← All projectsCC06181
Project portal · built 17 Nov 2026, 10:03 am AEST · With client

175 Melbourne St, South Bne

Stockwell

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Stockwell on this project at 175 Melbourne Street, South Brisbane, QLD. 2 Monday requests are open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 06; 6 TGS suites on file (S0 no rev, S1 Rev 04, S2 Rev 01, S3 Rev 02…). On the permit boards: 0 permits in force and 2 in progress. Monday holds 15 requests for this job (4 new, 11 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Stockwell
Crompton job
CC06181
Location
175 Melbourne Street, South Brisbane, QLD
LGA / authority
—
Project coordinator
Caitlin H
Latest planner · TMD
Leo Escoton · Christopher Wright
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
0 in force · 2 in progress
Last activity
17 Nov 2026
Files on SharePoint
471 in 157 folders

What needs attention now

  1. Urgent Issued, waiting on client: CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works). Required by 13 Nov 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (11 Nov 2026, S.B): “Posted by Leo Escoton (leo@cromptonconcepts.com.au) · @Leo Escoton via Work Flow RapidPlan screenshot skipped: No plan file for this task”
  2. Complete, to be invoiced: CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane. Required by 4 Nov 2026. · Last note (12 Nov 2026, Ethan Mathews): “@Permits / @Lexi R / @Riri D. - ACCOUNTS: Please see invoicing notes below x1 CTMP amendment to add Dare's engineering doc into the CTMP.”
  3. Permit in progress: Road: Trenching & Energex Works (BCC road) is QPS Pending. Follow up 17 Nov 2026. Wanted from 17 Nov 2026.
  4. Permit in progress: Road: Early Works (BCC road) is Council Pending. Follow up 19 Nov 2026. Wanted from 10 Dec 2026.

PPermits

3 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Road: Trenching & Energex Works
Team Ethan · BCC Road Permits - Ethan
BCC roadDate SpecificIn progress
QPS Pending
17 Nov 2026 – 17 Dec 202619 Oct 202617 Nov 2026
Road: Early Works
Team Ethan · BCC Road Permits - Ethan
BCC roadOngoingIn progress
Council Pending
10 Dec 2026 – 10 Jan 20273 Nov 202619 Nov 202619 Nov 2026
Footpath: Trenching & Energex Works
Team Ethan · BCC Footpath Applications - Ethan
FootpathDate SpecificApproved, starts later
Permit to Invoice
1 Dec 2026 – 31 Dec 202616 Nov 202625 Nov 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 067 Sep 20267CC06181-CTMP-S4-Rev6-175 Melbourne Street.pdf
—TMPRev 069 Nov 20267260827 HV - Site Hoarding.pdfCC06181-TMP-S4-Rev6-175 Melbourne Street.pdf
—NMPno rev11 Nov 20260CC06181-NMP-Energex Works.pdf
—RARev 043 Jun 20265CC06181-RA.pdf
—TIARev 0320 May 20264TIA REPORT.pdf
S0TGSno rev26 Feb 20260CC06181-TGS-S0-R0-Concept Plan.pdf
S1TGSRev 043 Jun 20265CC06181-TGS-S1-R4.pdf
S2TGSRev 013 Jul 20262CC06181-TGS-S2-R1 - Stockwell-175 Melbourne Street, South Brisbane.pdf
S3TGSRev 026 Nov 20263CC06181-TGS-S3-R2.pdf
S3Workzone planRev 007 Aug 20261Work zone Plan.pdf
S4TGSRev 069 Nov 20267CC06181-TGS-S4-Rev6-175 Melbourne Street.pdf
S5TGSRev 0021 Oct 20261CC06181-TGS-S5-Rev00-175 Melbourne Street.pdf

03Requests on Monday

15 requests since 25 Feb 2026: 4 for new plans and 11 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works) UrgentAmendmentNMPWith client
Client review
11 Nov 202613 Nov 2026Leo EscotonChristopher Wright
CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS3Rev 01To invoice
To Be Invoiced
2 Nov 20264 Nov 2026
CC06181 - S5 - Stockwell - 175 Melbourne Street, South BrisbaneNew plansS5Closed
No Charge
14 Oct 202616 Oct 2026
CC06181-S4 - Rev 5 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS4Rev 05Invoiced
Invoiced
3 Sep 20265 Sep 2026
CC06181-S4 - Rev 4 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS4Rev 04Invoiced
Invoiced
28 Aug 202630 Aug 2026
CC06181-S4 - Rev 2 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS4Rev 02Invoiced
Invoiced
24 Aug 202626 Aug 2026
CC06181-S4 - Rev 1 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS4Rev 01Invoiced
Invoiced
11 Aug 202613 Aug 2026
CC06181 - S4 - Stockwell - 175 Melbourne Street, South BrisbaneNew plansS4Invoiced
Invoiced
28 Jul 202630 Jul 2026
CC06181-S3 - Stockwell - 175 Melbourne Street, South BrisbaneNew plansS3Closed
No Charge
27 Jul 20263 Aug 2026
CC06181-S2 - Rev 1 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS2Rev 01Invoiced
Invoiced
17 Jun 202619 Jun 2026
CC06181-S1 - Rev 3 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS1Rev 03Invoiced
Invoiced
19 May 202621 May 2026
CC06181-S2 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS2Invoiced
Invoiced
27 Apr 202629 Apr 2026
CC06181-S1 - Rev 2 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS1Rev 02Invoiced
Invoiced
16 Apr 202618 Apr 2026
CC06181-S1 - Stockwell - 175 Melbourne Street, South BrisbaneAmendmentS1Invoiced
Invoiced
9 Mar 202611 Mar 2026
CC06181 - S0 - Stockwell - 175 Melbourne Street, South BrisbaneNew plansS0Closed
No charge
25 Feb 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Leo EscotonPlanner
  • Christopher WrightTMD
  • Caitlin HProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @Permits / @Lexi R / @Riri D. - ACCOUNTS: Please see invoicing notes below x1 CTMP amendment to add Dare's engineering doc into the CTMP.

  2. Posted by Leo Escoton (leo@cromptonconcepts.com.au) · @Leo Escoton via Work Flow RapidPlan screenshot skipped: No plan file for this task

  3. Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - NMP - Energex Works - All Documents Accounts: 1x NMP - The proposed work sequence and schedules have been included, with the specific dates and times subject to your review and confirmation with the client. Thank you!

    • 11 Nov 2026, 8:06 pm · Riri D.

      NMP - Energex Works

  4. Please prepare a Noise Management Plan as per the attached correspondence from Stockwell. Can we please also have the attached civil design included in the NMP. These works are for existing infrastructure upgrades for Energex Works on behalf of the development at 175 Melbourne St and will likely take somewhere between 2-4 weeks to complete and will need to be completed between 6:30pm and 6:30am (Night Works). Please also reference the Energex work order attached also. The TGS's attached will be used to complete these works and will be done as night works (See attached) Please have the NMP created and saved here below: Main Folder Link: 175 Melbourne St, South Bne NMP: NMP - Energex Works Docs: WR8384431 Relocation Contract.pdf Out of Hours Energex Works Correspondence.pdf CC06181-TGS-S1-R4.pdf CC06181-TGS-S4-Rev6-175 Melbourne Street.pdf D10286-EXT-CIV-PLN-STG1 (Rev H) egx signed.pdf

    • 12 Nov 2026, 12:44 pm · Christopher Wright

      This appears to be GTG

    • 12 Nov 2026, 3:45 pm · Ethan Mathews

      @Christopher Wright Thank you mate, this has now been sent to the client - @Riri D. FYI, changing this to "Client Review"

  5. Please see attached TGS and CTMP amendment request form Please have the amendments completed as per this doc and saved here below: Main folder link: 175 Melbourne St, South Bne TGS / TMP: Rev 01

    • 2 Nov 2026, 5:18 pm · J.R

      Hi @Christopher Wright for review. Thank you! "Please amend each TGS to eliminate any works along Melbourne St, however still keeping the pedestrian detour the same for now. All construction activities to remain on Edmonstone St Only" Change log: Amendment Section Date Amended TGS 2, 3 and 5 to remove work area along Melbourne St. Pedestrian detour maintained. Revised workzone plan to remove workzone along Melbourne St. Deleted TGS 3 – Concrete Pour (Melbourne St frontage). Updated Desktop Risk Assessment. 7.1, 7.2, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G 02/11/2026 Accounts: 3x TGS amendments - TGS 2, 3 and 5 1x CTMP amendment 1x Workzone Plan amendment 1x DRA amendment

    • 3 Nov 2026, 12:14 pm · Christopher Wright

      Hi @J.R there is a workman 40 missing from this direction on all TGS's

    • 3 Nov 2026, 12:16 pm · J.R

      Hi @Christopher Wright it's 40 km/hr road (existing road speed).

    • 3 Nov 2026, 12:20 pm · Christopher Wright

      What if traffic turn left onto the 50 km/h road? you also have a WM40 on the other approach with a road speed of 40

    • 3 Nov 2026, 12:22 pm · J.R

      @Christopher Wright alright, will work on this next after my current allocation. Thanks!

    • 3 Nov 2026, 2:09 pm · J.R

      Hi @Christopher Wright TGS and CTMP are now updated. Thanks! Updated TMP change log: Amendment Section Date Amended TGS 2, 3 and 5 to remove work area along Melbourne St. Pedestrian detour maintained. Deleted TGS 4 - Melbourne St Concrete Pour. All remaining TGS have been updated to reflect a 40 km/h speed reduction on the westbound section of Melbourne Street approaching the site from the eastbound approach. Revised workzone plan to remove workzone along Melbourne St. Updated Desktop Risk Assessment. 7.1, 7.2, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G 02/11/2026 Updated Accounts: 4x TGS amendments - TGS 1, 2, 3 and 5 1x CTMP amendment 1x Workzone Plan amendment 1x DRA amendment

    • 3 Nov 2026, 2:42 pm · Ethan Mathews

      @J.R Hi Jenesis, apologies I gave you the incorrect advice... I have just re-confirmed with the client that they would actually still like to see a footpath closure for their daily arrangement and concrete pours where they use Melbourne St As per below: Please amend as per the above for TGS's 2C and 5C Please also amend to add in the attached RPEQ Doc in response to Councils RFI and add in a section in the CTMP with discussion about the findings of the RPEQ Documents. 26-073 175 Melbourne St IR Response (Transprot) v01a.pdfThank you!

    • 4 Nov 2026, 1:15 pm · J.R

      Hi @Christopher Wright for review. Thanks! Updated change/ rev log: Amendment Section Date Amended TGS 2 and 5 to contain the work area at Melbourne Street site frontage within footpath, while maintaining the pedestrian detour. Revised TGS 3 to remove work area along Melbourne St during site inactive. Deleted TGS 4 - Melbourne St Concrete Pour. All remaining TGS have been updated to reflect a 40 km/h speed reduction on the westbound section of Melbourne Street approaching the site from the eastbound approach. Revised workzone plan to remove workzone along Melbourne St. Updated Desktop Risk Assessment. Additional section 7.2.1 for pedestrian detour assessment summary (RPEQ). 7.1, 7.2, 7.2.1, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G, Appendix H 02/11/2026 Updated accounts: 3x TGS amendment (TGS 2, 3 and 5) 1x CTMP amendment 1x Workzone amendment 1x DRA amendment

    • 5 Nov 2026, 11:44 am · Christopher Wright

      This is GTG

  6. Plans sent to Mark 175 Melbourne Street, South Brisbane .eml

  7. Plans folder: 4. Plans - CC06181 Suite: S5 - Early Works Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 175 Melbourne St, South Bne Quote: none Request type: new suite Specific operations: 1st TGS - scaffold is dark orange around the project peritmer , blue is crossover, red is hoarding installed on project boundary. trucks to reverse in under traffic control hold and release of footpath and road. green is the traffic controllers, yellow are the portabooms 2nd TGS - RIG DELIVERY, lane closure with hold and release of footpath 1x Mini TMP only Client mark-ups/attachments: request by Mark via teams

  8. Hi, Save Work Here: 4. Plans - CC06181 > S5 - Early Works TGS > Rev 00 TMP > Rev 00 Folder Name: 175 Melbourne St, South Bne Thanks, Iris (141026)

    • 14 Oct 2026, 8:05 pm · Rudra Khadka

      Hi, @Ethan Mathews @S.B Work is completed and uploaded to its respective folder. Please let me know if this requires any further adjustments/changes. Accounts, 2 x New TGS (CC06181-1B/C & CC06181-2B) 1 x New TMP (Minor) Thank You!

    • 15 Oct 2026, 10:39 am · S.B

      @Rudra Khadka Please use new risk assessment and options analysis format for new projects.

  9. Invoice IV0025174 - (04 Sep) Clint --> to be sent on the 25th 1x Add'l TGS (TGS 4) 1x CTMP amendment IV sent to client - Lex 3009

  10. Invoice IV0025174 - (04 Sep) Clint --> to be sent on the 25th 1x TGS amendment (TGS 2) 1x CTMP amendment IV sent to client - Lex 3009

  11. @Permits @Lexi R @Riri D. - To Be Invoiced: Accounts: 1x Add'l TGS (TGS 4) 1x CTMP amendment This can go under PO: 07E01021

  12. @Permits @Lexi R @Riri D. - To Be Invoiced as per below: Accounts: 1x TGS amendment (TGS 2) 1x CTMP amendment Please use PO: 07E01021

  13. Hi, please save work here. Project Location Folder: 175 Melbourne St, South Bne Suite: S4 TGS > Rev 05 TMP > Rev 05 Client: Stockwell Constructions Project: 175 Melbourne St S4 (Energex / Trench Works) to be amended and rev'd up to rev 05 and an additional new TGS to be created for a full footpath closure essentially the same as TGS: CC06181-S4-1B, however without the parking lane closure as per below: Please have this as a footpath closure ONLY and keep both TC's and just adjust this TC to be slightly closer to the intersection as per here: These works will be essentially an option B for their night works incase we don't get council approval in time for the parking lane closure. -Karein (0309)

    • 3 Sep 2026, 5:22 pm · J.R

      Hi @Christopher Wright for review, thank you! Rev log: Added TGS 4 for Option 2 trench works, restricting the work zone and closure to the verge/footpath. Section 2.2, Figure 3, Appendix A, Appendix B 03/09/2026 Accounts: 1x Add'l TGS (TGS 4) 1x CTMP amendment (mini)

    • 4 Sep 2026, 1:27 pm · Christopher Wright

      This is GTG @Ethan Mathews

  14. IV0025123 SEND ON 25TH - Shaz 1x tgsa 1x tmpa Iv sent to client - Lex 3009

06Every file and folder

471 files in 157 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved