1. 1605 Brisbane Valley Highway, Fernvale QLD 4306
Gulf Civil
What's new
- 3 Nov 20261 file saved on SharePoint: CC06174-S1-TGS-Rev3.pdf
- 16 Sep 2026, 10:56 amD.B on CC06174-S1 - Rev 3 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306: Hi @Rudra Khadka, Please let me know when you are available, we'll do a meeting for this.
- 16 Sep 2026, 9:47 amPermits on CC06174-S1 - Rev 3 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306: Hi Team! Suite: S1 - Main Works Save work here: Rev 03 Project location: 1. 1605 Brisbane Valley Highway, Fernvale QLD 4306 Request type: Amendment Scope: TGS & TMP @D.B will add amendment instructions. thank you. - Shaz
- 11 Sep 2026, 2:15 pmD.B on CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306: Hi @Permits please send invoice IV0025245 to client please. Let me know once completed.
- 10 Sep 2026, 1:11 pmPermits on CC06174-S1 - Rev 2 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306: Hi, Kindly see instructions below: Save work here: Rev 02 Further instructions will be provided for by @D.B..
- 10 Sep 2026, 11:31 amKB.R on CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306: Hi @D.B @Christopher Wright, For CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306, I've amended the TGS and added two additional ones following the instructions set below. I've reflected all the footpath and parking closures…
Crompton Concepts prepares the traffic management for Gulf Civil on this project at 1605 BRISBANE VALLEY HWY, Fernvale, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 04; 3 TGS suites on file (S1 Rev 03, S2 Rev 00, S3 Rev 00). Monday holds 6 requests for this job (1 new, 5 amendments); all of them are on this page. Every file opens straight from SharePoint.
- Client
- Gulf Civil
- Crompton job
- CC06174
- Location
- 1605 BRISBANE VALLEY HWY, Fernvale, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- D.B
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 3 Nov 2026
- Files on SharePoint
- 260 in 45 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06174-Civil CTMP-Rev4.pdfCTMP Rev 04 · 8 Oct 2026
- PDFCN-25869 Drawings IFC.pdf13 Sep 2026
- PDFCN-25869 Drawings IFC.pdf10 Sep 2026
- PDFCN-25869 Drawings IFC.pdf10 Aug 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 04 | 8 Oct 2026 | 5 | CC06174-Civil CTMP-Rev4.pdf |
| — | TMP | Rev 04 | 8 Oct 2026 | 4 | CC06174-Civil TMP-Rev4.pdf |
| — | RA | Rev 01 | 13 Sep 2026 | 2 | CC06174-S1-RA-Rev1.pdf |
| — | TIA | Rev 00 | 13 Sep 2026 | 1 | CC06174-TIA-Rev0.pdf |
| S1 | TGS | Rev 03 | 3 Nov 2026 | 4 | CC06174-S1-TGS-Rev3.pdf |
| S2 | TGS | Rev 00 | 1 Sep 2026 | 1 | CC06174-S2-TGS-Rev0.pdf |
| S3 | TGS | Rev 00 | 9 Sep 2026 | 1 | CC06174-S3-TGS-Rev0.pdf |
03Requests on Monday
6 requests since 29 Jul 2026: 1 for new plans and 5 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06174-S1 - Rev 3 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306 | Amendment | S1 | Rev 03 | Closed No Charge | 16 Sep 2026 | 18 Sep 2026 | ||
| CC06174-S1 - Rev 2 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306 | Amendment | S1 | Rev 02 | Closed No Charge | 10 Sep 2026 | 12 Sep 2026 | ||
| CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306 | Amendment | S1 | Rev 01 | Invoiced Invoiced | 8 Sep 2026 | 10 Sep 2026 | ||
| CC06174 - S3 - Gulf Civil - Brisbane Valley Highway | Amendment | S3 | Closed No Charge | 7 Sep 2026 | 9 Sep 2026 | |||
| CC06174 - S1 - Rev 1 - Gulf Civil - Brisbane Valley Highway | Amendment | S1 | Rev 01 | Closed No Charge | 31 Aug 2026 | 2 Sep 2026 | ||
| CC06174 - S1 - Gulf Civil - Brisbane Valley Highway | New plans | S1 | Invoiced Invoiced | 29 Jul 2026 | 3 Aug 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- NeilProject coordinator (folder flag)
- D.BProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Sep 2026, 10:56 am · D.B · CC06174-S1 - Rev 3 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi @Rudra Khadka, Please let me know when you are available, we'll do a meeting for this.
- 18 Sep 2026, 9:15 am · Christopher Wright
Morning @Rudra Khadk, we need to add "Traffic Management Inspections" to the TMP please. Please make a new heading and add this.Traffic management inspection schedule.docx
- 18 Sep 2026, 9:15 am · Christopher Wright
- 16 Sep 2026, 9:47 am · Permits · CC06174-S1 - Rev 3 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi Team! Suite: S1 - Main Works Save work here: Rev 03 Project location: 1. 1605 Brisbane Valley Highway, Fernvale QLD 4306 Request type: Amendment Scope: TGS & TMP @D.B will add amendment instructions. thank you. - Shaz
- 18 Sep 2026, 4:26 pm · Rudra Khadka
Hi @D.B Work is amended and uploaded to its respective folder. Link:https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts, 2 x TGS 1 x TMP Thank You!
- 18 Sep 2026, 4:26 pm · Rudra Khadka
- 11 Sep 2026, 2:15 pm · D.B · CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi @Permits please send invoice IV0025245 to client please. Let me know once completed.
- 23 Sep 2026, 11:06 am · Permits
IV0025245 sent to client - Shaz 2309 1x 5tgs as per Dec Invoice IV0025245 from Crompton Concepts for.eml
- 23 Sep 2026, 11:06 am · Permits
- 10 Sep 2026, 1:11 pm · Permits · CC06174-S1 - Rev 2 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi, Kindly see instructions below: Save work here: Rev 02 Further instructions will be provided for by @D.B..
- 10 Sep 2026, 1:49 pm · D.B
Hi @Y.E can you please action the below amendments by TMR please gulf request.pdf
- 13 Sep 2026, 2:01 pm · Y.E
@D.B Updated files Rev 02, loaded for review.
- 15 Sep 2026, 10:58 am · Christopher Wright
This appears to be GTG
- 10 Sep 2026, 1:49 pm · D.B
- 10 Sep 2026, 11:31 am · KB.R · CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi @D.B @Christopher Wright, For CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306, I've amended the TGS and added two additional ones following the instructions set below. I've reflected all the footpath and parking closures in all TGS and had noted that in the TMP. I've also replaced the VMS plan with the advance warning sign locations in place 1km ahead of the work area. This has been noted in the TMP as well. Summary of the changes are all in the change log. I do want to note that some of the TGS here have ERW signs within the queue length but I've kept it as is as plans may have already been set up in the site and this has been approved before. I Accounts: 2xTGS Add'l 8xTGS Amendment 1xTMP Amendment 1xRA Amendment Link: Rev01 It is now available for QS review. Thank you!
- 8 Sep 2026, 1:14 pm · D.B · CC06174-S1 - Rev 1 - Gulf Civil - 1605 Brisbane Valley Highway, Fernvale QLD 4306
Hi @KB.R, Please see below: (S1 Only) TMP AMENDMENT + 2x NEW TGS's + TGS AMENDMENTS File Location: 4. Plans - CC06174 2x New TGS's (S1) (Active & Aftercare) (By using TGS's for "S2 - Service Location Works") they are closing the shoulders and digging at a depth of no more then 500mm next to the road, no shuttle flow, just keep the traffic driving, only shoulder closure with them working at a depth of 500mm during the day, and backfilling it at the end of the day next to the road, reason why they are doing this is because they are road widening the road. (keep the road at 40km/h after hours) Using S3, where you created the work area, they want to put road work ahead signs before they get to the worksite. Thats why they had the Vac truck TGS, as they will install road work ahead signs 1km away from the active site, please add this to S1. Now on S1, remove all VMS boards, make sure during work hours and after hours keep 40km/h
- 8 Sep 2026, 1:24 pm · D.B
Hi @KB.R, Please show on all TGS's the footpath closed passed this point and parking occupied like below TMR, Gulf, the school and the kindy have all worked hard to ensure we minimise interaction with the site work. Eliminating the need to pedestrians and vehicles to be within thew work area. We just need to clearly delineate “no parking” and “no pedestrian areas “ and include these in our TMP and TGS’s. For example we will include Safety mesh on the footpaths And flagging joining bollards in areas we don’t want people parking or pedestrians walking through (also double base)
- 8 Sep 2026, 1:24 pm · D.B
@KB.R please give me a call if needed
- 8 Sep 2026, 1:25 pm · D.B
This needs to be finished tomorrow or early Thursday please
- 8 Sep 2026, 1:24 pm · D.B
- 7 Sep 2026, 6:41 pm · KB.R · CC06174 - S3 - Gulf Civil - Brisbane Valley Highway
Hi @D.B @Christopher Wright, For CC06174 - S3 - Gulf Civil - Brisbane Valley Highway, I've configured the TGS following the discussion with Declan over in Teams. This set of TGS is for RWA sign installation as indicated in the email. Work sites indicated here are all 1km away from Forest Hill Fernvale Road & Brisbane Valley Highway Intersection, where main works are located. As mentioned by @D.B, this utilised old RA and Options Analysis to get this out quicker following urgency. Please be advised. Accounts: 3xTGS Link: TGS > Rev 00 It is now available for review. Thank you!
- 9 Sep 2026, 1:48 pm · Christopher Wright
This is GTG @D.B
- 9 Sep 2026, 1:48 pm · Christopher Wright
- 7 Sep 2026, 12:31 pm · Permits · CC06174 - S3 - Gulf Civil - Brisbane Valley Highway
Hi Plans folder: Plans - CC06174 Suite: S3 Save work here: TGS > Rev 00 Project location: 1. 1605 Brisbane Valley Highway, Fernvale QLD 4306 Quote: none Email Attached: Fw_ Site Scoping_Site Assessment Document 03_09_2026 .eml Thank you! 🧡Kim
- 7 Sep 2026, 12:35 pm · Riri D.
@KB.R @D.B will add more details to this allocation. If you need any assistance, please mention us here and we’ll be happy to help. 😊
- 7 Sep 2026, 2:00 pm · KB.R
Tagging this as working on it following discussion with @D.B over Teams meeting earlier. Thanks @Riri D.
- 9 Sep 2026, 11:26 am · Christopher Wright
Hi @KB.R when deciding on signage please be consistent by keeping the signage the same. Any 1200x900 roadwork ahead needs to be amended to the multi message frames. The workman signs can be removed as there are workman signs closer to the workers. Fielding road is a 100km/h road not 80, we cant have a roadwork ahead and a workman sign opposite each other, please remove the workman and keep the roadwork ahead with directional arrow. A repeater 60 can go where the blue circle is. The signs in Old Fernvale Road can be removed once the road work ahead in Vogler Road is moved closer to the intersection. The road speed for stage 2 is 60km/h, please amend. Wivenhoe Pocket road has a road speed of 100km/h not 80.
- 9 Sep 2026, 11:57 am · KB.R
Hi @Christopher Wright, apologies for the oversight on RWA/WM sign combination. it was RWA/60. I'll amend accordingly. Following this, though dated 2024, this location is quite confusing as there are 80kph signs and 50kph signs established in this area. Old Fernvale Road is signed as 80kph while Vogler Road, which is just a few meters away is signed as 50kph. For traffic exiting Vogler Road, it is signed as 80kph in which when continuing straight, I've assumed that it's also 80kph at Fielding Road. Would that be a wrong assumption? Also for Stage 2, the location where the works are is signed as 50kph Hence, I've designed the TGS to have the other bound traffic following 50kph and the other bound as 60kph. I've encircled here the location of the speed signs in the screenshot and where it is reflected in the plan.
- 9 Sep 2026, 1:38 pm · KB.R
Hi @Christopher Wright, I've uploaded the amended TGS following the discussion in Teams. Appreciate also the additional points you've raised I can use for reference for future TGSs. Thanks heaps!
- 7 Sep 2026, 12:35 pm · Riri D.
- 31 Aug 2026, 4:17 pm · C.R · CC06174 - S1 - Rev 1 - Gulf Civil - Brisbane Valley Highway
Hi @D.B /@A.A , This is now for urgent review. Please note that I made this into a short-term standalone plan (S2) instead of utilizing S1 and amending the revision count. I also matched the planning style of S1 to S2, using the apps in Crompton Labs. I also utilised the VMS on site as stated in S1. You can let me know if this is an overkill and I'll happily amend the plans. Thanks. Accounts: 1xTGS Link: Sharepoint - Rev 00 - All Documents Another thing to note, client mentioned that the works is for tomorrow.
- 31 Aug 2026, 2:27 pm · D.B · CC06174 - S1 - Rev 1 - Gulf Civil - Brisbane Valley Highway
1x TGS. Shoulder Closure Active For: 1605 Brisbane Valley Highway, Fernvale QLD 4306
- 31 Aug 2026, 2:03 pm · Permits · CC06174 - S1 - Rev 1 - Gulf Civil - Brisbane Valley Highway
Hi Plans folder: Plans - CC06174 Suite: S1 Save work here: TGS > Rev 01 Project location: 1. 1605 Brisbane Valley Highway, Fernvale QLD 4306 Email Attached: Fw_ Brisbane Valley Highway - CN-25869 - Council Approval Clarification .eml Mark Up: Area of Works.pdf Thank you! 🧡Kim
- 31 Aug 2026, 2:04 pm · Permits
URGENT – GULF CIVIL 1 Address: 1605 Brisbane Valley Highway, Fernvale QLD 4306 * Planner to action ASAP * 1 x TGS – Shoulder Closure * TGS only – No TMP required * Due: This afternoon / EOD today 🧡Kim
- 31 Aug 2026, 2:04 pm · Permits
06Every file and folder
260 files in 45 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|