175 Melbourne St, South Bne
Stockwell
What's new
- 17 Nov 20263 files saved on SharePoint: Quote QU5847 - Project Plans & Permits Estimate.pdf, Melbourne St Footpath Occupancy.png, Edmonstone Footpath Occupancy.png
- 16 Nov 20266 files saved on SharePoint: A007147275 - 175 MELBOURNE ST SOUTH BRISBANE QLD 4101 - Footway Permit (id-7334953).eml, Permit 2520520.pdf, C - QPS App NovDec26.pdf, QPS App NovDec26.pdf and 2 more
- 12 Nov 20261 file saved on SharePoint: Stockwell - 175 Melbourne St, South Bne.xlsx
- 12 Nov 2026, 5:29 pmEthan Mathews on CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane: @Permits / @Lexi R / @Riri D. - ACCOUNTS: Please see invoicing notes below x1 CTMP amendment to add Dare's engineering doc into the CTMP.
- 11 Nov 2026, 9:05 pmS.B on CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works): Posted by Leo Escoton (leo@cromptonconcepts.com.au) · @Leo Escoton via Work Flow RapidPlan screenshot skipped: No plan file for this task
- 11 Nov 2026, 8:05 pmLeo Escoton on CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works): Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - NMP - Energex Works - All Documents Accounts: 1x NMP - The proposed work sequence and schedules have been included, with the specific dates and times subject to your review and…
Crompton Concepts prepares the traffic management for Stockwell on this project at 175 Melbourne Street, South Brisbane, QLD. 2 Monday requests are open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 06; 6 TGS suites on file (S0 no rev, S1 Rev 04, S2 Rev 01, S3 Rev 02…). On the permit boards: 0 permits in force and 2 in progress. Monday holds 15 requests for this job (4 new, 11 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder4. Plans - CC06181
- MondayCC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works)
- MondayCC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane
- Client
- Stockwell
- Crompton job
- CC06181
- Location
- 175 Melbourne Street, South Brisbane, QLD
- LGA / authority
- —
- Project coordinator
- Caitlin H
- Latest planner · TMD
- Leo Escoton · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- 0 in force · 2 in progress
- Last activity
- 17 Nov 2026
- Files on SharePoint
- 471 in 157 folders
What needs attention now
- Urgent Issued, waiting on client: CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works). Required by 13 Nov 2026. Planner: Leo Escoton · TMD: Christopher Wright · Last note (11 Nov 2026, S.B): “Posted by Leo Escoton (leo@cromptonconcepts.com.au) · @Leo Escoton via Work Flow RapidPlan screenshot skipped: No plan file for this task”
- Complete, to be invoiced: CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane. Required by 4 Nov 2026. · Last note (12 Nov 2026, Ethan Mathews): “@Permits / @Lexi R / @Riri D. - ACCOUNTS: Please see invoicing notes below x1 CTMP amendment to add Dare's engineering doc into the CTMP.”
- Permit in progress: Road: Trenching & Energex Works (BCC road) is QPS Pending. Follow up 17 Nov 2026. Wanted from 17 Nov 2026.
- Permit in progress: Road: Early Works (BCC road) is Council Pending. Follow up 19 Nov 2026. Wanted from 10 Dec 2026.
PPermits
3 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Road: Trenching & Energex Works Team Ethan · BCC Road Permits - Ethan | BCC road | Date Specific | In progress QPS Pending | 17 Nov 2026 – 17 Dec 2026 | 19 Oct 2026 | 17 Nov 2026 | ||
| Road: Early Works Team Ethan · BCC Road Permits - Ethan | BCC road | Ongoing | In progress Council Pending | 10 Dec 2026 – 10 Jan 2027 | 3 Nov 2026 | 19 Nov 2026 | 19 Nov 2026 | |
| Footpath: Trenching & Energex Works Team Ethan · BCC Footpath Applications - Ethan | Footpath | Date Specific | Approved, starts later Permit to Invoice | 1 Dec 2026 – 31 Dec 2026 | 16 Nov 2026 | 25 Nov 2026 |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06181-CTMP-S4-Rev6-175 Melbourne Street.pdfCTMP Rev 06 · 7 Sep 2026
- PDFOut of Hours Energex Works Correspondence.pdf11 Nov 2026
- PDFD10286-EXT-CIV-PLN-STG1 (Rev H) egx signed.pdf11 Nov 2026
- PDFWR8384431 Relocation Contract.pdf11 Nov 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFS0 · CC06181-TGS-S0-R0-Concept Plan.pdfno rev
- PDFS1 · CC06181-TGS-S1-R4.pdfRev 04
- PDFS2 · CC06181-TGS-S2-R1 - Stockwell-175 Melbourne Street, South Brisbane.pdfRev 01
- PDFS3 · CC06181-TGS-S3-R2.pdfRev 02
- PDFS4 · CC06181-TGS-S4-Rev6-175 Melbourne Street.pdfRev 06
- PDFS5 · CC06181-TGS-S5-Rev00-175 Melbourne Street.pdfRev 00
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLA007147275 - 175 MELBOURNE ST SOUTH BRISBANE QLD 4101 - Footway Permit (id-7334953)16 Nov 2026
- EMLDelay in process at 175 Melbourne St South Brisbane Qld 4101 - A007147275 (id7325405)10 Nov 2026
- EMLA007082116 - 175 MELBOURNE ST SOUTH BRISBANE QLD 4101 - Footway Permit (id-7324248)9 Nov 2026
- EMLA007082116 - 175 MELBOURNE ST SOUTH BRISBANE QLD 4101 - Fee Quote (id-7320425)6 Nov 2026
- EML175 Melbourne Street, South Brisbane - Site visit 11.30am Tuesday 24.02.263 Nov 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 06 | 7 Sep 2026 | 7 | CC06181-CTMP-S4-Rev6-175 Melbourne Street.pdf |
| — | TMP | Rev 06 | 9 Nov 2026 | 7 | 260827 HV - Site Hoarding.pdfCC06181-TMP-S4-Rev6-175 Melbourne Street.pdf |
| — | NMP | no rev | 11 Nov 2026 | 0 | CC06181-NMP-Energex Works.pdf |
| — | RA | Rev 04 | 3 Jun 2026 | 5 | CC06181-RA.pdf |
| — | TIA | Rev 03 | 20 May 2026 | 4 | TIA REPORT.pdf |
| S0 | TGS | no rev | 26 Feb 2026 | 0 | CC06181-TGS-S0-R0-Concept Plan.pdf |
| S1 | TGS | Rev 04 | 3 Jun 2026 | 5 | CC06181-TGS-S1-R4.pdf |
| S2 | TGS | Rev 01 | 3 Jul 2026 | 2 | CC06181-TGS-S2-R1 - Stockwell-175 Melbourne Street, South Brisbane.pdf |
| S3 | TGS | Rev 02 | 6 Nov 2026 | 3 | CC06181-TGS-S3-R2.pdf |
| S3 | Workzone plan | Rev 00 | 7 Aug 2026 | 1 | Work zone Plan.pdf |
| S4 | TGS | Rev 06 | 9 Nov 2026 | 7 | CC06181-TGS-S4-Rev6-175 Melbourne Street.pdf |
| S5 | TGS | Rev 00 | 21 Oct 2026 | 1 | CC06181-TGS-S5-Rev00-175 Melbourne Street.pdf |
03Requests on Monday
15 requests since 25 Feb 2026: 4 for new plans and 11 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- Leo EscotonPlanner
- Christopher WrightTMD
- Caitlin HProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 12 Nov 2026, 5:29 pm · Ethan Mathews · CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane
@Permits / @Lexi R / @Riri D. - ACCOUNTS: Please see invoicing notes below x1 CTMP amendment to add Dare's engineering doc into the CTMP.
- 11 Nov 2026, 9:05 pm · S.B · CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works)
Posted by Leo Escoton (leo@cromptonconcepts.com.au) · @Leo Escoton via Work Flow RapidPlan screenshot skipped: No plan file for this task
- 11 Nov 2026, 8:05 pm · Leo Escoton · CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works)
Hi @Christopher Wright and @Riri D., for review. Link: Sharepoint - Documents - NMP - Energex Works - All Documents Accounts: 1x NMP - The proposed work sequence and schedules have been included, with the specific dates and times subject to your review and confirmation with the client. Thank you!
- 11 Nov 2026, 8:06 pm · Riri D.
NMP - Energex Works
- 11 Nov 2026, 8:06 pm · Riri D.
- 11 Nov 2026, 3:12 pm · Riri D. · CC06181- NMP - Stockwell - 175 Melbourne Street, South Brisbane (Energex Works)
Please prepare a Noise Management Plan as per the attached correspondence from Stockwell. Can we please also have the attached civil design included in the NMP. These works are for existing infrastructure upgrades for Energex Works on behalf of the development at 175 Melbourne St and will likely take somewhere between 2-4 weeks to complete and will need to be completed between 6:30pm and 6:30am (Night Works). Please also reference the Energex work order attached also. The TGS's attached will be used to complete these works and will be done as night works (See attached) Please have the NMP created and saved here below: Main Folder Link: 175 Melbourne St, South Bne NMP: NMP - Energex Works Docs: WR8384431 Relocation Contract.pdf Out of Hours Energex Works Correspondence.pdf CC06181-TGS-S1-R4.pdf CC06181-TGS-S4-Rev6-175 Melbourne Street.pdf D10286-EXT-CIV-PLN-STG1 (Rev H) egx signed.pdf
- 12 Nov 2026, 12:44 pm · Christopher Wright
This appears to be GTG
- 12 Nov 2026, 3:45 pm · Ethan Mathews
@Christopher Wright Thank you mate, this has now been sent to the client - @Riri D. FYI, changing this to "Client Review"
- 12 Nov 2026, 12:44 pm · Christopher Wright
- 2 Nov 2026, 12:05 pm · Riri D. · CC06181-S3 - Rev 1 - Stockwell - 175 Melbourne Street, South Brisbane
Please see attached TGS and CTMP amendment request form Please have the amendments completed as per this doc and saved here below: Main folder link: 175 Melbourne St, South Bne TGS / TMP: Rev 01
- 2 Nov 2026, 5:18 pm · J.R
Hi @Christopher Wright for review. Thank you! "Please amend each TGS to eliminate any works along Melbourne St, however still keeping the pedestrian detour the same for now. All construction activities to remain on Edmonstone St Only" Change log: Amendment Section Date Amended TGS 2, 3 and 5 to remove work area along Melbourne St. Pedestrian detour maintained. Revised workzone plan to remove workzone along Melbourne St. Deleted TGS 3 – Concrete Pour (Melbourne St frontage). Updated Desktop Risk Assessment. 7.1, 7.2, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G 02/11/2026 Accounts: 3x TGS amendments - TGS 2, 3 and 5 1x CTMP amendment 1x Workzone Plan amendment 1x DRA amendment
- 3 Nov 2026, 12:14 pm · Christopher Wright
Hi @J.R there is a workman 40 missing from this direction on all TGS's
- 3 Nov 2026, 12:16 pm · J.R
Hi @Christopher Wright it's 40 km/hr road (existing road speed).
- 3 Nov 2026, 12:20 pm · Christopher Wright
What if traffic turn left onto the 50 km/h road? you also have a WM40 on the other approach with a road speed of 40
- 3 Nov 2026, 12:22 pm · J.R
@Christopher Wright alright, will work on this next after my current allocation. Thanks!
- 3 Nov 2026, 2:09 pm · J.R
Hi @Christopher Wright TGS and CTMP are now updated. Thanks! Updated TMP change log: Amendment Section Date Amended TGS 2, 3 and 5 to remove work area along Melbourne St. Pedestrian detour maintained. Deleted TGS 4 - Melbourne St Concrete Pour. All remaining TGS have been updated to reflect a 40 km/h speed reduction on the westbound section of Melbourne Street approaching the site from the eastbound approach. Revised workzone plan to remove workzone along Melbourne St. Updated Desktop Risk Assessment. 7.1, 7.2, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G 02/11/2026 Updated Accounts: 4x TGS amendments - TGS 1, 2, 3 and 5 1x CTMP amendment 1x Workzone Plan amendment 1x DRA amendment
- 3 Nov 2026, 2:42 pm · Ethan Mathews
@J.R Hi Jenesis, apologies I gave you the incorrect advice... I have just re-confirmed with the client that they would actually still like to see a footpath closure for their daily arrangement and concrete pours where they use Melbourne St As per below: Please amend as per the above for TGS's 2C and 5C Please also amend to add in the attached RPEQ Doc in response to Councils RFI and add in a section in the CTMP with discussion about the findings of the RPEQ Documents. 26-073 175 Melbourne St IR Response (Transprot) v01a.pdfThank you!
- 4 Nov 2026, 1:15 pm · J.R
Hi @Christopher Wright for review. Thanks! Updated change/ rev log: Amendment Section Date Amended TGS 2 and 5 to contain the work area at Melbourne Street site frontage within footpath, while maintaining the pedestrian detour. Revised TGS 3 to remove work area along Melbourne St during site inactive. Deleted TGS 4 - Melbourne St Concrete Pour. All remaining TGS have been updated to reflect a 40 km/h speed reduction on the westbound section of Melbourne Street approaching the site from the eastbound approach. Revised workzone plan to remove workzone along Melbourne St. Updated Desktop Risk Assessment. Additional section 7.2.1 for pedestrian detour assessment summary (RPEQ). 7.1, 7.2, 7.2.1, 8, 8.1.2, 8.2, 8.3, 8.4, Appendix E, Appendix F, Appendix G, Appendix H 02/11/2026 Updated accounts: 3x TGS amendment (TGS 2, 3 and 5) 1x CTMP amendment 1x Workzone amendment 1x DRA amendment
- 5 Nov 2026, 11:44 am · Christopher Wright
This is GTG
- 2 Nov 2026, 5:18 pm · J.R
- 15 Oct 2026, 4:01 pm · Riri D. · CC06181 - S5 - Stockwell - 175 Melbourne Street, South Brisbane
- 15 Oct 2026, 11:02 am · Riri D. · CC06181 - S5 - Stockwell - 175 Melbourne Street, South Brisbane
Plans sent to Mark 175 Melbourne Street, South Brisbane .eml
- 14 Oct 2026, 2:20 pm · Riri D. · CC06181 - S5 - Stockwell - 175 Melbourne Street, South Brisbane
Plans folder: 4. Plans - CC06181 Suite: S5 - Early Works Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 175 Melbourne St, South Bne Quote: none Request type: new suite Specific operations: 1st TGS - scaffold is dark orange around the project peritmer , blue is crossover, red is hoarding installed on project boundary. trucks to reverse in under traffic control hold and release of footpath and road. green is the traffic controllers, yellow are the portabooms 2nd TGS - RIG DELIVERY, lane closure with hold and release of footpath 1x Mini TMP only Client mark-ups/attachments: request by Mark via teams
- 14 Oct 2026, 2:20 pm · Permits · CC06181 - S5 - Stockwell - 175 Melbourne Street, South Brisbane
Hi, Save Work Here: 4. Plans - CC06181 > S5 - Early Works TGS > Rev 00 TMP > Rev 00 Folder Name: 175 Melbourne St, South Bne Thanks, Iris (141026)
- 14 Oct 2026, 8:05 pm · Rudra Khadka
Hi, @Ethan Mathews @S.B Work is completed and uploaded to its respective folder. Please let me know if this requires any further adjustments/changes. Accounts, 2 x New TGS (CC06181-1B/C & CC06181-2B) 1 x New TMP (Minor) Thank You!
- 15 Oct 2026, 10:39 am · S.B
@Rudra Khadka Please use new risk assessment and options analysis format for new projects.
- 14 Oct 2026, 8:05 pm · Rudra Khadka
- 4 Sep 2026, 4:50 pm · Permits · CC06181-S4 - Rev 5 - Stockwell - 175 Melbourne Street, South Brisbane
Invoice IV0025174 - (04 Sep) Clint --> to be sent on the 25th 1x Add'l TGS (TGS 4) 1x CTMP amendment IV sent to client - Lex 3009
- 4 Sep 2026, 4:49 pm · Permits · CC06181-S4 - Rev 4 - Stockwell - 175 Melbourne Street, South Brisbane
Invoice IV0025174 - (04 Sep) Clint --> to be sent on the 25th 1x TGS amendment (TGS 2) 1x CTMP amendment IV sent to client - Lex 3009
- 4 Sep 2026, 1:39 pm · Ethan Mathews · CC06181-S4 - Rev 5 - Stockwell - 175 Melbourne Street, South Brisbane
@Permits @Lexi R @Riri D. - To Be Invoiced: Accounts: 1x Add'l TGS (TGS 4) 1x CTMP amendment This can go under PO: 07E01021
- 4 Sep 2026, 1:28 pm · Ethan Mathews · CC06181-S4 - Rev 4 - Stockwell - 175 Melbourne Street, South Brisbane
@Permits @Lexi R @Riri D. - To Be Invoiced as per below: Accounts: 1x TGS amendment (TGS 2) 1x CTMP amendment Please use PO: 07E01021
- 3 Sep 2026, 2:40 pm · Permits · CC06181-S4 - Rev 5 - Stockwell - 175 Melbourne Street, South Brisbane
Hi, please save work here. Project Location Folder: 175 Melbourne St, South Bne Suite: S4 TGS > Rev 05 TMP > Rev 05 Client: Stockwell Constructions Project: 175 Melbourne St S4 (Energex / Trench Works) to be amended and rev'd up to rev 05 and an additional new TGS to be created for a full footpath closure essentially the same as TGS: CC06181-S4-1B, however without the parking lane closure as per below: Please have this as a footpath closure ONLY and keep both TC's and just adjust this TC to be slightly closer to the intersection as per here: These works will be essentially an option B for their night works incase we don't get council approval in time for the parking lane closure. -Karein (0309)
- 3 Sep 2026, 5:22 pm · J.R
Hi @Christopher Wright for review, thank you! Rev log: Added TGS 4 for Option 2 trench works, restricting the work zone and closure to the verge/footpath. Section 2.2, Figure 3, Appendix A, Appendix B 03/09/2026 Accounts: 1x Add'l TGS (TGS 4) 1x CTMP amendment (mini)
- 4 Sep 2026, 1:27 pm · Christopher Wright
This is GTG @Ethan Mathews
- 3 Sep 2026, 5:22 pm · J.R
- 2 Sep 2026, 9:10 am · Permits · CC06181-S4 - Rev 2 - Stockwell - 175 Melbourne Street, South Brisbane
IV0025123 SEND ON 25TH - Shaz 1x tgsa 1x tmpa Iv sent to client - Lex 3009
06Every file and folder
471 files in 157 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|