Crompton Concepts prepares the traffic management for Graya on this project at 18 Sandford Street, St Lucia, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 04; 3 TGS suites on file (General Rev 00, S1 Rev 01, S2 Rev 04). On the permit boards: 0 permits in force and 2 in progress. Monday holds 5 requests for this job (0 new, 5 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Graya
Crompton job
CC06179
Location
18 Sandford Street, St Lucia, QLD
LGA / authority
—
Project coordinator
Melanie O'Brien
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP, Police Permit
Permits (Monday)
0 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
198 in 73 folders

What needs attention now

  1. Permit in progress: Road (BCC road) is Council Pending. Follow up 27 Nov 2026. Wanted from 30 Nov 2026.
  2. Permit in progress: Footpath (Footpath) is Received/Holding. Follow up 18 Nov 2026. Wanted from 2 Nov 2026.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Road
Team Declan · BCC Road Permits - Declan
BCC roadOngoingIn progress
Council Pending
30 Nov 2026 – 30 Dec 202628 Oct 202627 Nov 202627 Nov 2026
Footpath
Team Declan · BCC Footpath Applications - Declan
FootpathOngoingIn progress
Received/Holding
2 Nov 2026 – 7 Feb 202730 Oct 202618 Nov 20267 Dec 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

5 requests since 6 Mar 2026: 0 for new plans and 5 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06179-S2 - Rev 4 - Graya - 18 Sandford St, St Lucia UrgentAmendmentS2Rev 04Invoiced
Invoiced
22 Sep 202624 Sep 2026
CC06179-S2 - Rev 3 - Graya - 18 Sandford St, St LuciaAmendmentS2Rev 03Closed
No Charge
7 Sep 20269 Sep 2026
CC06179-S1 - Rev 2 - Graya - 18 Sandford St, St LuciaAmendmentS1Rev 02Closed
No Charge
3 Sep 20265 Sep 2026
CC06179 - S2 - Rev 0 - Graya - 18 Sandford St, St LuciaAmendmentS2Rev 00Invoiced
Invoiced
26 Mar 202628 Mar 2026
CC06179 - S1 - Rev 1 - Graya - 18 Sandford St, St LuciaAmendmentS1Rev 01Not proceeding
Not proceeding
6 Mar 20268 Mar 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • ACCTSadmin@grayaconstruction.com.au
  • Archive and Updates!!
  • PM Dom Castor0408 067 364 · domc@graya.com.au
  • SM Dan Munro0406 428 988 · danm@graya.com.au
  • WHS Lyle Anderson0401 810 601 · lylea@graya.com.au
  • Damian Murraydamianm@graya.com.au
  • ECI Manager - Matt Hicks0412079149 · matth@graya.com.au
  • Rowan Krytenbergrowan@graya.com.au
  • SM Rowan Krytenbergrowan@graya.com.au

Crompton Concepts

  • Melanie O'BrienProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 13 Oct 2026, 11:15 am · Permits · CC06179-S2 - Rev 4 - Graya - 18 Sandford St, St Lucia

    IV0025540 Dec sent to client - Shaz 1310 1x tmpa 1x 5tgs Crompton Concepts Invoice IV0025540 - SILK Sandford Street St Lucia.eml

  2. Hi Team! Please save work here: TGS > Rev 04 TMP > Rev 4 Plans folder: Plans - CC06179 Client Request: Good morning Declan, Graya are looking to install 4 x sheds from Royal wolf this Friday. Please find attached mark up from BSF cranes for what traffic management they require. Are you able to do a TMP in relation to this? In the attached drawing there will be enough room to fit cars up through out existing work zone with stop and go traffic controllers each end. We are expecting this to take around 4 hours for install. Model Draft shed lifting jm.pdf Fw_ SILK Sandford Street St Lucia.eml Thanks - Shaz

    • 22 Sep 2026, 3:42 pm · D.B

      Hi @R.R, when you are about to start can you please give me a teams call

    • 22 Sep 2026, 7:04 pm · R.R

      Hi @Christopher Wright @D.B , TGS 5 added for Site Shed Installation and TMP amended. Thank you. TGS: Sharepoint - Rev 04 - All Documents TMP: Sharepoint - Documents - Rev 4 - All Documents Accounts: 1x TGS add'l TMP amendment

    • 23 Sep 2026, 11:34 am · Christopher Wright

      This is GTG @D.B

  3. no charge

  4. Plans sent to client - Dec 0909 RE_ Traffic Control Requirements - Sandford Street St Lucia.eml

  5. Hi @B.R Plans folder: Plans - CC06179 Suite: S2 - Construction Save work here: TGS > Rev 03 Project location: 18 Sandford St - Silk Quote: none Request type: Amendment Scope: TGS Specific operations: Can you please get the following changes done CC06179-S2-1B - Remove signs from centre median, it is not wide enough for perm signage CC06179-S2-2B - Workman sign on Sandford still present and needs to be shown as covered TGS to amend: CC06179-S2-1B & CC06179-S2-2B Client mark-ups/attachments: Fw_ Traffic Control Requirements - Sandford Street St Lucia 1.eml

    • 7 Sep 2026, 4:51 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: Plans - CC06179 Files: TGS - CC06179-S2-TGS-Rev03 - 18 Sandford St, St. Lucia (Construction).pdf TMP - CC06179-CTMP-Rev04 - 18 Sandford St, St. Lucia.pdf Accounts: 2xTGS Amendment - CC06179-S2-1A/1B - Construction Works: Pours, Deliveries, Earthworks, Civil Works (Site Active) - CC06179-S2-2A/2B - Construction Works: Pours, Deliveries, Earthworks, Civil Works (Site Inactive) 1xTMP Amendment

    • 9 Sep 2026, 1:37 pm · Christopher Wright

      This is GTG @D.B

  6. Hi @D.B @Christopher Wright, I've amended the TGS and TMP following the instructions provided by Declan. I've disregarded the instructions written by Permits, as advised. For site inactive, I did match the footpath closure on site active hours. I assumed this was the case following the instruction below and client has already gotten approval for blocking off access in the adjacent property. Summary of changes are in the change logs. Just to note, to prevent any confusion, could you please double check the suite number I am amending here @Permits. Declan specifically wrote in the email and in his update S2 but in the Monday line it is written as S1. Accounts 1xTGS 2xTGS Amendment 1xTMP Amendment 1xRA Amendment Link: TGS: R2 TMP: Rev 3It is now available for review. Thank you.

    • 4 Sep 2026, 1:24 pm · Christopher Wright

      Hi @KB.R When designing a TGS we need to ensure the TGS makes scene to the road users. See below, the side road closed are being used incorrectly, Road Closed Ahead should be used on Brisbane road along with Roadwork Ahead, for Herbert Street the Roadwork Ahead would be best here, using Side Road Closed with no indication where it is will confuse motorists. Same comment for the other end of site. See screen shot of my amendments. Can you please update the TMP figures where required due to the changes I have made. Original Amended

    • 4 Sep 2026, 1:27 pm · KB.R

      Got it, Chris. I've actually kept the MMS combinations as to how it was designed before as this was previously approved. I'll keep this in mind when amending future allocations. Thanks!

    • 4 Sep 2026, 1:52 pm · KB.R

      Hi @D.B @Christopher Wright, I've uploaded the amended TMP. I did amend the TGS as well as I've changed two signages here to make everything consistent. I've also updated the duplicated signage counts in the manifest following the changes. Previous Amended It is now available for review. Thank you!

  7. Hi @KB.R please see below: Do not action the below comment from Permits. Plans - CC06179 - Plans Location - S2 - Construction TGS amendment Location - TMP TMP amendment Location TGS 1B: extend work area TGS 2B (NEW TGS) will be the after hours for it (move all other TGS's to a lower number) Copy TGS 1B and use the duplicated version as 2B as this will be their signage setup for the duration of the project and change the below Footpath to be kept by Graya, parking lane to be given to pedestrians. all active signs to be covered.

  8. Hi Plans folder: Plans - CC06179 Suite: S2 - Construction Save work here: TGS > Rev 2 TMP > Rev 3 Project location: 18 Sandford St (Graya Multi-Res Quote: none Request type: Amendment Scope: TGS & TMP Specific operations: Declan to confirm and/or add additional details As discussed: * We'll update TGS CC06179-S2-1B to have a longer work area. * For after-hours, we'll have pedestrians use the parking lane like below. TGS to amend: Client mark-ups/attachments: Fw_ Traffic Control Requirements - Sandford Street St Lucia.eml 🧡Kim

    • 3 Sep 2026, 11:03 am · Riri D.

      @KB.R Declan will add addtl details to this one

06Every file and folder

198 files in 73 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved