← All projectsCC06381
Project portal · built 17 Nov 2026, 10:03 am AEST · To invoice

Sora_9-11 Thornton St, Surfers Paradise

OBX Constructions

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for OBX Constructions on this project at 9-11 Thornton St, Surfers Paradise, QLD. 1 Monday request is open; the most pressing is at the to invoice stage; the current CTMP on SharePoint is Rev 07; 2 TGS suites on file (S1 Rev 07, S2 Rev 00). On the permit boards: 1 permit in force and 3 in progress. Monday holds 8 requests for this job (2 new, 6 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
OBX Constructions
Crompton job
CC06381
Location
9-11 Thornton St, Surfers Paradise, QLD
LGA / authority
City of Gold Coast
Project coordinator
C.C
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
1 in force · 3 in progress
Last activity
17 Nov 2026
Files on SharePoint
345 in 87 folders

What needs attention now

  1. Complete, to be invoiced: CC06381-S1 - Rev 6 - OBX Constructions - 9-11 Thornton St, Surfers Paradise. Required by 29 Oct 2026. · Last note (12 Nov 2026, Ethan Mathews): “@Riri D. / @Lexi R / @Permits ACCOUNTS - Please invoice as per below: x1 CTMP amendment for adjusted Workzone TGS to be prepared and amended into the CTMP with correspondence…”
  2. Permit in progress: AHB – Piling Rig Removal (Gold Coast) is Initial Pending. Follow up 20 Nov 2026. Wanted from 24 Nov 2026.
  3. Permit in progress: Low Impact (Gold Coast) is Fee Quote/Notice to Pay Received / Sent. Follow up 23 Nov 2026. Wanted from 3 Dec 2026.
  4. Permit in progress: Medium Impact (Gold Coast) is Fee Quote/Notice to Pay Received / Sent. Follow up 23 Nov 2026. Wanted from 3 Dec 2026.

PPermits

9 permit lines on the Monday permit boards: 1 in force, 3 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
AHB – Piling Rig Removal
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificIn progress
Initial Pending
24 Nov 2026 – 1 Dec 202621 Oct 202620 Nov 2026
Low Impact
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
3 Dec 2026 – 3 Mar 202719 Oct 202623 Nov 202620 Jan 2027
Medium Impact
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn progress
Fee Quote/Notice to Pay Received / Sent
3 Dec 2026 – 3 Mar 202719 Oct 202623 Nov 202620 Jan 2027
KDR (Signage)
Team Ethan · Gold Coast Permits - Ethan
Gold CoastOngoingIn force
Done
2 Sep 2026 – 2 Mar 202725 Aug 20262 Feb 2027
TRC – Tower Crane Install
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificApproved, starts later
Done
15 Dec 2026 – 17 Dec 202616 Nov 2026
AHB – Tower Crane Install
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificApproved, starts later
Done
15 Dec 2026 – 17 Dec 202616 Nov 2026
KDR (Tower Crane Installation)
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificApproved, starts later
Done
15 Dec 2026 – 22 Dec 202610 Nov 2026
LONO
Team Ethan · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONO
Done
TRC – Piling Rig Removal
Team Ethan · Gold Coast Permits - Ethan
Gold CoastDate SpecificClosed
Cancelled
24 Nov 2026 – 1 Dec 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

8 requests since 23 May 2026: 2 for new plans and 6 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06381-S1 - Rev 7 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseCouncil RFIS1Rev 07Closed
No Charge
30 Oct 20261 Nov 2026
CC06381-S1 - Rev 6 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseCouncil RFIS1Rev 06To invoice
To Be Invoiced
27 Oct 202629 Oct 2026
CC06381-S1 - Rev 4 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseAmendmentS1Rev 04Invoiced
Invoiced
11 Sep 202613 Sep 2026
CC06381-S1 - Rev 2 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseAmendmentS1Rev 02Closed
No Charge
25 Aug 202627 Aug 2026
CC06381-S1 - Rev 2 - OBX Constructions - 9-11 Thornton St, Surfers Paradise (TMP ONLY)AmendmentS1Rev 02Closed
No Charge
6 Aug 202612 Aug 2026
CC06381-S2 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseNew plansS2Invoiced
Invoiced
31 Jul 20262 Aug 2026
CC06381-S1 - Rev 1 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseCouncil RFIS1Rev 01Closed
No Charge
16 Jul 202618 Jul 2026
CC06381 - OBX Constructions - 9-11 Thornton St, Surfers ParadiseNew plansInvoiced
Invoiced
23 May 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • C.CProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. @Riri D. / @Lexi R / @Permits - ACCOUNTS: This will be a no charge as per Ethan due to Council RFI

  2. @Riri D. / @Lexi R / @Permits ACCOUNTS - Please invoice as per below: x1 CTMP amendment for adjusted Workzone TGS to be prepared and amended into the CTMP with correspondence attached from OBX

  3. Hi @Ethan Mathews and @Christopher Wright , This is now for review. Thanks! Accounts: 1xTGS Amendment (CC06381-S1-Rev07-TGS 4) 1xLetter to Residents Amendment 1xTMP Amendment (Rev07) Links: TGS: Rev 07 TMP: Rev 07

    • 3 Nov 2026, 1:03 pm · Christopher Wright

      This is GTG @Ethan Mathews

    • 3 Nov 2026, 4:43 pm · Ethan Mathews

      @C.R Hi Cleo, apologies if this wasn't provided in the initial amendment request, however the client would like to see the closure extended to the top of Thornton St / Intersection of Garfield Terrace as per below: Could you please also confirm if we should be showing QPS Signage along Surfers Paradise Blvd? Other than that, everything looks good to me :) @Christopher Wright FYI

    • 3 Nov 2026, 5:21 pm · C.R

      Hi @Ethanand @Christopher, just reaching out to ask if there are provisions that prohibits us from placing police signs along Surfers Paradise. Can you please advise if there are rules regarding this as I haven't encountered one before. If none, the QPS advance warning sign is a requirement since we have QPS ahead and the lights are only flashing ambers which may confuse drivers.

    • 3 Nov 2026, 6:42 pm · C.R

      Hi @Christopherand @Ethan, files have been amended and reuploaded for final review. Please advise on the QPS signages if you need me to remove them. For now, I kept it as is and extended the full road closure up to Garfield Terrace. Links: TGS: Rev 07 TMP: Rev 07

    • 4 Nov 2026, 7:01 am · Christopher Wright

      @C.R Yes, QPS signage is required anytime QPS are managing signalised intersections.

    • 4 Nov 2026, 7:07 am · Christopher Wright

      This is GTG @Ethan Mathews closure point has been extended.

    • 4 Nov 2026, 9:20 am · Ethan Mathews

      @C.R Cleo could you please amend as per below in table 30 (Just do as internal amendment): Thank you, @Christopher Wright FYI

    • 4 Nov 2026, 9:28 am · C.R

      @Ethan Mathews all good with this one. TMP: Rev 07

  4. Hi Team!! Please save work here: TGS: Rev 07 TMP: Rev 07 Main Folder Link: Sora - 9-11 Thornton St, Surfers Paradise Instructions: Piling Rig / Tower Crane Install TGS to add QPS to the intersection of Surfers Paradise Blvd as per below RFI from Council: Please have the CTMP amended to include a section that talks about the piling rig removal and add in the dates applied for which was the 17th of November for 1 day with a maximum contingency date of 1 week through to the 24th. Furthermore, amend the LTR with new dates as well for the Piling Rig Removal. Thanks ~ Shaz

    • 30 Oct 2026, 12:11 pm · Riri D.

      Change of start date will now be 24th of November with 1 week contingency form then. Please also attach this NMP provided from OBX Constructions to be added into the CTMP as an appendix Thank you! NOISEM-1.PDF

    • 2 Nov 2026, 1:11 pm · Riri D.

      @C.R as per Ethan, the new dates will be 15th of Dec with 1 week contingency for tower crane install

    • 2 Nov 2026, 1:21 pm · C.R

      Hi @Riri D. , There were several dates mentioned above. Can you please confirm which start date to follow for Piling Rig Removal? Is it November 17 with 1 week contingency or November 24 with 1 week contingency?

    • 2 Nov 2026, 1:34 pm · Riri D.

      @C.R 24th of November with 1 week contingency for pilling rig

  5. Hi Plans folder: 4. Plans - CC06381 Suite: S1 - Construction & Development Save work here: Good Morning Team, May I please have an allocation loaded for a CTMP Amendment and Workzone TGS amendment for OBX Thornton St to note approval has been granted in principal for Saturday works from 6:30am to 10:30am with potential allowance to work until just after mid day 12:30pm. Please ensure discussion has been added into 8.1.2 regarding the Approval in principal for Saturday works and add in the snippit attached from site advising accordingly Please amend section 8.1.2, Appendix E and the change log to be adjusted accordingly Please have the amended Workzone Plan and CTMP rev'd up and saved below: TGS > Rev 06 TMP > Rev 06 Project location: Sora - 9-11 Thornton St, Surfers Paradise Attachment: SATURD~1.PDF Thank you! 🧡Kim

    • 27 Oct 2026, 12:55 pm · Christine Vilador

      @S.B for TMD review. 1x TGS Amendment CC06381-S1-6A-Work Zone Plan - Added Saturday hours. 1x TMP Amendment - Updated Sections 1.1, 1.2, 1.4, 6.1, 6.2.1, 8.1.2 and Appendix E to fit the Saturday hours. Folder Links: TGS - Rev 06 TMP - Rev 06

    • 28 Oct 2026, 3:16 pm · Riri D.

      @Christine Vilador please amend accordingly. TGS and CTMP amended to be 6:30am - 10:30am only for Saturdays instead of 12:30 please ASAP:

    • 28 Oct 2026, 3:49 pm · Christine Vilador

      @Riri D. amendment done, changed the 12:30 to 10:30. Please let me know if there is any further changes are required.

    • 2 Nov 2026, 1:01 pm · Christopher Wright

      @Christine Vilador Was this meant to be 10:30? This is in the rev 6 folder, i can't see anything in the rev 7 folder

    • 2 Nov 2026, 1:14 pm · Christine Vilador

      @Christopher Wright I only updated the TMP previously and missed uploading the updated TGS compilation and Appendix E. I've now uploaded all the updated files to the Rev 6 folder. Thanks!

    • 2 Nov 2026, 2:27 pm · Ethan Mathews

      Hi @Christine Vilador , was this supposed to be updated to be Rev 7 instead..?

    • 2 Nov 2026, 2:30 pm · Christine Vilador

      @Ethan Mathews this is for Rev 6, I believe Rev 7 has been allocated to another planner.

    • 3 Nov 2026, 2:00 pm · Ethan Mathews

      @Christine Vilador FYI, @Christopher Wright has reviewed this yesterday and advised GTG

  6. ✓ Invoice IV0025564 sent (14 Oct) - Clint 5xTGS Amendment 1xTMP Amendment Invoice IV0025564 - 9-11 Thornton St, Surfers Paradise.eml

  7. @Permits / @Lexi R / @Riri D. ACCOUNTS - Please invoice as per below: Accounts: 5xTGS Amendment 1xTMP Amendment

  8. Hi, Kindle see instructions below: Please save work here: Main Folder: Sora - 9-11 Thornton St, Surfers Paradise TGS > Rev 04 TMP > Rev 05 Instructions from Ethan: Hi Team, please see attached Mark up for OBX 9-11 Thornton St Job. May I please confirm who is available to complete the amendments to the whole TGS Suite as per this mark up. I will also attach all of the photos taken from site that I have used to put together this mark up. These are all long term signage that needs to be added and noted on every TGS in the suite. All TGS's will need to be re-harmonized as per these photos and mark ups. Please note that these are just additional signs that have not been added to the harmonization, all of the signage that is already harmonized with the other sites is already correct, we just need to add in signage as per the mark up if that makes sense? Please see attached and documents for the allocation. Please also add a note that they will be using a rubber kerb ramp along the entirety of their frontage as per below: ALL MARKUPS ARE FOUND HERE: Rev 04Fw_ (2).eml Fw_ 6.eml Fw_ (3).eml Fw_ .eml Fw_ 7.eml Fw_ 4.eml Fw_ 5.eml Fw_ photo.eml thanks thanks ~ clint

    • 14 Sep 2026, 3:00 pm · B.R

      Hi @Christopher Wright, This is uploaded and for review. Thank you! Folder Link: Sora - 9-11 Thornton St, Surfers Paradise Files: TGS > Rev 04 - CC06381-TGS-S1-Rev04.pdf TMP > Rev 05 - CC06381-CTMP-Rev05.pdf Accounts: 5xTGS Amendment - Harmonised long-term signs of adjacent worksites - CC06381-S1-1A/B to 5A/B 1xTMP Amendment

    • 15 Sep 2026, 8:07 am · Christopher Wright

      This appears to be GTG @Ethan Mathews

    • 16 Sep 2026, 7:12 am · Ethan Mathews

      Hi @B.R Apologies I didn't get around to giving you a call yesterday... Could you please amend each TGS to show all other signage in the area not relating to our site as covered, this is to avoid confusion on site and to assume that when our works are in place, all other sites signage will be covered and not active and when the other sites are active, the TMI on the day can liaise with those sites to understand what we need to cover or uncover to make sure nothing conflicts. If you need help understanding what I mean, please feel free to message me on teams or @Christopher Wright can also assist you with this. Thank you !

    • 16 Sep 2026, 1:17 pm · B.R

      HI @Christopher Wright, This is revised and for review. Kindly let me know if there are any changes. Thank you!

    • 17 Sep 2026, 1:21 pm · Christopher Wright

      This is GTG @Ethan Mathews

    • 17 Sep 2026, 2:34 pm · Ethan Mathews

      @Christopher Wright Thanks mate, plans sent to client for review.

  9. @Lexi R @Permits @Riri D. - This one will be a no charge as per Ethan, setting status to No Charge now.

06Every file and folder

345 files in 87 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved