Crompton Concepts prepares the traffic management for Graya on this project at 67 Racecourse Rd, Hamilton, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 14; 3 TGS suites on file (General no rev, S1 Rev 14, S2 Rev 08). On the permit boards: 0 permits in force and 2 in progress. Monday holds 15 requests for this job (0 new, 15 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Graya
Crompton job
CC06008
Location
67 Racecourse Rd, Hamilton, QLD
LGA / authority
—
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, RA, TMP
Permits (Monday)
0 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
432 in 86 folders

What needs attention now

  1. Permit in progress: Footpath (Footpath) is FEE PAID. Follow up 19 Nov 2026. Wanted from 26 Oct 2026.
  2. Permit in progress: Road (BCC road) is Council Pending. Follow up 14 Dec 2026. Wanted from 19 Dec 2026.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Footpath
Team Declan · BCC Footpath Applications - Declan
FootpathDate SpecificIn progress
FEE PAID
26 Oct 2026 – 17 Jan 202711 Sep 202619 Nov 20263 Dec 2026
Road
Team Declan · BCC Road Permits - Declan
BCC roadOngoingIn progress
Council Pending
19 Dec 2026 – 18 Jan 20276 Nov 202614 Dec 202614 Dec 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 145 Sep 202610CC06008-S1-S2-CTMP-Rev14 - The Gallery.pdf
—TMPRev 145 Sep 202610CC06008-S1-S2-TMP-Rev14 - The Gallery.pdf
—RARev 085 Sep 20267CC06008-S1-S2-RA-Rev08.pdf
GeneralTGSno rev28 Sep 20260Energex Footpath Works TGS.pdf
GeneralWorkzone planno rev13 Apr 20260Workzone Kent St.pdf
S1TGSRev 146 Oct 202610CC06008-S1-TGS-Rev14 (Compressed).pdfCC06008-S1-TGS-Rev14 - Stage 1 - The Gallery.pdf
S2TGSRev 0828 Sep 20264CC06008-S2-TGS-Rev08 - Stage 2 - The Gallery.pdf

03Requests on Monday

15 requests since 12 Nov 2025: 0 for new plans and 15 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06008-TMP - S2 - Rev 9 - Graya-The Gallery, Racecourse RDAmendmentTMPRev 09Closed
No Charge
27 Oct 202629 Oct 2026
CC06008-S2 - Rev 8 - Graya - The Gallery, Racecourse RDAmendmentS2Rev 08Closed
No Charge
21 Sep 202623 Sep 2026
CC06008-S1 - Rev 14 - Graya - The Gallery, Racecourse RDAmendmentS1Rev 14Closed
No Charge
4 Sep 20266 Sep 2026
CC06008-S2 - Rev 7 - Graya - The Gallery, Racecourse RDAmendmentS2Rev 07Invoiced
Invoiced
31 Aug 20262 Sep 2026
CC06008-S2 - Rev 6 - Graya - The Gallery, Racecourse RDAmendmentS2Rev 06Closed
No Charge
27 Aug 202629 Aug 2026
CC06008-S1 - Rev 13 - Graya - The Gallery, Racecourse RDAmendmentS1Rev 13Invoiced
Invoiced
3 Aug 20265 Aug 2026
CC06008-S1 - Rev 12 - Graya - The Gallery, Racecourse RDCouncil RFIS1Rev 12Invoiced
Invoiced
16 Jul 202618 Jul 2026
CC06008-S1 - Rev 11 - Graya - The Gallery, Racecourse RDCouncil RFIS1Rev 11Closed
No Charge
9 Jul 202611 Jul 2026
CC06008-S1 - Rev 9 - Graya - The Gallery, Racecourse RDAmendmentS1Rev 09Invoiced
Invoiced
2 Jul 20264 Jul 2026
CC06008 - S1 - Rev 7 - Graya - The Gallery, Racecourse RDAmendmentS1Rev 07Closed
No Charge
22 May 202624 May 2026
CC06008 - S1 - Rev 6 - Graya-The Gallery, Racecourse RDCouncil RFIS1Rev 06Invoiced
Invoiced
15 May 202617 May 2026
CC06008 - S1 - Rev 5 - Graya-The Gallery, Racecourse RDAmendmentS1Rev 05Closed
No Charge
24 Mar 202626 Mar 2026
CC06008-S1 -Rev 4 - Graya-The Gallery, Racecourse RDAmendmentS1Rev 04Invoiced
Invoiced
12 Jan 202614 Jan 2026
CC06008 - S1 - Rev 3 - Graya-The Gallery, Racecourse RDAmendmentS1Rev 03Closed
No Charge
25 Nov 202527 Nov 2025
CC06008 - S1 - Rev 2 - Graya-The Gallery, Racecourse RDAmendmentS1Rev 02Closed
No Charge
12 Nov 202514 Nov 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archive !!
  • George Tarabaygeorget@graya.com.au
  • ACCTSadmin@grayaconstruction.com.au
  • Dan Munrodanm@graya.com.au
  • Danilo Gigovicdanilog@graya.com.au
  • David Campbell-burnsdavid@graya.com.au
  • Kenzie Gargankenzieg@graya.com.au
  • Oliver Raywardoliver@graya.com.au
  • Zac Fisher -   zacfisher@graya.com.au
  • Zye Carrzyec@graya.com.au

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Plans folder: Plans-CC06008 Suite: S2 - Construction (Stage 2) Save work here: TMP > Rev 09 Project location: The Gallery, Racecourse Rd Quote: N/A Request type: Amendment Scope: TMP Specific operations: CC06008 amendment TMP S2 rev 09 TMP only amendment Client mark-ups/attachments: Any specific files the planner needs to refer to? CC06008-S1-S2-CTMP-Rev06 - The Gallery (1).pdf

    • 27 Oct 2026, 2:33 pm · Riri D.

      @Janna We need the TMP updated to reflect all amendments made to both S1 and S2 of the TGSs please. Use S2 TMP and amend it please

    • 28 Oct 2026, 1:33 pm · Janna

      Hi team, Kindly check the folder Rev 09 for the updated CTMP for CC06008 S2 Thanks,

    • 29 Oct 2026, 11:40 am · Christopher Wright

      This is GTG

  2. Hi Plans folder: Plans-CC06008 Suite: S2 - Construction (Stage 2) Save work here: TGS > Rev 08 Project location: The Gallery, Racecourse Rd Email Attached: Fw The Gallery _ Tower Crane Install Options.eml Thank you! 🧡Kim

    • 22 Sep 2026, 9:24 am · Riri D.

      @Santosh Giri See below TGS we need to amend and add into our next cycle of TGS’s. CC06008-S2-9B-Rev 7 and CC06008-S2-11B Rev 7 We are currently locking in the crane installation options for the two possible scenarios under the TGSs mentioned. For the Kent Street TGS, 9B, the mobile crane will need to remain on the road overnight, with 24-hour traffic control in place. Delivery trucks will also need to travel south down Racecourse and then reverse into Kent Street for unloading. I have marked this up below. Client are planning to install the crane on Thursday 15th and Friday 16th October. However, we will require the TGS to remain in place for two weeks to allow for any delays due to bad weather.

    • 22 Sep 2026, 6:03 pm · Santosh Giri

      Hi @Permits @Christopher Wright I have amended TGS 9B/11B to include the hold-and-release arrangement for truck access to the site via reverse movement and have also updated the CTMP accordingly. The updated documents are now available for your review. Link: Rev 08 Accounts, 2 X TGS Amendment 1 X CTMP Amendment Thank you.

    • 23 Sep 2026, 11:51 am · Christopher Wright

      Hi @Santosh Giri the TC's for TGS 9B are too close to the signalised intersection. Please also ensure the "End of Roadwork" sign is past the queue length.

    • 23 Sep 2026, 1:53 pm · Santosh Giri

      Hi @Christopher Wright, Updated plans are available for your review, please let me know if any further changes are required. Link: Rev 08 Thank you.

    • 23 Sep 2026, 1:56 pm · Christopher Wright

      This is GTG

  3. @D.B could you please review for invoicing. I understand that the methodology has changed a few times. This was the original request that I did. If you have already charged, we may not be able to charge for a number of changes.

  4. Hi @Permits please send invoice IV0025243 to client please. Let me know once completed.

    • 11 Sep 2026, 5:07 pm · Permits

      ✓ Invoice: IV0025243 Dec ✓ Sent to client 🧡Kim Invoice IV0025243 from Crompton Concepts for CC06008-S2 - Rev 7 - Graya - The Gallery, Racecourse RD.eml

  5. Hi @B.R, Please see below. Add new TGS (24/7) - add site sheds on the ground occupying each side of the driveway with pedestrian detour sent around like below. Amend to the TMP pls

    • 4 Sep 2026, 1:55 pm · B.R

      Hi @D.B, just wanted to clarify the scope of works for this. Could you please advise what works will be carried out for the site sheds, and whether an expected duration is available? Thanks!

    • 4 Sep 2026, 3:57 pm · D.B

      @B.R no impact, just site sheds on the footpath with pedestrian detour please. Just for Footpath teams view.

  6. Hi, Plans Folder: Plans-CC06008 Suite: S1 - Early Works (Stage 1)Save Work Here: TGS > Rev 14 Project Location: The Gallery, Racecourse RdQUOTE: NONE -Karein (0409)

    • 4 Sep 2026, 11:49 am · Riri D.

      Hi @D.B, could you please share the details with @B.R? She’ll be assigned to this amendment. 😊

    • 5 Sep 2026, 1:57 pm · B.R

      Hi @Christopher Wright, this is uploaded and for review. Thank you! Folder Link: S1 - Early Works (Stage 1) - Rev 14 Files: TGS - CC06008-S1-TGS-Rev14 - Stage 1 - The Gallery.pdf TMP - CC06008-S1-S2-CTMP-Rev14 - The Gallery.pdf Accounts: 1x TGS Add'l - CC06008-S1-21A/B - Stage 1: Site Shed Placement - 24/7 1xTMP Amendment

    • 15 Sep 2026, 12:14 pm · Christopher Wright

      This is GTG @D.B

  7. 2 Sep 2026, 11:09 am · Ripesh Mulmi · CC06008-S2 - Rev 7 - Graya - The Gallery, Racecourse RD

    @Accounts_Admin @Permits @Lexi R Accounts: 1x Additional TGS 1x TMP Amendment Thank you.

  8. IV0025122 as per QU5440 sent to client - Shaz 0209 1x 5tgs Invoice IV0025122 - Racecourse Rd - The Gallery.eml

  9. Quote QU5440.pdf RE_ Racecourse Rd - The Gallery.eml

  10. Hi Planner, Please action the below. 1x TGS amendment 1x TMP amendment Duplicate CC06008-S2-9B. List it as option 2 and the current one as option 1. with the option 2 move the full road closure onto Balowrie Street

  11. Hi Plans folder: Plans-CC06008 Suite: S2 - Construction (Stage 2) Save work here: TGS > Rev 07 Project location: The Gallery, Racecourse Rd Email Attached: Fw_ The Gallery _ Ballowrie Street Road Closure.eml Thank you! 🧡Kim

    • 31 Aug 2026, 8:00 pm · Ripesh Mulmi

      @Christopher Wright Hi Chris!. Below Attached Amendment Task for Review of CC06008-S2 - Rev 7 - Graya - The Gallery, Racecourse RD Link: https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts: 1x Additional TGS 1x TMP Amendment Thank you.

    • 1 Sep 2026, 9:03 am · Christopher Wright

      Hi @Ripesh Mulmi The use of the "Side Road closed" is being used incorrectly. Please replace the "Side Road Closed" (marked in red) with "Road Closed Ahead" with a directional arrow. The "Side Road Closed" (marked in Blue) can be replaced with "Road Work Ahead" this is because the motorists will not understand what road is closed due to the intersection layout. See below example of signage to use. See below the use of "Side Road Closed"

    • 1 Sep 2026, 1:59 pm · Ripesh Mulmi

      @Christopher Wright Hi Chris! Below amended as per above comments for CC06008-S2 - Rev 7 - Graya - The Gallery, Racecourse RD. Link: https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Thank you.

    • 2 Sep 2026, 7:46 am · Christopher Wright

      This is GTG @D.B

06Every file and folder

432 files in 86 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved