Rev 8 - McNab - Scape Tribune StAmendmentS3Rev 08Invoiced
Invoiced
14 Aug 202616 Aug 2026
CC05649-NMP - McNab - Scape Tribune StAmendmentNMPInvoiced
Invoiced
2 Jun 20264 Jun 2026
CC05649-S3 - McNab - Scape Tribune StAmendmentS3Closed
No Charge
20 May 202622 May 2026
CC05649-S2 - Rev 6 - McNab - Scape Tribune StCouncil RFIS2Rev 06Closed
No Charge
11 May 202613 May 2026
CC05649-S2 - Rev 5 - McNab - Scape Tribune StAmendmentS2Rev 05Invoiced
Invoiced
22 Apr 202624 Apr 2026
CC05649-S3 - Rev 5 - McNab - Scape Tribune StAmendmentS3Rev 05Invoiced
Invoiced
17 Apr 202619 Apr 2026
CC05649-S5 - McNab - Scape Tribune StAmendmentS5Closed
No Charge
9 Apr 202611 Apr 2026
CC05649-S2 - Rev 3 - McNab - Scape Tribune StAmendmentS2Rev 03Closed
No Charge
18 Mar 202620 Mar 2026
CC05649-S3- Rev 4 - McNab - Scape Tribune StAmendmentS3Rev 04Invoiced
Invoiced
16 Mar 202618 Mar 2026
CC05649-S2 - Rev 2 - McNab - Scape Tribune StAmendmentS2Rev 02Closed
No Charge
4 Mar 20266 Mar 2026
CC05649 - S1 + S2 - McNab - Scape Tribune StAmendmentS1Invoiced
Invoiced
23 Feb 202625 Feb 2026
CC05649-S3 - Rev 3 - McNab - Scape Tribune StAmendmentS3Rev 03Invoiced
Invoiced
17 Feb 202619 Feb 2026
CC05649-S1 - Rev 2 - McNab - Scape Tribune StAmendmentS1Rev 02Invoiced
Invoiced
5 Feb 20267 Feb 2026
CC05649-S3 - Rev 2 - McNab - Scape Tribune StAmendmentS3Rev 02Invoiced
Invoiced
30 Jan 20261 Feb 2026
CC05649-S1 & S2 - McNab - Scape Tribune StAmendmentS1Invoiced
Invoiced
30 Jan 20261 Feb 2026
CC05649-S3 - Rev 1 - McNab - Scape Tribune StAmendmentS3Rev 01Invoiced
Invoiced
18 Dec 202520 Dec 2025
CC05649-S1 & S2 - Rev 1 - McNab - Scape Tribune StAmendmentS1Rev 01Invoiced
Invoiced
17 Dec 202519 Dec 2025
CC05649-S3 - McNab - Scape Tribune StAmendmentS3Invoiced
Invoiced
10 Dec 202512 Dec 2025
CC05649-S2 - McNab - Scape Tribune StAmendmentS2Not proceeding
Not proceeding
9 Dec 202511 Dec 2025
CC05649-S1 - McNab - Scape Tribune StAmendmentS1Invoiced
Invoiced
3 Dec 20255 Dec 2025
CC05649 - McNab - Scape Tribune StNew plansInvoiced
Invoiced
12 May 202514 May 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • 1. Archived
  • CA Adam Read0421 409 053 · adam.read@mcnab.net.au
  • CA James Preston0407 698 799
  • CA Email Address
  • CA Phone Number
  • Email
  • Name - PM
  • Name - SM
  • Phone no
  • Safetyian.mcaway@mcnab.net.au
  • CA Aiden Watson0427 595 963
  • 0427 595 9630427 595 963
  • Aiden.Watson@mcnab.net.auAiden.Watson@mcnab.net.au
  • PM Gerard Harris0448 124 205
  • PM Email Address
  • PM Phone Number
  • Storm.Sandilands@mcnab.net.auStorm.Sandilands@mcnab.net.au

Crompton Concepts

  • Marie EstPlanner
  • Christopher WrightTMD
  • Leo EscotonPlanner
  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 16 Nov 2026, 3:47 pm · S.B · CC05649-S3 - Rev 11 - McNab - Scape Tribune St

    Hi Marie, Thanks, quick turnaround on this one. The Rev 11 cover note ("TGS amend for Road Work Ahead, Pedestrian Signs and Aftercare – 11 – 16/11/2026") is in, the title blocks are all at Rev 11 / 16/11, and on 2B, 3B, 4B, 12B and 15B the pedestrian long-term sign now reads FOOTPATH CLOSED AHEAD / USE OTHER FOOTPATH / PEDESTRIANS (arrow) rather than "AT SIGNALS". A few things to check: 1. Long-term signs on the other sheets * 6B, 7B and 14B still show the old "AT SIGNALS" plate. Long-term signs are the same on site whatever sheet is running, so if the installed sign is the Pedestrians/arrow version, please update those three as well. Otherwise the crew will see two different versions of the same sign across the deck. * The same applies to the RWA / Workman / Arrow (side streets) and RWA / Workman / DNO (approaches) sets. Please make sure 6B, 7B and 14B carry the same long-term sets as 4B, not just the five sheets listed in the request. 2. 13B Aftercare * Please add a 1.8 m dimension from the solid hoarding to the new fence line, and a note that pedestrians walk through on the slab and the fence closes off any access behind the barrier. That's the key part of the client's request, and I can't see it called out in the text. * The secondary pedestrian detour on the other side of Tribune St: please confirm it's drawn, with FOOTPATH CLOSED / USE OTHER FOOTPATH signs at the crossing points on both ends, and a kerb ramp / safe crossing location shown. * 13B still has several…

  2. 16 Nov 2026, 10:13 am · Riri D. · CC05649-S3 - Rev 11 - McNab - Scape Tribune St

    TGS: CC05649-S3-2B, 3B, 4B, 12B, 15B to be amended as per below Amend all long term signage to be in line with CC05649-S3-4B (Rev 6) which shows: * RWA / Workman / Arrow on each side street * On Each Approach it will be RWA / Workman / DNO This sign has been installed with a Ped Left Arrow, instead of "At Signals", please change: TGS: CC05649-S3-13B (Aftercare) - Please amend as per below: * Amend To add secondary Ped Detour to other side of Tribune St * Amend the fencing to be 1.8m wide from the site boundary and for Peds to be able to walk through the fencing and remove ability of movement behind the barrier (Site want to create a walkway on the slab that is 1.8m wide from their solid hoarding on the boundary of site outwards. * Adjust signage where applicable Please have the Amended TGS's saved here below: Plans folder: 3. Plans - CC05649 Suite: S3 - Main Works Save work here: TGS > Rev 11 Project location: Scape Tribune St Quote: none Job request form: none Request type: Amendment Scope: TGS

    • 16 Nov 2026, 1:06 pm · Marie Est

      Hello @Christopher Wright, The TGS S3 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x TGS Amendment - CC05649-S3-2B, 3B, 4B, 12B, 15B (RWA signs and Ped Sign) - CC05649-S3-13B (Aftercare - additional detour and remove diversion) Link: ⁠TGS - Rev 11

  3. 12 Nov 2026, 5:15 pm · Ethan Mathews · CC05649-S7 - Rev 11 - McNab - Scape Tribune St

    @Riri D. / @Permits / @Lexi R ACCOUNTS - No Charge as per Ethan

  4. Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - Rev 01 - All Documents Account: 1x NMP = Amended the Project Specific Conditions, including the approved hours of work and the concrete pour schedule (16 scheduled dates with a 5:00 AM start). Thank you!

    • 13 Nov 2026, 1:46 pm · D.B

      TMD Approved

  5. Hi @Christopher Wright and @Riri D., for review Link: Sharepoint - Documents - External Water Works - All Documents Accounts: 1x NMP – Created Noise Management Plan for Tower Crane Installation and Sewer Connection Works at Scape Tribune Street, including project-specific work details and schedules. Thank you!

    • 13 Nov 2026, 12:04 pm · Riri D.

      @Leo Escoton please remove tower crane from the water works NMP

    • 13 Nov 2026, 12:25 pm · Leo Escoton

      Hi @Riri D., already removed Tower Crane Installation from NMP. Thank you!

    • 13 Nov 2026, 2:08 pm · Leo Escoton

      Hi @Riri D. @Christopher Wright, I can't seem to upload the word file on Sharepoint as their is an ongoing issue with Microsoft right now. However, I was able to send Rih the items on Teams. Thank you!

    • 13 Nov 2026, 2:09 pm · D.B

      @Leo Escoton, please disregard the NMP, currently working on the current one

  6. Can get the NMP for Concrete pours amended to have the below included Plans folder: 3. Plans - CC05649 Suite: NMP Save work here: Concrete Pours > Rev 01 Project location: Scape Tribune St Quote: none Job request form: none Request type: Amendment Scope: NMP

  7. NMP Amendment for their external water works to include the attached Aidens email from site: These works will start on the 23rd of November between 12:30am and 4:30am and will be completed using the attached TGS's and they would like 24th, 25th and 26th as a contingency period Can we please also include in the NMP a section that includes the correspondence UniLodge and Urban Utilities as per the attached. Please save the files below: Main Folder Link: Scape Tribune St NMP: External Water Works Docs: CC05649-S7-TGS-Rev11.pdf Re_ 149 Merivale St Southbank - 26-PNT-88924 - .eml

  8. 2 Nov 2026, 4:47 pm · Ethan Mathews · CC05649-S7 - Rev 11 - McNab - Scape Tribune St

    @Riri D. I have shown @K.G this amendment and been advised GTG - Changing to "TMD Approved" and sending to client now.

  9. 2 Nov 2026, 2:27 pm · Riri D. · CC05649-S7 - Rev 11 - McNab - Scape Tribune St

    Please move the barrier board back and footpath closed sign slightly back and amend the Ped detour to be able to show peds going across the road under the bridge and back around the other side of Tribune St. Please also make this clear here that the pedestrians cannot travel past site side footpath and will need to go into the live lane under hold and release with TC assisting managing vehicles from the lane way and holding traffic for them to detour into the live lane under hold and release on site side: 3. Plans - CC05649 Save here: S7 - One off Activities > Rev 11

    • 2 Nov 2026, 3:52 pm · Janna

      hi @Riri D. Kindly check the folder Rev 11 for CC05649-S7 - Rev 11 - McNab - Scape Tribune St. Please reach out if there is additional info needed. Thanks! 1 x TGS Pedestrian Detour Amendment

  10. 29 Oct 2026, 1:09 pm · Sandy · CC05649-S3 - Rev 10 - McNab - Scape Tribune St

    ✓ IV0025765 - draft waiting for approval (2910)

    • 2 Nov 2026, 5:20 pm · Riri D.

      invoice to client

    • 2 Nov 2026, 6:04 pm · Riri D.

      Scape Tribune - Harmonise TGS.eml

  11. 29 Oct 2026, 1:02 pm · Sandy · CC05649-S7 - Rev 10 - McNab - Scape Tribune St

    ✓ Invoice IV0025763 - draft waiting for approval (2910)

    • 2 Nov 2026, 5:12 pm · Riri D.

      invoice to client

    • 2 Nov 2026, 6:07 pm · Riri D.

      Re_ Scape 2 - Water Connection - TGS UPDATE.eml

  12. 29 Oct 2026, 9:01 am · Ethan Mathews · CC05649-S7 - Rev 10 - McNab - Scape Tribune St

    @Riri D. / @Permits / @Lexi R - ACCOUNTS: To be invoiced as per below Accounts: 4xTGS Add'l - CC05649-S7-12A/B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-13A/13B - External Service Works - Northbound Closure (Site Inactive) - CC05649-S7-14A/14B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-15A/15B - External Service Works - Northbound Closure (Site Inactive)

  13. 29 Oct 2026, 8:52 am · Ethan Mathews · CC05649-S3 - Rev 10 - McNab - Scape Tribune St

    @Permits / @Lexi R / @Riri D. - To be invoiced: x2 TGS: CC05649-S3-14A/14B - Harmonisation Plan 1: Road Closure (CC05649-S7-10B) and Parking Lane Closure (CC05649-S6-16B) CC05649-S3-15A/15B - Harmonisation Plan 2: Road Closure (CC05649-S7-10B) and Shuttle Flow (CC05649-S6-17B)

  14. Invoice per quote

    • 21 Oct 2026, 6:54 pm · Permits

      Invoice sent to client - Iris (211026) IV0025658 Invoice IV0025658 for CC05649 - NMP - McNab - Scape Tribune St (Concrete Pours).eml

  15. 16 Oct 2026, 4:40 pm · A.A · CC05649-S7 - Rev 10 - McNab - Scape Tribune St

    @Riri D. GTG

  16. 15 Oct 2026, 9:34 am · Riri D. · CC05649-S7 - Rev 10 - McNab - Scape Tribune St

    Plans sent to client - Re_ Scape 2 - Water Connection - TGS UPDATE.eml

    • 15 Oct 2026, 3:56 pm · Riri D.

      amended plans sent to client Re_ Scape 2 - Water Connection - TGS UPDATE.eml

  17. 13 Oct 2026, 9:17 am · Sandy · CC05649-S7 - Rev 10 - McNab - Scape Tribune St

    Hi Plans folder: 3. Plans - CC05649 Suite: S7 - One off Activities Save work here: TGS > Rev 10 Project location: Scape Tribune St Quote: QU5701 Request type: Amendment Scope: TGS Specific operations: We will need to put together x4 New TGS (x2 Site Active and x2 Site Inactive). Please see attached correspondence and accepted quote to refer to with info for the TGS requirements. TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to? Quote QU5701 - External Water Works Planning Estimate.pdfExternal Water Works Correspondence.pdf

    • 13 Oct 2026, 1:53 pm · B.R

      Hi @Ethan Mathews, can you confirm if the waterworks will be limited to this area only based on the markup. Thank you!

    • 13 Oct 2026, 2:40 pm · Riri D.

      @B.R

    • 13 Oct 2026, 2:45 pm · Riri D.

      @B.R

    • 14 Oct 2026, 10:38 am · B.R

      Hi @S.B, This is uploaded and for review. Thank you! Folder Link: Rev 10 TGS - CC05649-S7-TGS-Rev10.pdf Accounts: 4xTGS Add'l - CC05649-S7-12A/B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-13A/13B - External Service Works - Northbound Closure (Site Inactive) - CC05649-S7-14A/14B - External Service Works - Northbound Closure (Site Active) - CC05649-S7-15A/15B - External Service Works - Northbound Closure (Site Inactive)

    • 15 Oct 2026, 1:55 pm · Riri D.

      @B.R Delete out 11A/11B to avoid confusion. We’ll look to get pedestrians back onto the footpath before the intersection – Crompton have installed a permanent sign in the kerb ramp where your temp ramp is showing. Please update and then good enough to go in.

    • 15 Oct 2026, 3:15 pm · B.R

      HI @S.B, This is re-uploaded. let me know if there are any changes needed. Thank you! - Deleted TGS 11A/B - TGS 14A/B - Temporary Ramp removed on the intersection.

  18. 25 Sep 2026, 3:55 pm · Permits · CC05649-S3 - Rev 10 - McNab - Scape Tribune St

    Hi @Y.B Please save work here: S3 - Main Works > Rev 10 Project folder: Scape Tribune St @Ethan Mathews will add details. Thank you - Shaz

    • 25 Sep 2026, 4:06 pm · Riri D.

      @Y.B The tgs for scape McNab in one off arrangements is a road closure of Colchester to be harmonised with a parking lane closure on tribune and another one with a 2 lnae closure on tribune with a shuttle flow Those parking lane and 2 lane closure have been designed in the prior to barrier installation suite

    • 29 Sep 2026, 1:18 pm · Y.B

      Hi @Christopher Wright, I've added 2x additional TGS in the suite. Please let me know if any changes are required. Thank you! 2x Additonal TGS (Hamonisation plans from S6 and S7) 1. CC05649-S3-14A/14B - Harmonisation Plan 1: Road Closure (CC05649-S7-10B) and Parking Lane Closure (CC05649-S6-16B) 2. CC05649-S3-15A/15B - Harmonisation Plan 2: Road Closure (CC05649-S7-10B) and Shuttle Flow (CC05649-S6-17B) REV 10: Sharepoint - Documents - Rev 10 - All Documents TGS Reference S6: Sharepoint - Documents - S6 - Plans prior to Barrier - All Documents S7: Sharepoint - Documents - S7 - One off Activities - All Documents

    • 29 Sep 2026, 1:43 pm · Christopher Wright

      This is GTG

  19. 14 Sep 2026, 2:42 pm · Permits · CC05649-S3 - Rev 9 - McNab - Scape Tribune St

    ✓ Invoice IV0025262 (14 Sep) - Clint 1x Addt'l TGS Invoice IV0025262 from Crompton Concepts for S3- Rev 8 and Rev 9 - McNab - Scape Tribune St.eml

  20. 14 Sep 2026, 2:42 pm · Permits · CC05649-S3 - Rev 8 - McNab - Scape Tribune St

    ✓ Invoice IV0025262 (14 Sep) - Clint 2x Addt'l TGS Invoice IV0025262 from Crompton Concepts for S3- Rev 8 and Rev 9 - McNab - Scape Tribune St.eml

  21. Hi Plans folder: Plans - CC05649 Suite: NMP Save work here: NMP > Concrete Pours Project location: Scape Tribune St Quote: QU5566 Request type: New Scope: NMP Specific operations: to be completed for concrete pours early start of 4:30 am Client mark-ups/attachments: Quote QU5566 (1).pdf Re_ Quote - OOH Permit for concrete pours - Scape.eml

    • 14 Sep 2026, 3:57 pm · R.R

      Hi @Sandy @C.C , May I request the following info: 1. What is the schedule for the concrete pours? (Date) 2. I’ve listed the tools typically used during concrete pouring. Could you please confirm if these are the tools required and advise if any additional equipment will be needed? (WIP) file uploaded here: Sharepoint - Documents - WIP - All Documents

    • 14 Sep 2026, 5:30 pm · Riri D.

      @R.R I have asked the site for this and will update you one they replied back

    • 15 Sep 2026, 9:13 am · Riri D.

      @R.R Hi Rihana, If we have an early concrete pour in will involve the following only * Plug in pump – i.e. truck with hopper and pump connected to concrete line pump. * Concrete truck – when pouring * Concrete vibrator * Person hoist – electric * Satellite pump from top of jump – electric It will be mainly the set up with pump arriving, connection of line and then the use of the hoist to get men up. Concrete would be called and will vary arriving on site between 6.00am and 6.30am and would start pump shortly after it arrival. ------------------------------ Hi Rihana, Following on from Matt’s email, we don’t have dates at this stage. We are planning ahead given it takes 6-8 weeks to get approval so we have a permit available over summer if we need it. RE_ Quote - OOH Permit for concrete pours - Scape.eml

    • 15 Sep 2026, 12:38 pm · R.R

      Hi @A.A @C.C , NMP for concrete pours uploaded here: Sharepoint - Documents - Concrete Pours - All Documents Thank you. Accounts: 1x NMP

    • 18 Sep 2026, 11:31 am · Riri D.

      @Christopher Wright could you please assist in reviewing this? Thanks!

    • 23 Sep 2026, 12:49 pm · Christopher Wright

      This appears to be GTG

  22. 10 Sep 2026, 7:15 pm · Riri D. · CC05649-S3 - Rev 9 - McNab - Scape Tribune St

    Chelsea team catch up 10-09-26.pdf Invoice along with S3- Rev 8 1xAdd'l TGS CC05649-S3-17A/17B - Concrete Pouring - Shuttle Flow

  23. 10 Sep 2026, 7:14 pm · Riri D. · CC05649-S3 - Rev 8 - McNab - Scape Tribune St

    Chelsea team catch up 10-09-26.pdf Invoice along with S3- Rev 9 2xAdd'l TGS (S3-Rev08-14A/B & S3-Rev08-15A/B)

06Every file and folder

1,232 files in 282 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved