33 Bay Terrace (BDCM) - Panorama Apartments

BDCM

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for BDCM on this project at 33Bay Terrace, Wynnum, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 09; 3 TGS suites on file (S1 Rev 09, S2 Rev 00, S3 Rev 01). Monday holds 12 requests for this job (0 new, 12 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
BDCM
Crompton job
CC05979
Location
33Bay Terrace, Wynnum, QLD
LGA / authority
City of Brisbane
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP, Council Road Permit, Footpath Permit
Permits (Monday)
None on the permit boards
Last activity
28 Oct 2026
Files on SharePoint
449 in 154 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0911 Sep 202610CC05979-CTMP-Rev09.pdf
—TMPRev 0911 Sep 20265CC05979-TMP-Rev09.pdf
—RARev 0111 Sep 20262CC05979-RA-Rev01.pdfCC05979-RA.pdf
S1TGSRev 0911 Sep 202610CC05979-TGS-S1-Rev09.pdf
S2TGSRev 0011 Sep 20261CC05979-TGS-S2-Rev00.pdf
S3TGSRev 0130 Nov 20252CC05979-S3-TGS-Rev 01.pdf

03Requests on Monday

12 requests since 14 Oct 2025: 0 for new plans and 12 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC05979-S1 - Rev 9 - BDCM - 33 Bay TerraceAmendmentS1Rev 09Closed
No Charge
8 Sep 202610 Sep 2026
CC05979-S1 - Rev 8 - BDCM - 33 Bay TerraceAmendmentS1Rev 08Closed
No Charge
4 Sep 20266 Sep 2026
CC05979-S1 - Rev 7 - BDCM - 33 Bay TerraceAmendmentS1Rev 07Closed
No Charge
7 Aug 20269 Aug 2026
CC05979-S1 - Rev 06 - BDCM - 33 Bay TerraceAmendmentS1Rev 06Invoiced
Invoiced
15 Jul 202617 Jul 2026
CC05979-S1 - Rev 5 - BDCM - 33 Bay TerraceAmendmentS1Rev 05Invoiced
Invoiced
26 Mar 202628 Mar 2026
CC05979-S1 - Rev 4 - BDCM - 33 Bay TerraceAmendmentS1Rev 04Invoiced
Invoiced
18 Mar 202620 Mar 2026
CC05979-S1 - Rev 3 - BDCM - 33 Bay TerraceAmendmentS1Rev 03Invoiced
Invoiced
17 Mar 202619 Mar 2026
CC05979 - S1 - Rev 2 - BDCM - 33 Bay TerraceAmendmentS1Rev 02Invoiced
Invoiced
23 Feb 202625 Feb 2026
CC05979-S1 - Rev 1 - BDCM - 33 Bay TerraceAmendmentS1Rev 01Closed
No Charge
10 Feb 202612 Feb 2026
CC05979-S3 - BDCM - 33 Bay TerraceAmendmentS3Invoiced
Invoiced
29 Nov 20251 Dec 2025
CC05979-S1 - BDCM - 33 Bay TerraceAmendmentS1Closed
No Charge
16 Oct 202518 Oct 2025
CC05979-S2 - BDCM - 33 Bay TerraceAmendmentS2Invoiced
Invoiced
14 Oct 202516 Oct 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Accounts07 3348 3346
  • All Invoices to be sent to Accounts &accounts@bdcm.com.au
  • PM Adam Kachyckyj0439 723 589
  • SM Michael Whitford0425612348
  • SM Email Address
  • SM Phone Number
  • WHS Ryan Alexiou0417042840
  • WHS Email Address
  • WHS Phone Number

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 17 Sep 2026, 8:42 am · K.R · CC05979-S1 - Rev 9 - BDCM - 33 Bay Terrace

    No Charge - Requested by Mark.

  2. 17 Sep 2026, 8:27 am · K.R · CC05979-S1 - Rev 8 - BDCM - 33 Bay Terrace

    No Charge - Advised by Mark

  3. 11 Sep 2026, 4:24 am · C.R · CC05979-S1 - Rev 9 - BDCM - 33 Bay Terrace

    Hi @K.R , This is now for Mark's final approval. I polished the set of traffic guidance schemes based on our last call. We also changed the reviewer to his name and OP#. Aside from that, there were internal discussions between him and I on how this would go forward. If there are questions, please don't hesitate to reach out and I'll be more than happy to discuss. Thanks. Accounts: 2xTGS Amendment 1xAdd'l TGS 1xAdd'l Long-Term Signage Plan 1xRA Amendment 1xTMP Amendment Note: 10 TGS's were asked to be removed from the suite. Links: TMP - Rev09 TGS - Client Folder (Mark)

    • 11 Sep 2026, 3:21 pm · C.R

      Hi @Christopherand @K.R , TMP amended following the changes made on the TGS suite. For final review. Thank you!

  4. 10 Sep 2026, 8:08 am · A.A · CC05979-S1 - Rev 8 - BDCM - 33 Bay Terrace

    @Riri D. GTG

  5. 9 Sep 2026, 5:10 pm · C.R · CC05979-S1 - Rev 9 - BDCM - 33 Bay Terrace

    Hi team, Sending here the tentative set of amended plans for 33 Bay Terrace. This was also sent to Mark for client's initial review. I'll continue with the TMP tomorrow. Thanks. Link: Sharepoint - Documents - Client Folder (Mark) - All Documents

    • 9 Sep 2026, 6:37 pm · C.R

      For tracking, Major change for this allocation. We will be scratching most of the original plans and will only be keeping 2 out of all 12 Traffic Guidance Schemes and an additional TGS is requested by Mark for the half-road closure on Bay Terrace.

  6. 8 Sep 2026, 2:47 pm · K.R · CC05979-S1 - Rev 9 - BDCM - 33 Bay Terrace

    @C.R Chris had made notes in the rapid file of the latest revision. Could you please update the plans and TMP to reflect the comments from Chris in Rev 8 Rapid Folder. We will also need to create a long term signage plan based on the Half Road with Detour/Road Closure Plan - Whichever has the most signs. Essentially we want to install as much as possible to reduce the need for a ute on site. S1 - Plans Folder Rev 08 - Rapid file contains TMD Conments for updates required Rev 09 - New Plans here. Essentially we need to reduce signage as much as possible for this site (still remaining compliant).

    • 8 Sep 2026, 4:34 pm · C.R

      For tracking, I recently reached out to Chris regarding some minor confirmations. I'll probably get to talk to him tomorrow when he's back in the office. Thanks.

  7. 8 Sep 2026, 2:42 pm · Permits · CC05979-S1 - Rev 9 - BDCM - 33 Bay Terrace

    Hi @C.R, Kindly see instruction below: Plans Folder: Plans - CC05979 Suite: S1 Please save work here: TGS > Rev 09 Project Location: 33 Bay Terrace (BDCM) Quote: none Request type: TGS Amendment Scope: TGS only Specific operations: @K.R to add details TGS to amend: Kerri to confirm Client mark-ups/attachments: requested by Kerri via teams thanks thanks ~ clint

    • 15 Sep 2026, 12:05 pm · Christopher Wright

      This is GTG @K.R

  8. 4 Sep 2026, 9:17 am · Sandy · CC05979-S1 - Rev 8 - BDCM - 33 Bay Terrace

    Plans folder: Plans - CC05979 Suite: S1 Save work here: TGS > Rev 08 TMP > Rev 08 Project location: 33 Bay Terrace (BDCM) Quote: N/A Request type: Amendment Scope: TGS Specific operations: TGS - CC05979-S1-4B & 7B- add PTS Hold and release Thank you!

    • 4 Sep 2026, 9:42 am · Riri D.

      @Rudra Khadka amend TGS - CC05979-S1-4B & 7B and add PTS Hold and release. Also, update CTMP

    • 5 Sep 2026, 8:44 pm · Rudra Khadka

      Hi @C.C @A.A Work is amended and uploaded to its respective folder. Accounts, 2 x TGS 1 x TMP (Full) Thank You!!

    • 8 Sep 2026, 9:36 am · Riri D.

      @Rudra Khadka as per Kelly A few corrections needed on the TGS's for this job: The one-way detour needs to remain in place, as per the previous revision. We also need to add a "Prepare to Stop" sign in the opposite direction of the closure, as they are currently holding the second lane. Could you please also go through all the TGS's and ensure TC's have been added where required — for example, 7B currently shows no TC's, which is incorrect and needs to be corrected. Lastly, as 7B is now becoming their daily arrangement, please add an aftercare component for this as well. Thanks

    • 8 Sep 2026, 10:33 pm · Rudra Khadka

      Hi, @Riri D. Changes are made and uploaded to its respective folder. Thank You!

06Every file and folder

449 files in 154 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved