← All projectsCC06516
Project portal · built 17 Nov 2026, 10:03 am AEST · With client

60 Sackville St Greenslopes

John England

What's new

Monday updates and SharePoint changes, newest first

Full update log
  • No Monday updates or file changes in the last two weeks.

Crompton Concepts prepares the traffic management for John England on this project at 60 Sackville St, Greenslopes, QLD. 1 Monday request is open; the most pressing is at the with client stage; 1 TGS suite on file (S1 Rev 00). On the permit boards: 2 permits in force and 0 in progress. Every file opens straight from SharePoint.

Client
John England
Crompton job
CC06516
Location
60 Sackville St, Greenslopes, QLD
LGA / authority
City of Brisbane
Project coordinator
K.R
Latest planner · TMD
Rudra Khadka · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
2 in force · 0 in progress
Last activity
28 Sep 2026
Files on SharePoint
23 in 12 folders

What needs attention now

  1. Issued, waiting on client: CC06516 - John England - 60 Sackville St Greenslopes. Required by 12 Aug 2026. Planner: Rudra Khadka · TMD: Christopher Wright

PPermits

2 permit lines on the Monday permit boards: 2 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Road
Team Neil · BCC Road Permits - Neil
BCC roadDate SpecificIn force
Done
26 Oct 2026 – 26 Nov 202628 Sep 2026
Footpath
Team Neil · BCC Footpath Applications - Neil
FootpathDate SpecificIn force
Done
26 Oct 2026 – 26 Nov 202628 Sep 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
S1TGSRev 0011 Aug 20261CC06516-TGS-S1-Rev00-60 Sackville Street.pdf

03Requests on Monday

1 request since 5 Aug 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06516 - John England - 60 Sackville St GreenslopesNew plansWith client
Client Review
5 Aug 202612 Aug 2026Rudra KhadkaChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • Rudra KhadkaPlanner
  • Christopher WrightTMD
  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. No Monday updates on this project's requests since late August.

06Every file and folder

23 files in 12 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved