825 Stanley Street, Woolloongabba
Hutchinson Builders
What's new
- 10 Nov 20264 files saved on SharePoint: Hutchinson Builders - 825 Stanley Street.xlsx, RE_ TGS's for Civil connections - The Stanley.msg, CC06215-S2-Rev12-TGS-Hutchinson Builders - 825 Stanley Street.pdf, CC06215-S2-Rev12-TGS-Hutchinson Builders - 825 Stanley Street.tcp
- 10 Nov 2026, 5:55 amP.P on CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street: @K.R @Riri D. 1xTGS amendment. 14B amended to include portion of Trafalgar St in closure area. TMP will be updated if client approves of having TMP amended. Rev 12
- 9 Nov 2026, 6:16 pmRiri D. on CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street: Hey @P.P , Thanks for getting this through. For the 14B plans, are you able to extend the closure to close the left turn lane on Trafalgar also? They will need this to allow them to get to the pit that is in the middle of the intersection. Maybe extend it…
- 7 Nov 2026, 10:10 amP.P on CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street: @Riri D. @K.R 2xTGS added to suite. This is for the 825 Stanley St project. Saved under S2- Rev11 Saved here: Rev 11 Main project folder: 825 Stanley Street, Woolloongabba
- 7 Nov 20263 files saved on SharePoint: CC06215-S2-Rev11-TGS-Hutchinson Builders - 825 Stanley Street.pdf, CC06215-S2-Rev11-TGS-Hutchinson Builders - 825 Stanley Street.tcp, TGS's for Civil connections - The Stanley.msg
- 6 Nov 2026, 5:42 pmRiri D. on CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street: Plans folder: Plans - CC06215 Suite: S2 Save work here: TGS > Rev 11 Project location: 825 Stanley Street, Woolloongabba Quote: none Job request form: none Request type: New Scope: TGS Hi @P.P For this project, we will need to prepare some plans for the…
Crompton Concepts prepares the traffic management for Hutchinson Builders on this project at 825 Stanley Street, Woolloongabba, QLD. 1 Monday request is open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 07; 2 TGS suites on file (S1 Rev 03, S2 Rev 12). Monday holds 12 requests for this job (2 new, 10 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06215
- MondayCC06215-S2 - Rev 11 - Dowells - 825 Stanley Street
- Client
- Hutchinson Builders
- Crompton job
- CC06215
- Location
- 825 Stanley Street, Woolloongabba, QLD
- LGA / authority
- —
- Project coordinator
- C.C
- Latest planner · TMD
- P.P
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 10 Nov 2026
- Files on SharePoint
- 167 in 135 folders
What needs attention now
- Issued, waiting on client: CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street. Required by 1 Jan 1970. Planner: P.P · Last note (10 Nov 2026, P.P): “@K.R @Riri D. 1xTGS amendment. 14B amended to include portion of Trafalgar St in closure area. TMP will be updated if client approves of having TMP amended. Rev 12”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06215-CTMP-Rev07- 825 Stanley St.pdfCTMP Rev 07 · 5 Sep 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- MSGRE_ TGS's for Civil connections - The Stanley10 Nov 2026
- MSGTGS's for Civil connections - The Stanley7 Nov 2026
- EMLURGENT - Single lane closure on Stanley street26 Oct 2026
- MSGRe_ TGS update - The Stanley24 Oct 2026
- MSGTGS update - The Stanley17 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 07 | 5 Sep 2026 | 8 | CC06215-CTMP-Rev07- 825 Stanley St.pdf |
| — | TMP | Rev 07 | 5 Sep 2026 | 8 | CC06215-TMP-Rev07.pdf |
| — | RA | Rev 07 | 21 Aug 2026 | 6 | CC06215-RA.pdf |
| S1 | TGS | Rev 03 | 13 May 2026 | 4 | CC06215-S1-Rev3-TGS-Hutchinson Builders - 825 Stanley Street.pdf |
| S2 | TGS | Rev 12 | 10 Nov 2026 | 6 | CC06215-S2-Rev12-TGS-Hutchinson Builders - 825 Stanley Street.pdf |
03Requests on Monday
12 requests since 16 Mar 2026: 2 for new plans and 10 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- !! Archived
- ACCOUNTS
- CA - Annabelle Watts0439 722 809
- CAannabelle.watts@hutchinsonbuilders.com.au
- CA Email Address
- CA Phone Number
- PM - Campbell Curcio0428 667 673
- PMcampbell.curcio@hutchinsonbuilders.com.au
- Pre-construction Mgr William Steele0404 542 710
- PM Email Address
- PM Phone Number
- Projc. Engr. Name - Email
- Projc. Engr. Name - Phone Number
- SMjon.mann@hutchinsonbuilders.com.au
- SM Email Address
- SM Phone Number
- SM - Jon Mann0437 638 239
- Site Engr. Name - Email
- Site Engr. Name - Phone Number
- Team Leader - Greg Crittall0400 898 151
- Team Leadergreg.crittall@hutchinsonbuilders.com.au
- WHS Name - Email
- WHS Name - Phone Number
- WHS Email Address
- WHS Phone Number
- Contracts Admin - Annabelle Watts0439 722 809
- Pre-construction Mgr - Campbell Curcio0428 667 673
- Pre-construction Mgrcampbell.curcio@hutchinsonbuilders.com.au
Crompton Concepts
- P.PPlanner
- C.CProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 10 Nov 2026, 5:55 am · P.P · CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street
@K.R @Riri D. 1xTGS amendment. 14B amended to include portion of Trafalgar St in closure area. TMP will be updated if client approves of having TMP amended. Rev 12
- 9 Nov 2026, 6:16 pm · Riri D. · CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street
Hey @P.P , Thanks for getting this through. For the 14B plans, are you able to extend the closure to close the left turn lane on Trafalgar also? They will need this to allow them to get to the pit that is in the middle of the intersection. Maybe extend it down to where the parking lane stops on Trafalgar west bound to give them room for machines etc.
- 7 Nov 2026, 10:10 am · P.P · CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street
@Riri D. @K.R 2xTGS added to suite. This is for the 825 Stanley St project. Saved under S2- Rev11 Saved here: Rev 11 Main project folder: 825 Stanley Street, Woolloongabba
- 6 Nov 2026, 5:42 pm · Riri D. · CC06215-S2 - Rev 11 - Dowells - 825 Stanley Street
Plans folder: Plans - CC06215 Suite: S2 Save work here: TGS > Rev 11 Project location: 825 Stanley Street, Woolloongabba Quote: none Job request form: none Request type: New Scope: TGS Hi @P.P For this project, we will need to prepare some plans for the service connections for the civil works that will take place on Jurgens St and Trafalgar St. Please see plans attached plans outlining water, sewer, stormwater services with required depths being up to 5m. as this is over the 500mmdeep and we cant keep traffic 2.5m away, we will need to full closure the streets when working. (Jurgens street will be a one direction closure due to the multiple lanes giving enough offset. We will need the below plans to get these done please. * Jurgens Street full closure. (anticipate night shift)* Please allow for full closure of Jurgens street (only the southbound lanes) for the sewer works as per mark up. * Please add footpath closure along the Jurgens street frontage closest to the site also. Trafalgar Street Full closure (anticipate day shift) * Full closure of Trafalgar at the site need only for the water crossing, and stormwater drainage also please. * Ped diversions as required on each side as it will cross both footpaths at some point. TGSs for Civil connections - The Stanley.emlATLAS ENGINEERS MARK UP OF PROPOSED SERVICES.pdf
- 3 Nov 2026, 10:26 am · Permits · CC06215-S2 - Rev 8 - Hutchinson Builders - 825 Stanley Street
1 TGS NEW INV IV0025710 Invoice IV0025710 - Re_ URGENT - Single lane closure on Stanley street.eml
- 29 Oct 2026, 11:01 am · Permits · CC06215-S2 - Rev 3 - Hutchinson Builders - 825 Stanley Street
- 26 Oct 2026, 2:11 pm · Permits · CC06215-S2 - Rev 10 - Hutchinson Builders - 825 Stanley Street
No charge as per tracker - Lexi
- 26 Oct 2026, 2:10 pm · Permits · CC06215-S2 - Rev 10 - Hutchinson Builders - 825 Stanley Street
Created this Monday line for invoicing purposes only. - Lexi Link: Rev 10
- 26 Oct 2026, 2:08 pm · Permits · CC06215-S2 - Rev 9 - Hutchinson Builders - 825 Stanley Street
This is no charge as per tracker. Thanks! - Lexi
- 26 Oct 2026, 2:07 pm · Permits · CC06215-S2 - Rev 9 - Hutchinson Builders - 825 Stanley Street
Created this Monday line for invoicing purposes - Lexi Link: Rev 09
- 16 Oct 2026, 12:41 pm · Riri D. · CC06215-S2 - Rev 8 - Hutchinson Builders - 825 Stanley Street
Hi @P.P, Long storey short. We need to combine a couple of these plans for the attached as below. Plan S2-11B – half road closure on Trafalgar Street please add below. * Add from plan S2-4B* Needs to have the hold and release signage added the same on Trafalgar Street (currently no PTS on Trafalgar Street west bound). * Add Jurgens Street PTS and stop here when directed (can you get this to work? The PTS on plan 4B is already installed on poles, so needs to be the same location if possible please) if not let me know and I will not let them hold traffic on this street as Trafalgar Street is closed. If you can get me this one back, I will double check the signs that have been installed and cross check the after hours plan and perm signage plan. TGS update - The Stanley.eml
- 17 Oct 2026, 4:49 am · P.P
@Riri D. @K.R non-billable. Minor revision to TGS 11 and 12 to reflect long-term signs that have been installed. Sent to client Rev 09
- 20 Oct 2026, 12:39 pm · Riri D.
@P.P Hi Pat, Only just getting a chance to look over and compare these plans. Can you please make the following tweaks? They are pretty minor, the issue is, your team installed signs on the site before there were TGS’s finalised, and now I am trying to make everything work with what they installed and what’s needed. They didn’t even tell me they were installing them and it’s caused a massive headache. Its actually a bit embarrassing to be honest, (not your fault at all, just having a bit of a vent). Anyway, can you please amend the attached last amendment as below? * Note - The site will be using Plans 5B and 11B as the two main plans for the foreseeable future. * Plan 11B is missing some end road works signs on Logan road and Jurgens street * Please update these above 2 plans to physically show the duplicated signs that are on both sides of the road, not just the one side with the back…
- 24 Oct 2026, 10:50 am · P.P
@K.R non-billable internal amendments to correct long term sign harmonization across TGS suite. Rev 10
- 17 Oct 2026, 4:49 am · P.P
- 8 Oct 2026, 5:48 am · P.P · CC06215-S2 - Rev 8 - Hutchinson Builders - 825 Stanley Street
@K.R @Permits 1xTGS added for single lane closure. Plans sent to client. Awaiting client approval to update TMP.
- 7 Oct 2026, 11:56 am · Permits · CC06215-S2 - Rev 8 - Hutchinson Builders - 825 Stanley Street
Hi Plans folder: Plans - CC06215 Suite: S2 Save work here: TGS > Rev 08 Project location: 825 Stanley Street, Woolloongabba Hi Pat, Just chasing an urgent TGS for this one please mate. Basically, need a single lane closure on Stanley street, to allow the cross over to be removed and re poured for this one, this will also include the ped detour. Can we have this as a separate TGS at the end of this set please? When can you get me this one back please? Need it ASAP. Email Attached: URGENT - Single lane closure on Stanley street.eml Thank you! 🧡Kim
- 30 Sep 2026, 10:38 pm · Lexi R · CC06215-S2 - Rev 7 - Hutchinson Builders - 825 Stanley Street
2 TGS NEW 2 TMP Amendment INV IV0025309 Invoice IV0025309 - Re_ The Stanley - Hutchies East Brisbane.eml
- 16 Sep 2026, 12:42 am · P.P · CC06215-S2 - Rev 7 - Hutchinson Builders - 825 Stanley Street
@K.R 2xTGS and 2xTMP amendments Rev 07
- 4 Sep 2026, 1:26 pm · Permits · CC06215-S2 - Rev 7 - Hutchinson Builders - 825 Stanley Street
Hi @P.P Creating this for updates and invoicing purpose. Location: S2 > Rev 07 Project location: 825 Stanley Street, Woolloongabba Scope: 2 new tgs and tmp amendment. Client mark-up: Went to site to have a look at this one. There is a special issue on site, which means they can’t drive the trucks in from the Stanley Street gate as they simply cant get in this way give the proximity to the excavation and the swept paths. They can however get out this way. Basically, need the TGS’s and TMP to have this option added for this early portion of the project. As a result, can I please have the below prepared? This is only for the earthworks portion of the project. TGS’s New TGS – for half road closure on Trafalgar Street * Trucks entering the site gate in reverse to the current set up * Exiting the Stanley street gate with one TC calling the trucks out in the gaps in traffic. * I stood here and assessed the gaps in traffic. There is min 20 second gaps between last car to next car during each phase of the traffic lights at Wellinton road intersection, and this is frequent, a least 3 times within 5 mins. See attached photos of the gaps with no vehicles approaching. The 4 photos below that were taken between 9.20am and 9.23am of the 4 gaps in this time frame. New TGS – parking lane and footpath closure on Trafalgar Street * Trucks entering through the Trafalgar street gate. * Exiting via the Stanley street gate as above. TMP Amend the TMP to have this detail added. The Stanley -…
- 1 Sep 2026, 1:41 pm · Permits · CC06215-S2 - Rev 6 - Hutchinson Builders - 825 Stanley Street
Plans sent by Patrick - Lexi ** Hi Adam, Please see attached documents TMP: CC06215-CTMP-Rev06- 825 Stanley St.pdf Re_ The Stanley _ TMP and TGS Update.eml
- 1 Sep 2026, 1:43 pm · Permits
1 TGS NEW 1 TMP AMENDMENT INV IV0025014 Invoice IV0025014 - Re_ The Stanley _ TMP and TGS Update.eml
- 1 Sep 2026, 1:43 pm · Permits
- 31 Aug 2026, 4:53 pm · Permits · CC06215-S2 - Rev 5 - Hutchinson Builders - 825 Stanley Street
3 TGS AMENDMENT 1 TMP AMENDMENT INV IV0025012 Invoice IV0025012 - Re_ RE_ The Stanley _ TMP and TGS Update.eml
- 31 Aug 2026, 4:39 pm · Permits · CC06215-S2 - Rev 4 - Hutchinson Builders - 825 Stanley Street
2 TGS AMENDMENT 1 TMP AMENDMENT INV IV0025010 Invoice IV0025010 - RE_ The Stanley _ TMP and TGS Update.eml
06Every file and folder
167 files in 135 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|