← All projectsCC06062 · CC06107
Project portal · built 17 Nov 2026, 10:03 am AEST · With client We supply traffic control

1134 Gold Coast, Palm Beach

CF Group

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for CF Group on this project at 1134 Gold Coast Hwy, Palm Beach, Queensland 4221, Australia, QLD. 2 Monday requests are open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 10; 2 TGS suites on file (S1 Rev 05, S2 Rev 07). On the permit boards: 1 permit in force and 2 in progress. Monday holds 15 requests for this job (2 new, 13 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
CF Group
Crompton job
CC06062 · CC06107
Location
1134 Gold Coast Hwy, Palm Beach, Queensland 4221, Australia, QLD
LGA / authority
City of Gold Coast
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
1 in force · 2 in progress
Last activity
12 Nov 2026
Files on SharePoint
423 in 146 folders

What needs attention now

  1. Issued, waiting on client: CC06107 - S2 - Changfa - 1134 Gold Coast Hwy, Palm Beach. Required by 20 Jul 2026.
  2. Complete, to be invoiced: CC06107-S2 - Rev 7 - Changfa - 1134 Gold Coast Hwy, Palm Beach. Required by 18 Oct 2026. · Last note (12 Nov 2026, Ethan Mathews): “@Permits / @Riri D. / @Lexi R ACCOUNTS: Please invoice as per below x14 TGS amendments x1 CTMP amendment to include revised workzone design, arborist doc, DTMR LONO as per council…”
  3. Permit in progress: CMP (CMP / LONO) is CMP App Pending. Follow up 9 Oct 2026.
  4. Permit in progress: TCP: Signage (TMR) is TMR Pending. Follow up 20 Nov 2026. Wanted from 1 Dec 2026.

PPermits

5 permit lines on the Monday permit boards: 1 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
TCP: Signage
Team Ethan · TMR Permits - Ethan
TMROngoingIn progress
TMR Pending
1 Dec 2026 – 28 Feb 20275 Nov 202620 Nov 202615 Jan 2027
CMP
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONOIn progress
CMP App Pending
4 Aug 20269 Oct 2026
CF Group – Operational
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
11 Nov 2026 – 28 Feb 202710 Nov 202615 Jan 2027
Low Impact Operational: Demolition Works
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingClosed
Cancelled
CF Group – TRC – Concrete Works
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificClosed
Cancelled

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 104 Nov 20267CC06107-CTMP-Rev10 - Main Works.pdf
—TMPRev 1029 Oct 20269CC06107-TMP-Rev10 - Main Works.pdf
—RARev 0822 Oct 20263Risk Assessment - Corallo.pdf
—TIAno rev22 Oct 2026026-094 1136 GC Hway, Palm Beach TIS (v01a) [BOUND].pdf
GeneralSwept pathno rev24 Jul 20260SEMI 16.5-Drive in Reverse Out Swept Path.pdf
GeneralWorkzone planno rev5 Aug 2026026-094.01[NTB] Rev.A 17-6-26 - Dare Palm Beach Ave Workzone.pdf
S1TGSRev 0522 Oct 20266CC06107-TGS-S1-Rev05 - Demolition Works.pdf
S2TGSRev 074 Nov 20261CC06107-TGS-S2-Rev07.pdf

03Requests on Monday

2 job numbers are treated as one project here (CC06062, CC06107): Monday requests name them together or they share a folder. 15 requests since 20 Nov 2025: 2 for new plans and 13 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06107-CTMP - Rev 8 - CF Group - 1134 Gold Coast Hwy, Palm Beach UrgentAmendmentRev 08Closed
No Charge
22 Oct 202624 Oct 2026
CC06107-S1 - Rev - CF Group - 1134 Gold Coast, Plam Beach UrgentAmendmentS1Closed
No Charge
21 Oct 202623 Oct 2026
CC06107-S2 - Rev 7 - Changfa - 1134 Gold Coast Hwy, Palm BeachAmendmentS2Rev 07To invoice
To Be Invoiced
16 Oct 202618 Oct 2026
CC06107-S1 - Rev 4 - CF Group - 1134 Gold Coast Hwy, Palm Beach UrgentAmendmentS1Rev 04Closed
No Charge
13 Oct 202615 Oct 2026
CC06107-S2 - Rev 6 - Changfa - 1134 Gold Coast Hwy, Palm BeachAmendmentS2Rev 06Closed
No Charge
24 Sep 202626 Sep 2026
CC06107 - Changfa - 1134 Gold Coast Hwy, Palm Beach - CTMP RFI UrgentCouncil RFIClosed
No Charge
4 Sep 20266 Sep 2026
CC06107-S2 - Rev 3 - CF Group - Changfa - 1134 Gold Coast, Palm BeachCouncil RFIS2Rev 03Closed
No Charge
17 Aug 202619 Aug 2026
CC06062-S2 - Rev 2 - CF Group - 1134 Gold Coast Hwy, Palm BeachCouncil RFIS2Rev 02Closed
No Charge
12 Aug 202614 Aug 2026
CC06107-S1 - TMP - Rev 3 - Changfa - 1134 Gold Coast Hwy, Palm BeachAmendmentS1Rev 03Invoiced
Invoiced
10 Aug 202612 Aug 2026
CC06107-S2 - Rev 1 - Changfa - 1134 Gold Coast Hwy, Palm BeachAmendmentS2Rev 01Closed
No Charge
22 Jul 202624 Jul 2026
CC06107-S1 - Rev 3 - Changfa - 1134 Gold Coast Hwy, Palm BeachAmendmentS1Rev 03Closed
No Charge
17 Jul 202619 Jul 2026
CC06107 - S2 - Changfa - 1134 Gold Coast Hwy, Palm BeachNew plansS2With client
Client review
16 Jul 202620 Jul 2026
CC06107-S1 - Rev 2 - Changfa - 1134 Gold Coast, Palm BeachCouncil RFIS1Rev 02Closed
No Charge
7 May 20269 May 2026
CC06107-S1 - Changfa - 1134 Gold Coast, Palm BeachAmendmentS1Closed
No Charge
16 Mar 202618 Mar 2026
CC06062 - CF Group - 1134 Gold Coast Hwy, Palm BeachNew plansClosed
Not Proceeding
20 Nov 20252 Jul 2025

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • ! invoices are for CF Group to pay. Please send these to in futuresam.gondal@cfgroup.net.au
  • !! Archived
  • CA Name - Email
  • CA Name - Phone Number
  • CA Email Address
  • CA Phone Number
  • PM Name - Email
  • PM Name - Phone Number
  • PM Email Address
  • PM Phone Number
  • Projc. Engr. Name - Email
  • Projc. Engr. Name - Phone Number
  • SM Name - Email
  • SM Name - Phone Number
  • SM Email Address
  • SM Phone Number
  • WHS Name - Email
  • WHS Name - Phone Number
  • WHS Email Address
  • WHS Phone Number
  • 'Christopher NEHME'chris@changfa.com
  • ACCOUNTS
  • Christopher Nehme0415 468 462
  • PM (CF Group) Sam Gondal0451 064 990
  • PM Iman Alimi-iman@changfa.com
  • Site Engr. Umer Farooq0420 834 471
  • ALL INVOICES TO ACCOUNTSaccounts@cfgroup.net.au

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @Riri D. / @Lexi R / @Permits - ACCOUNTS: This will be a no charge as per Ethan

  2. @Permits / @Riri D. / @Lexi R ACCOUNTS: Please invoice as per below x14 TGS amendments x1 CTMP amendment to include revised workzone design, arborist doc, DTMR LONO as per council RFI

  3. @Riri D. / @Lexi R / @Permits - ACCOUNTS: Marking this RFI Amendment as No Charge as per Ethan as all of this information provided from the client had been provided previously and was not incorporated into the CTMP initially...

  4. @Permits / @Lexi R / @Riri D. - ACCOUNTS: This will be a no charge as per Ethan

  5. 29 Oct 2026, 9:14 am · Ethan Mathews · CC06107-S1 - Rev - CF Group - 1134 Gold Coast, Plam Beach

    @Lexi R / @Permits / @Riri D. - ACCOUNTS: This will be a no charge as per Ethan

  6. @Permits / @Lexi R / @Riri D. - ACCOUNTS: Making this a no charge as per Ethan

  7. @Riri D. / @Lexi R / @Permits - No Charge as per Ethan

  8. Hi team, Kindly see instructions below as provided for by @Ethan: " I need this Arborist report added into our S2 CTMP as well as the snippit of this correspondence from the arborist added into the CTMP noting that the correct mitigation and maintenance strategies." Email here: Fw_ CRM - 1801227 - LONO Review 2_ 1134 Gold Coast Highway - Corallo (Palm Beach Avenue).eml Arborist report here: Arboricultural Impact Assessment & Tree Protection Plan 1134 Gold Coast Hwy Palm Beach.pdf Kindly save work here: CTMP > Rev 08 Main Folder Link: 1134 Gold Coast, Palm Beach Any questions, pls liaise with @Riri D. thanks thanks ~ clint

    • 22 Oct 2026, 2:11 pm · Rudra Khadka

      Hi @Ethan Mathews @Christopher Wright Task is completed and uploaded to its respective folder (i.e. Rev 08 ) Accounts, 1 x TMP ( Arborist report added into our S2 CTMP and noted the correct mitigation and maintenance strategies) Thank You!!

    • 28 Oct 2026, 1:23 pm · Christopher Wright

      This is GTG @Ethan Mathews

  9. 22 Oct 2026, 8:59 am · Leo Escoton · CC06107-S1 - Rev - CF Group - 1134 Gold Coast, Plam Beach

    Hi @Christopher Wright and @Riri D., for review. Accounts: TGS TMP Accounts 1x TGS = Amended TGS 1B to for Early Works (Hold & Release for general Deliveries) 1x TMP = Amended to reflect changes that were made on TGS 1x CTMP Thank you!

    • 22 Oct 2026, 12:50 pm · Christopher Wright

      This is GTG @Ethan Mathews

  10. Hi, Save Work Here: 3. Plans - CC06107 > S1 TGS > Rev 05 TMP > Rev 05 Folder Name: 1134 Gold Coast, Palm Beach Instructions: I need the below allocated as a major amendment to TGS 1B for CF Group 1134 Gold Coast highway job as per the below mark up: Essentially I need this TGS to be almost identical to TGS: CC06107-S2-4B except please DO NOT SHOW A WORKZONE AND DO NOT SHOW A WORK AREA - THIS TGS IS FOR HOLD AND RELEASE ONLY NOTE: This TGS is still for "Early Works Only and is only for general deliveries (Please update the title block to be for Early Works Hold & Release for general deliveries PLEASE ALSO SHOW ALL SIGNS INCLUDING THE NO U-TURN PERMITTED AND DETOUR AS MMS SIGNAGE Thanks, Iris (211026)

  11. @Ethan Mathews I have made some amendments. GTG

  12. @Ethan Mathews IS this even required now?

  13. Hi @B.R Plans folder: 3. Plans - CC06107 Suite: S2 Save work here: TGS and TMP > Rev 07 Project location: 1134 Gold Coast, Palm Beach Quote: N/A Request type: Amendment Scope: TGS Specific operations: e.g. verge closure, shoulder closure, shuttle flow, road closure, aftercare, etc. TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to? Please amend all TGS's and CTMP as per the attached new Workzone location along Palm Beach Ave which will now be 20m in length and 3.2m in width which Includes (Parking Lane / Shoulder and Bike Lane). Please make note in the CTMP that all larger deliveries that need to access the workzone will need to drive forward and reverse into the workzone to mitigate taking out additional parking to the left of the proposed work area (Refer attached swept paths). Please specifically note in the CTMP that this is strategically positioned to be 20m or further from the signalized intersection and enables the left hand turning lane to remain operational. We need to ensure that no reference to DTMR approval to be required is in the CTMP as we are taking them out of the equation now for the purpose of securing the LONO approval (GCCC). No new TGS's will be required to be made, simply just amending all of them that reference a workzone to be as per the newly proposed workzone attached and please overlay the AV swept path in the Large Deliveries TGS and then in the daily arrangement please overlay the HRV swept…

    • 18 Oct 2026, 11:13 pm · B.R

      Hi @A.A, This is uploaded and for review. Thank you! Folder Link: Rev 07 Files: TGS - CC06107-TGS-S2-Rev06.pdf TMP (awaiting amended technical memorandum from RPEQ as above) CC06107-TMP-Rev07 - Main Works.docx Accounts: 14xTGS - Workzone amendment and added truck path inserts - CC06107-S2-1B to 14B 1xTMP Amendment

  14. @Ethan Mathews tagging this as no charged since this has been sitting for awhile now and has not progress. As per YKath, Aaron will assist on this. But looking at the plans, were already at rev 5

  15. 1x Additional TGS CC06107-S1-5A/B/C 1x Additional TGS CC06107-S1-6A/B/C 1x TMP Amendment – Reflected new TGSs on the TMP For TMD Review TMP > Rev 04 TGS > Rev 04Sent also on Teams Chat

  16. Hi, Save Work Here: 3. Plans - CC06107 > S1 TGS > Rev 04 TMP > Rev 04 Folder Name: 1134 Gold Coast, Palm Beach Instructions: X2 TGS for Lane closure site active and inactive for these cement tankers with Pedestrian management on the footpath assisting with pedestrian access and showing a wheel chair ramp. Thanks, Iris (131026)

    • 20 Oct 2026, 8:03 am · K.R

      @Christopher Wright When you review this one for us could you please add the below information into the TMP. Thanks We will be parking up a 19m long cement tanker to transfer cement across to our silos and this will be the only plant parked in the closure. Each cement tanker takes approximately 1 hour to unload and we will have 2 tankers per day. We propose on using a wheelchair accessible pedestrian ramp along the footpath under which the transfer hose will run. This will not impact any foot traffic. The tankers will be parked on the Palm Beach Ave, when transferring cement and will drive straight out and onto Gold Coast Highway This closure will be required for a period of 2.5 weeks starting as soon as possible.

  17. Hi @J.R Please save work here: TGS / CTMP: Rev 06 Suite: S2 Instructions: please begin amending CTMP rev 5 as per the below and TGS Rev 4 will need the legends updated to say "20m Workzone" instead of the 23m workzone it currently states: * Appendix I is the Rev 04 Works Zone Plan, which still shows the 23 m legend. * Appendix F is the risk assessment dated July 2026. * Appendix J is the unsigned v01a TIS. * Appendix K has no LONO yet. Please also add in this contact from CF Group into the contacts list: Need to add in Sam Gondal from CF Group 0451 064 990 (Project Manager) sam.gondal@cfgroup.net.au Please also confirm if we have actually added any discussion in the CTMP about how powerlines are being managed, all I can see is that we have noted about powerlines on TGS 3B for their Gantry and Line Marking Removal TGS (See Below), however I cannot see an actual section in the CTMP discussing this, please confirm and add discussion if required: Thanks - Shaz

    • 24 Sep 2026, 3:32 pm · Riri D.

      @J.R this is the allocation Ethan mentioned in the chat. If you need any help with follow-ups or clarification, just let me know and I’m happy to assist you 😉

    • 24 Sep 2026, 4:13 pm · J.R

      Hi @Christopher Wright TGS and CTMP are now available for review: Please see change log (Section 1.4) in the TMP for the revision changes under 24/09/2026 date. Accounts: 8x TGS amendment (TGS 1, 4, 8, 10, 11, 12, 13 and 14 have been amended to update the legend to accurately reflect a 20 m works‑zone length.) 1x CTMP amendment

    • 29 Sep 2026, 9:56 am · Christopher Wright

      @J.R Please change the "Side Road Closed" to "Road Closed Ahead" A 40 needs to be implemented here (40 zone 100m min) Is there a reason why the Roadwork Ahead is so far back? it is also on the intersection corner; there is no sight distance for turning traffic.

    • 29 Sep 2026, 10:07 am · J.R

      Hi @Christopher Wright, I'm not the original/ initial planner for this allocation and was only tasked to do the amendments on the works zone length (from 23m to 20m) along site frontage that's why I cannot completely elaborate what was the reason behind the signs or your comments. But to my understanding, the signs with the red circles are long-term signages. Please confirm if the long-term signages are already installed at site @Ethan Mathews or if we can still change the panels/ move the locations? Thank you!

    • 29 Sep 2026, 5:10 pm · J.R

      Hi @K.R sorry but tagging you also on this since Ethan is on leave. Thank you!

    • 30 Sep 2026, 7:20 am · K.R

      @J.R Unfortunately I will need to refer you to Chelsea @C.C on this one. Chelsea met with the site team yesterday and this is a very sensitive project. I will drop her a teams message this morning to action your query.

    • 7 Oct 2026, 8:47 am · Christopher Wright

      This is GTG

  18. Hi @A.B, Please save work here: Rev 4 Project Folder: Main Works - Development Kindly see this doc for the RFIs (this is also in the Rev 4 link) CF Group LONO RFI Word Doc 1 1.docx Link to the latest CMP: Rev 3 thanks thanks ~ clint

    • 4 Sep 2026, 12:18 pm · Riri D.

      @A.B please let me know if we missed anything here so I can right away help you out :)

    • 4 Sep 2026, 1:03 pm · Riri D.

      @A.B TMP Project Information Request - 4th of Sept revised.docx CF Group LONO RFI Word Doc 2.docx

    • 7 Sep 2026, 8:00 am · A.B

      Hi @Chris, updated the plans and TMP with changes required from the documents RFI Word Doc 2 and TMP Project Information. Thank you! Sharepoint - Documents - Rev 04 - All Documents Accounts: - 10 TGS amendment (TGS 1,3-8,12-14 with added notes for driveway access maintained & TGS 3,5,7 for VMS locations) - 1 TMP amendment (refer to change log)

    • 16 Sep 2026, 7:19 am · Ethan Mathews

      Hi @Y.B please see TMD Comments Word Doc that Sanju put together, could you please review this and action accordingly: CC06107-CTMP-Rev04-Review-Comments.docx Please note that we are still awaiting the final RPEQ Design and documentation from Dare (Zekacorp), so once I have obtained that, I will send it through for you to continue your discussions in the TMP relating to the workzone. @S.B , @A.A or @C.C can help you with any questions you have for this one. Thank you!!

06Every file and folder

423 files in 146 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved