444-448 The Esplanade, Palm Beach

MDP PB Pty Ltd

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for MDP PB Pty Ltd on this project at 444-448 The Esplanade, 444-448 The Esplanade, Palm Beach, QLD. 1 Monday request is open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 10; 3 TGS suites on file (General Rev 07, S1 Rev 07, S2 Rev 00). On the permit boards: 0 permits in force and 7 in progress. Monday holds 12 requests for this job (1 new, 11 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
MDP PB Pty Ltd
Crompton job
CC06326
Location
444-448 The Esplanade, 444-448 The Esplanade, Palm Beach, QLD
LGA / authority
—
Project coordinator
Christopher Wright
Latest planner · TMD
J.G · Christopher Wright
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
0 in force · 7 in progress
Last activity
16 Nov 2026
Files on SharePoint
590 in 137 folders

What needs attention now

  1. Issued, waiting on client: CC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm Beach. Required by 26 Sep 2026. Planner: J.G · TMD: Christopher Wright · Last note (25 Sep 2026, A.A): “@K.R GTG”
  2. Permit in progress: TRC – Piling Rig Removal (Gold Coast) is Initial Pending. Follow up 17 Nov 2026. Wanted from 24 Nov 2026.
  3. Permit in progress: AHB – Piling Rig Removal (Gold Coast) is Initial Pending. Follow up 17 Nov 2026. Wanted from 24 Nov 2026.
  4. Permit in progress: Dewatering Temp Pipe (Gold Coast) is QPS Pending. Follow up 17 Nov 2026. Wanted from 16 Nov 2026.
  5. Permit in progress: TCP (TMR) is TMR Pending. Follow up 17 Nov 2026. Wanted from 1 Dec 2026.
  6. Permit in progress: Top Down Slab Concrete Pour (Gold Coast) is QPS Pending. Follow up 18 Nov 2026. Wanted from 11 Dec 2026.
  7. Permit in progress: Operational (Gold Coast) is Fee Quote/Notice to Pay Received / Sent. Follow up 19 Nov 2026. Wanted from 17 Dec 2026.
  8. Permit in progress: Footpath Continuous Occupation (Footpath) is Fee Quote/Notice to Pay Received / Sent. Follow up 19 Nov 2026. Wanted from 17 Dec 2026.

PPermits

8 permit lines on the Monday permit boards: 0 in force, 7 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
TRC – Piling Rig Removal
Team Kerri · Gold Coast Permits - Kerri
Gold CoastDate SpecificIn progress
Initial Pending
24 Nov 2026 – 27 Nov 202610 Nov 202617 Nov 2026
AHB – Piling Rig Removal
Team Kerri · Gold Coast Permits - Kerri
Gold CoastDate SpecificIn progress
Initial Pending
24 Nov 2026 – 27 Nov 202610 Nov 202617 Nov 2026
Dewatering Temp Pipe
Team Kerri · Gold Coast Permits - Kerri
Gold CoastDate SpecificIn progress
QPS Pending
16 Nov 2026 – 4 Dec 202630 Sep 202617 Nov 2026
Top Down Slab Concrete Pour
Team Kerri · Gold Coast Permits - Kerri
Gold CoastDate SpecificIn progress
QPS Pending
11 Dec 2026 – 16 Dec 202610 Sep 202618 Nov 2026
TCP
Team Kerri · TMR Permits - Kerri
TMRDate SpecificIn progress
TMR Pending
1 Dec 2026 – 1 Mar 202727 Oct 202617 Nov 202625 Jan 2027
Operational
Team Kerri · Gold Coast Permits - Kerri
Gold CoastOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
17 Dec 2026 – 17 Mar 20273 Nov 202619 Nov 20261 Feb 2027
Footpath Continuous Occupation
Team Kerri · Gold Coast Permits - Kerri
FootpathOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
17 Dec 2026 – 17 Mar 20273 Nov 202619 Nov 20261 Feb 2027
Oceanway Bollards
Team Kerri · Gold Coast Permits - Kerri
Gold CoastDate Specific
Done

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

12 requests since 11 May 2026: 1 for new plans and 11 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06326-S1 - Rev 7 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Rev 07With client
Client review
24 Sep 202626 Sep 2026J.GChristopher Wright
CC06326-S1 - Rev 6 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Rev 06Closed
No Charge
16 Sep 202618 Sep 2026
CC06326-S1 - Standalone plan - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Closed
No Charge
8 Sep 202610 Sep 2026
CC06326 - TMP - Rev 8 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentTMPRev 08Closed
No Charge
1 Sep 20263 Sep 2026
CC06326-S1 - Rev 5 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Rev 05Closed
No Charge
24 Aug 202626 Aug 2026
CC06326-S1 - Rev 4 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Rev 04Invoiced
Invoiced
10 Aug 202612 Aug 2026
CC06326 - MDP PB - 444 The Esplanade, Palm Beach | LONO Review Feedback 2AmendmentInvoiced
Invoiced
29 Jul 202631 Jul 2026
CC06326 - MDP PB Pty Ltd - 444 The Esplanade | Early WorksAmendmentClosed
No Charge
8 Jul 202610 Jul 2026
CC06326-S1 - Rev 3 - MDP PB - 444-448 The Esplanade, Palm BeachAmendmentS1Rev 03Invoiced
Invoiced
3 Jul 20265 Jul 2026
CC06326 - MDP PB - 444-448 The Esplanade, Palm Beach - Council LONO Review RFIAmendmentClosed
No Charge
2 Jul 20264 Jul 2026
CC06326-S1 - Marquee - 444-448 The EsplanadeAmendmentS1Invoiced
Invoiced
22 May 202624 May 2026
CC06326 - Marquee - 444-448 The EsplanadeNew plansInvoiced
Invoiced
11 May 202618 May 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Archives and Updates!!
  • Paul MCCartypaulm@marqueedp.com.au
  • CA - Josh Porterjoshp@marqueedp.com.au
  • SM - Matthew Bellmattb@marqueedp.com.au
  • PM - Keith Deppelerkeithd@marqueedp.com.au
  • 0417 552 6100417 552 610
  • Ryan Mcleodryanm@marqueedp.com.au
  • 04508645110450864511

Crompton Concepts

  • J.GPlanner
  • Christopher WrightProject coordinator (Monday), TMD

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @K.R GTG

  2. No Charge this amendment

  3. Hi @J.G, Kindly see info below: Plans Folder: Plans CC06326 Suite: S1 Please save work here: TGS > Rev 7 TMP > Rev 10 Instructions as provided by @K.R : Dewatering Pipe Work Installation - Amendment in requirements. The neighbouring developer received approval for road widening works in the Esplanade that clashed with the original design for dewatering pipework install. As a result,a change in the design is required and re-lodgement with Council. Refer attached revised design (pipe run in red). We will need to rip up the roadway twice, once for the pipework installation (end of October 2026 next month) and again approx 10 months later for the removal of the pipe (Council will not allow the pipe to be left in the ground. Client is still to confirm if one day or more is required. I will update infor when he calls back. 30285291-10-EA0025-01-CivilQuery.pdf Please design an additional TGSs and TMP Amendment. ***additional info: Road closure from Manhole at the intersection of 25th Ave and The Esplanade. Works will take approx. 1 week to complete. Road will will be opened after hours. Access to the northern end of The Esplanade can be maintained under traffic control - hold and release. Access to the one driveway to the north of site will be maintained during the day via use of road plates. Access to properties south of the site will have to utilise the Alternate Access Arrangements. Original design is no longer viable due to road widening by the neighbouring property. Any…

    • 24 Sep 2026, 10:17 am · K.R

      @J.G from client * We can maintain access to the 1x house at 454 the esplanade via steel plates. The remainder of dwellings to the south will need to have the 23rd av alternate access implemented. We will need to notify OBX and co-ordinate with them. Council Contact for OPW

    • 25 Sep 2026, 9:00 am · J.G

      @K.R @Christopher Wright For review. Thank you Additional TGSs added for updated Dewatering Pipe Work Installation with road widening works (TGS 10&11) as instructed above. I didn’t make any changes to the previous TGS (TGS 7 & 8) without road‑widening works, as the amendment would be identical to the new one. This now for review, please let me know if anything needs to be updated. Thank you TGS > Rev 7 TMP > Rev 10

    • 25 Sep 2026, 12:52 pm · K.R

      @J.G this will need to be updated to the new arrangement. With the section that mentions the old TGS's please make a note that this will not be implemented due to change in design. Watermark the TGS's in the TMP that are not used for this work please

    • 25 Sep 2026, 1:14 pm · J.G

      @K.R TMP/CTMP updated. Thank you TGS > Rev 7 TMP > Rev 10

    • 28 Sep 2026, 12:05 pm · K.R

      @J.G The client has reviewed and asked to make the minor change for the after hours - access to the one driveway between the corner and site can be maintained using steel plates but not during working hours, they will have to use the alternative access. The works will be staged so that this can be maintained. Can we also change the colour of the approved road widening as I think this is confusing the working area. Please update the images and information in TMP . Thanks No need to Rev Up.

    • 28 Sep 2026, 12:25 pm · J.G

      @K.R TGS and TMP updated. Thank you TGS > Rev 7 TMP > Rev 10

    • 28 Sep 2026, 1:31 pm · K.R

      @J.G - Client has sent the below. Sorry (with regard to the wrong pipe alignment. I think he was confused by the red hashing. Can you check his notes also per below * Dewatering TGS is incorrect (wrong pipe alignment). Please update. * Please make a note/show on TGS that works will be staged with trafficable steel plates as required to maintain access to 454 The Esplanade during work hours. * All other dwellings to south of site will require alternate 23rd av access during work hours. * Works will be staged with steel plates as required to enable the street to be opened up outside of work hours 6:30pm-6:30am.

    • 28 Sep 2026, 2:45 pm · J.G

      @K.R for confirmation please. Thank you 2. Per client review above, he mentioned no steel plates during working hours. Can we confirm what is the final and if steel plates are also required on the driveway of 454 The Esplanade outside work hours 3. Shown in site active already 4. With a note on plan about the staging, I will add the work hours in the note I think the client is looking at the previous plan TGS 7B & 8B which should be TGS 10B and 11B.

    • 29 Sep 2026, 9:52 am · J.G

      @K.R Please disregard confirmation above. -I’ve hidden old dewatering plan in TGS and label it not in use on the cover page -added notes on the TGS per client's notes -TMP updated as well For review. Thank you TGS > Rev 7 TMP > Rev 10

    • 29 Sep 2026, 2:55 pm · K.R

      @J.G can you please update the TGS for the dewatering pipeline per the comments on the TGS below CC06326-TGS-S1-Rev07 - client comments.pdf Many Thanks

    • 29 Sep 2026, 3:24 pm · J.G

      @K.R All good, thank you Link: TGS > Rev 7 TMP > Rev 10

  4. No Charge - MJ required measurements to be added to plan for Oceanway impact for emergencies.

  5. No Charge To Client - Council asking to expand on explanation.

  6. Posted by jaymark@cromptonconcepts.com.au (jaymark@cromptonconcepts.com.au) · @J.G via Work Flow Also updated TMP relevant sections and figures. Links * TGS - Rev 6 * TMP - Rev 9

    • 16 Sep 2026, 11:35 am · Permits

      Hi @J.G I have new notes from Kelly.. thanks - Shaz Can we please give the option for Porta-boom or flagman, based on the harmonisation it will be 2 x prepare to stops

    • 16 Sep 2026, 11:55 am · J.G

      @K.G Hi, passing this along to see if it works before I finalise it. Let me know, thank you

    • 18 Sep 2026, 7:54 am · Permits

      Hi @J.G please finalize.. thank you - Shaz

    • 18 Sep 2026, 8:23 am · J.G

      Thanks! I've uploaded the updated files for review. * TGS - Rev 6 * TMP - Rev 9

  7. Hi team! Please save work here: Rev 6 Plans folder: Plans CC06326 Request type: Amendment Make the following amendments, this harmonized with the current site in the area. - prepare to stops on gold coast highway to be changed to flagman's and not porta-booms - Put a red ring around all the signs and label them in the legend as Chippendaries - remove all the signs in the blue box - Green box make this the porta-boom prepare to stop sign Thanks - Shaz

    • 23 Sep 2026, 1:50 pm · Christopher Wright

      Hi @J.G we have a 40 speed zone in one direction but not the other. the 40 either needs to be removed or a 40 zone needs to be implemented in the opposing direction. This is on all relevant TGS's.

    • 23 Sep 2026, 3:09 pm · J.G

      @Christopher Files are updated. Thank you Link: * TGS - Rev 6 * TMP - Rev 9 I've kept 40 zone on TGS 7B due to workers near traffic (<1.2m lateral clearance) but removed 40 zone across other TGSs.

    • 24 Sep 2026, 6:40 am · Christopher Wright

      This is GTG @K.R

  8. No Charge - Portabooms not available - corflute change only

  9. @K.R GTG

  10. Hi @K.R , This is now for your review. I made 2 PDF's, one is a full set of S1 but 6B shows the TC corflute sign as requested. The other PDF is just TGS 6 alone. Accounts: 1xTGS Amendment (S1-Rev05-6B) Link: Piling Rig No Boom TGS

  11. No Charge - Very Minor Amendment

  12. Plans folder: Plans CC06326 Suite: 1. TGS Save work here: TGS > Piling Rig No Boom TGS Project location: 444-448 The Esplanade, Palm Beach Quote: Request type: Amendment Scope: TGS Specific operations: TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to?

    • 8 Sep 2026, 1:59 pm · K.R

      @C.R could you please replace the Boom corflutes with the TC symbolic. This will only be utilised for Thursday piling rig delivery on site so only need a PDF of this plan only done separately. Please do not change the original plans. Please save this version in the Piling Rig No Boom TGS folder. only I have saved a copy of the plan 6B that I need in the folder for reference.

  13. Kerri sent to client 0109 Re_ CRM - 1768226 - LONO Review_ LONO -Review 6 _ Marquee - 444-448 The Esplanade, Palm Beach _TMP Rev 07 and TGSs Rev 4 Plans.eml

  14. Posted by jaymark@cromptonconcepts.com.au (jaymark@cromptonconcepts.com.au) via Work Flow TMP amendment Links * TGS-Rev5 * TMP-Rev8

  15. Hi @J.G Please save work here: 2. TMP > Rev 8 Kerri will add details below. thanks - shaz

    • 1 Sep 2026, 10:06 am · K.R

      @J.G - We will also need to update the revision and Change log. One final update to the Road and Footpath Occupancy Map. Council comments:- Area measurement of the impacted ocean way footpath 20/08 This is not in regards to payment, this is to determine where is the location and the extended impact. 1/09 Acknowledged that RPEQ document has been provided, however, area measurements (L x W) was not provided in Road and Footpath Occupancy Map. Measurements provided by Keith See attached measure, 355m2 of the MRV swept path (I confirmed over the phone with MJ this is the measurement she wanted). The Esplanade - M2 Measure of MRV swept path.pdf

    • 3 Sep 2026, 10:42 am · Christopher Wright

      This is GTG

06Every file and folder