← All projectsCC06217
Project portal · built 17 Nov 2026, 10:03 am AEST · Permit in progress

61 - 73 Meron Street Southport

Platform Constructions

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Platform Constructions on this project at 59 Meron Street, Southport, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 06; 2 TGS suites on file (General Rev 06, S1 Rev 06). On the permit boards: 0 permits in force and 2 in progress. Monday holds 2 requests for this job (0 new, 2 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Platform Constructions
Crompton job
CC06217
Location
59 Meron Street, Southport, QLD
LGA / authority
City of Gold Coast
Project coordinator
D.B
Latest planner · TMD
—
Monday project status
New
Deliverables
Council Road Permit, Engineering (RPEQ), Engineering Design, Footpath Permit, Noise Management Plan, Out of Hours Permit, Police Permit, RA
Permits (Monday)
0 in force · 2 in progress
Last activity
16 Nov 2026
Files on SharePoint
95 in 39 folders

What needs attention now

  1. Permit in progress: Half Road: Pre-cast Installation (Gold Coast) is Initial Pending. Follow up 23 Nov 2026. Wanted from 30 Nov 2026.
  2. Permit in progress: RCP (TMR) is TMR Pending. Follow up 23 Nov 2026. Wanted from 31 Aug 2026.

PPermits

2 permit lines on the Monday permit boards: 0 in force, 2 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Half Road: Pre-cast Installation
Team Aisha · Gold Coast Permits - Aisha
Gold CoastDate SpecificIn progress
Initial Pending
30 Nov 2026 – 4 Dec 20269 Nov 202623 Nov 2026
RCP
Team Aisha · TMR Permits - Aisha
TMROngoingIn progress
TMR Pending
31 Aug 2026 – 31 Aug 202727 Aug 202623 Nov 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0624 Aug 20267CC06217-S1-CTMP-R06 - 61-73 Meron St, Southport.pdf
—TMPRev 0624 Aug 20267CC06217-S1-TMP-R06 - 61-73 Meron St, Southport.pdf
—RARev 0617 Aug 20263CC06217-S1-RA-R5 - 61-73 Meron St, Southport.pdf
—Letter to residentsRev 0613 Jul 20263CC06217-Letter to Residents.pdf
GeneralTGSRev 0619 Aug 20261CC06217-Occupancy Map.pdf
GeneralSwept pathRev 0617 Jul 20262Swept Path_61-73 Metron St,Southport.pdf
GeneralWorkzone planRev 0619 Aug 20266CC06217-WZ Plan Gibbs.pdfCC06217-WZ Plan Meron.pdf
S1TGSRev 0619 Aug 20264CC06217-S1-TGS-R06 - 61-73 Meron St, Southport.pdf

03Requests on Monday

2 requests since 2 Jun 2026: 0 for new plans and 2 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06217-S1 - Rev 5 - Platform Constructions - 61-73 Meron Street, Southport QLD 4215Council RFIS1Rev 05Closed
No Charge
10 Aug 202612 Aug 2026
CC06217 - S1 - Rev 1 - Platform Constructions - 61-73 Meron Street, Southport QLD 4215AmendmentS1Rev 01Closed
No Charge
2 Jun 20264 Jun 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • AishaProject coordinator (folder flag)
  • D.BProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. No Monday updates on this project's requests since late August.

06Every file and folder

95 files in 39 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved