← All projectsCC06115
Project portal · built 17 Nov 2026, 10:03 am AEST · To invoice We supply traffic control

35 Merivale Street, South Brisbane - Marigold Apartments

Verso Construction

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Verso Construction on this project at 35 Merivale Street, South Brisbane, QLD. 2 Monday requests are open; the most pressing is at the to invoice stage; the current CTMP on SharePoint is Rev 09; 3 TGS suites on file (S1 Rev 05, S2 Rev 09, S7 no rev). On the permit boards: 1 permit in force and 5 in progress. Monday holds 20 requests for this job (1 new, 19 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Verso Construction
Crompton job
CC06115
Location
35 Merivale Street, South Brisbane, QLD
LGA / authority
—
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
1 in force · 5 in progress
Last activity
17 Nov 2026
Files on SharePoint
526 in 185 folders

What needs attention now

  1. Complete, to be invoiced: CC06115-S2 - Rev 5 - Verso Construction - 35 Merivale Street, South Brisbane. Required by 23 Sep 2026. · Last note (2 Nov 2026, Permits): “Draft - IV0025807”
  2. Complete, to be invoiced: CC06115-S2 - Rev 6 - Verso Construction - 35 Merivale Street, South Brisbane. Required by 16 Oct 2026. · Last note (2 Nov 2026, Permits): “1xTGS Add'l - CC06115-S2-7B - Level 3 Transfer Slab Pours 1xTGS Amend - CC06115-S2-5B - Reduced TC to 2 only 1xTMP Amendment INV IV0025807 - draft”
  3. Permit in progress: Footpath Closure (Footpath) is FEE PAID. Follow up 20 Nov 2026. Wanted from 20 Oct 2026.
  4. Permit in progress: Road: Early Concrete Pours (BCC road) is Initial Pending. Follow up 18 Nov 2026. Wanted from 19 Nov 2026.
  5. Permit in progress: Road Closure (BCC road) is Council Pending. Follow up 25 Nov 2026. Wanted from 30 Nov 2026.
  6. Permit in progress: Prelodgement Meeting (CMP / LONO) is CMP App Pending.
  7. Permit in progress: CMP Application (CMP / LONO) is Fee Quote/Notice to Pay Received / Sent.
  8. Extension due: OOH: Slab Pours (BCC road) expires 7 Dec 2026.

PPermits

6 permit lines on the Monday permit boards: 1 in force, 5 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Footpath Closure
Team Ethan · BCC Footpath Applications - Ethan
FootpathDate SpecificIn progress
FEE PAID
20 Oct 2026 – 30 Nov 202619 Oct 202620 Nov 2026
Road: Early Concrete Pours
Team Ethan · BCC Road Permits - Ethan
BCC roadDate SpecificIn progress
Initial Pending
19 Nov 2026 – 19 Dec 202616 Nov 202618 Nov 2026
Road Closure
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn progress
Council Pending
30 Nov 2026 – 31 Dec 202622 Oct 202625 Nov 202619 Nov 2026
Prelodgement Meeting
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
CMP App Pending
CMP Application
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement · matched by name
CMP / LONOIn progress
Fee Quote/Notice to Pay Received / Sent
OOH: Slab Pours
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn force
Done
2 Nov 2026 – 7 Dec 202616 Nov 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0914 Oct 20267CC06115-S1-CTMP-Rev09.pdf
—TMPRev 0914 Oct 20265Appendix G - Case Study - Pedestrian Management (CC06115).pdfAppendix I - RPEQ Design.pdfCC06115-S1-TMP-Rev09.pdf
—NMPRev 0213 Feb 20263Noise Management Plan - Out of Hours Work.pdf
—RARev 0914 Oct 20264CC06115-RA-R2.pdf
—Letter to residentsno rev28 Oct 20260Letter to Residents - 35 Merivale Street.pdf
S1TGSRev 054 Nov 20266CC06115-S1-TGS-Rev05.pdf
S2TGSRev 0914 Oct 20265CC06115-S2-TGS-R6.pdf
S7TGSno rev15 Jan 20260CC02638-S7-TGS 3.pdf

03Requests on Monday

20 requests since 15 Jan 2026: 1 for new plans and 19 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06115- NMP - Rev 1 - Verso Construction - 35 Merivale Street, South Brisbane (Slab Pours)AmendmentNMPRev 01Invoiced
Invoiced
27 Oct 202629 Oct 2026
CC06115-S2 - Rev 6 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 06To invoice
Invoice Scheduled
14 Oct 202616 Oct 2026
CC06115 - NMP - Slab Pours - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentNMPInvoiced
Invoiced
30 Sep 20262 Oct 2026
CC06115-S2 - Rev 5 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 05Closed
No Charge
24 Sep 202626 Sep 2026
CC06115-S2 - Rev 5 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 05To invoice
To Be Invoiced
21 Sep 202623 Sep 2026
CC06115-S2 - Rev 4 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 04Closed
No Charge
20 Aug 202622 Aug 2026
CC06115-S2 - Rev 3 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 03Invoiced
Invoiced
17 Jul 202619 Jul 2026
CC06115 - Verso Construction - 35 Merivale Street, South Brisbane (NMP - Tower Crane Installation)AmendmentInvoiced
Invoiced
6 Jul 20268 Jul 2026
CC06115-S2 - Rev 2 - Verso Construction - 35 Merivale Street, South BrisbaneCouncil RFIS2Rev 02Closed
No Charge
3 Jul 20265 Jul 2026
CC06115 - NMP - Rev 3 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentNMPRev 03Invoiced
Invoiced
30 Jun 20262 Jul 2026
CC06115-S1 - Rev 5 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS1Rev 05Invoiced
Invoiced
24 Jun 202626 Jun 2026
CC06115-S1 - Rev 4 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS1Rev 04Invoiced
Invoiced
19 Jun 202621 Jun 2026
CC06115-S1 - Rev 3 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS1Rev 03Invoiced
Invoiced
17 Jun 202619 Jun 2026
CC06115-S2 - Rev 1 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Rev 01Invoiced
Invoiced
20 May 202622 May 2026
CC06115-S1 - Rev 2 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS1Rev 02Invoiced
Invoiced
16 Mar 202618 Mar 2026
CC06115 - NMP - Rev 2 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentNMPRev 02Closed
No Charge
13 Feb 202615 Feb 2026
CC06115- TMP - Rev 1 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentTMPRev 01Invoiced
Invoiced
6 Feb 20268 Feb 2026
CC06115- NMP - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentNMPClosed
No Charge
29 Jan 202631 Jan 2026
CC06115-S2 - Verso Construction - 35 Merivale Street, South BrisbaneAmendmentS2Invoiced
Invoiced
27 Jan 202629 Jan 2026
CC06115 - Verso Construction - 35 Merivale Street, South BrisbaneNew plansInvoiced
Invoiced
15 Jan 202622 Jan 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • !! Archived
  • ACCOUNTSsebastian.curtis@versocon.com.au
  • Project Administrator - Jade Maher0439 015 990
  • PM - Dennis McGregor0424 674 497
  • SM - Benny Woods0400 172 761
  • SM Email Address
  • SM Phone Number

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 1xTGS Add'l - CC06115-S2-7B - Level 3 Transfer Slab Pours 1xTGS Amend - CC06115-S2-5B - Reduced TC to 2 only 1xTMP Amendment INV IV0025807 - draft

  2. Draft - IV0025807

  3. @Permits / @Lexi R / @Riri D. - ACCOUNTS: Please invoice as per below Accounts: 1xTGS Add'l - CC06115-S2-7B - Level 3 Transfer Slab Pours 1xTGS Amend - CC06115-S2-5B - Reduced TC to 2 only 1xTMP Amendment

  4. @Permits / @Riri D. / @Lexi R - ACCOUNTS: To be invoiced as per below x1 NMP Amendment ($455.00)

    • 4 Nov 2026, 2:08 pm · Riri D.

      IV0025845 sent client Re_ Merivale - Out of hours permits - Level 3 transfer slab pours (x2).eml

  5. Hi Plans folder: 3. Plans - CC06115 Suite: NMP Save work here: Slab Pours > Rev 01 Project location: 35 Merivale Street, South Brisbane - Marigold Apartments Quote: Request type: Amendment Scope: NMP Specific operations: NMP Amendment for Verso Constructions Concrete Pour works. Need the NMP to be amended to show new dates for Pour's 1 and 2 as per below: Pour 1: Start Date - Monday 2nd of November with x2 weeks contingency until the 16th of November Pour 2: Start Date - Monday 23rd of November with x2 weeks contingency until 7th of December Same start and finish times, just a change of dates required. Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 27 Oct 2026, 2:42 pm · J.G

      @Christopher Wright NMP updated to show new dates. See section 2.2 under Work Schedule. Thank you Link: Rev 01Account: 1x NMP Amendment

    • 28 Oct 2026, 12:40 pm · Christopher Wright

      This is GTG @Ethan Mathews

  6. IV0025622 invoice scheduled for 30 Oct - Shaz 1x nmp

  7. Accounts: 1x Add'l TGS - TGS 5 1x CTMP amendment 1x DRA amendment

  8. plans sent to client Re_ Merivale - Typical Pours.eml

  9. Hi @B.R this ones for you. Can you please get this allocated to a planner for x1 new TGS as per this and tmp amendment please: C0360-PAVEMENT-OVERALL-LAYOUT-Rev.F.pdf Prposed traffic set up.pdf RE_ Merivale - Out of hours permits - Level 3 transfer slab pours (x2).eml

    • 14 Oct 2026, 5:49 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! FIles: TGS - Rev 06 - CC06115-S1-CTMP-Rev09.pdf TMP - Rev 09 - CC06115-S1-CTMP-Rev09.pdf Accounts: 1xTGS Add'l - CC06115-S2-7B - Level 3 Transfer Slab Pours 1xTGS Amend - CC06115-S2-5B - Reduced TC to 2 only 1xTMP Amendment

  10. Hi @Christopher Wright, Kindly see instructions below: Kindly save work here: TGS > Rev 06 Main Folder Link: 35 Merivale Street, South Brisbane - Marigold Apartments Email from client: " Ethan, Separate to Ben’s email and Level 3 requirements, for all typical pours, I had discussed with Chelsea to remove the need for the third TC, as we will manoeuvre as per below. Please ensure all TGS require 2x TC only. We can always the third for breaks or very short term works, but having 3x TC on a pour day is not economical." Email attachment: RE_ Merivale - Typical Pours.eml Any questions, kindly liaise with @Riri D. and @Ethan Mathews thanks thanks ~ clint

    • 14 Oct 2026, 2:12 pm · B.R

      Hi @Christopher Wright, Should I also add this as an amendment or this is already completed on your end? Thank you!

    • 15 Oct 2026, 11:40 am · Christopher Wright

      This is GTG @Ethan Mathews

  11. @Lexi R / @Permits / @Riri D. ACCOUNTS - Please invoice as per below: x1 NMP

  12. @Permits @Riri D. @Lexi R - ACCOUNTS: No Charge as per Ethan

  13. NMP sent to client - Re_ Merivale - Out of hours permits - Level 3 transfer slab pours (x2).eml

  14. Hi @Y.B Plans folder: Plans - CC06115 Suite: NMP Save work here: NMP > Slab Pours Project location: 35 Merivale Street, South Brisbane - Marigold Apartments Quote: N/A Request type: New Scope: NMP Specific operations: Client mark-ups/attachments: N/A Merivale - Out of hours permits - Level 3 transfer slab pours (x2).eml

    • 30 Sep 2026, 12:30 pm · Y.B

      Hi @Christopher Wright, I've uploaded the NMP in Sharepoint for your review. Please let me know if any revisions are required. Thanks! 1x New NMP (Transfer Slab Pours) Sharepoint - Documents - Slab Pours - All Documents TGS Reference (CC06115-S2-5B) Sharepoint - Documents - Rev 05 - All Documents

    • 2 Oct 2026, 11:54 am · Christopher Wright

      This is GTG

  15. Hi @Ethan Mathews @Christopher Wright, I've amended the TGS following the instructions listed down here. I did notice that some TGS inserts (S2 in particular), are not displaying the amended TGS Rev05. I've traced back S4 changes and it included removing the duplicated signs to declutter the plans. This is also evident in S1 TGS inserts in the discussions in the TMP as it is still displaying Rev03 but the current S1 TGS is Rev05. I've kept it as is as this wasn't instructed to be changed. Accounts: 2xTGS Amendment 1xTMP Amendment Links: TGS > Rev 05 TMP > Rev08 It is now available for review. Thank you!

  16. Hi @KB.R , Kindly see instructions below as provided for by @Ethan Mathews : Client: Verso Constructions Project Address: 35 Merrivale St, Brisbane Amendment Details: TGS: CC06115-S2-1B - Please remove the note about the 24x7 Workzone for precast, formwork, REO etc TGS: CC06115-S2-5B - Please remove the note about the satellite pump installation - Please also remove the work area extract up the top right NOTE: These can be treated as internal amendments, no rev up required however please amend the CTMP to add in the new TGS's and update the change log accordingly please. Please see link to existing TGS and TMP below: Main Folder Link: 35 Merivale Street, South Brisbane - Marigold Apartments TGS > Rev 05 TMP > Rev08 Any questions, please liaise with @Riri D. . thanks thanks ~ clint

    • 24 Sep 2026, 3:55 pm · Riri D.

      @KB.R, as discussed you can start with this minor amendment after the Lylo NMP. Let me know if you need help with follow up or clarifications ☺️

    • 29 Sep 2026, 2:19 pm · Christopher Wright

      This is GTG

  17. Hi, Plans folder: Plans - CC06115 Suite: S2 Save work here: TGS/ TMP >Rev 05 Project location:35 Merivale Street, South Brisbane - Marigold Apartments 2 lane closure in the suite S2 for concrete pours. Trucks will drive down and reverso onto pump - similar to below but with the second lane closed. Please also update the CTMP -Karein (2109)

    • 22 Sep 2026, 10:13 am · J.R

      Hi @Christopher Wright, for review. Thank you! Change log: Added TGS (5A/B) to cover additional concrete pour set-up via lane closure. Uupdated Desktop Risk Assessment. Section 8.10, Appendix F Appendix G 21/09/2026 Accounts: 1x Add'l TGS - TGS 5 1x CTMP amendment 1x DRA amendment

    • 22 Sep 2026, 10:50 am · Christopher Wright

      This is GTG @C.C

  18. Chelsea team catch up 10-09-26.pdf Invoice 1x NMP Tower Crane Installation 1850$

    • 11 Sep 2026, 3:25 pm · Permits

      ✓IV0025249- Draft -Karein

  19. No charged Chelsea team catch up 10-09-26.pdf

  20. ✓ Invoice: IV0025098 ✓ Sent to client- Draft 🧡Kim 2x TGS Amendment $140 - CC06115-S2-3A/3B/3C/3D (Tower Crane Installation/Dismantle) - CC06115-S2-2A/B (Precast/Large Deliveries & Concrete Pours) 1x TMP Amendment $430 -CC06115-S2 - Rev 7

06Every file and folder

526 files in 185 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved