Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active

Taringa Tricare - 52 Seven Oaks St

Rosenlund

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Rosenlund on this project at 52 Seven Oaks St, Taringa, QLD. No Monday request is open right now; the latest one closed recently; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 01). On the permit boards: 0 permits in force and 0 in progress. Every file opens straight from SharePoint.

Client
Rosenlund
Crompton job
CC06525
Location
52 Seven Oaks St, Taringa, QLD
LGA / authority
City of Brisbane
Project coordinator
K.R
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 0 in progress
Last activity
10 Nov 2026
Files on SharePoint
41 in 15 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Footpath
Team Neil · BCC Footpath Applications - Neil
FootpathDate SpecificExpired
Done
30 Sep 2026 – 30 Oct 202628 Sep 2026

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—CTMPRev 0031 Aug 20261(FULL) CC06525-CTMP-Rev00.pdf
—TMPRev 0031 Aug 20261(FULL) CC06525-TMP-Rev00.pdf
—RARev 0027 Aug 20261CC06525-RA-Rev00.pdf
—TIARev 0027 Aug 20261CC06525-TIA Report-Rev00.pdf
S1TGSRev 0129 Sep 20262CC06525-TGS-S1-Rev01.pdf

03Requests on Monday

1 request since 14 Aug 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06525 - Rosenlund - Taringa Tricare - 52 Seven Oaks StNew plansInvoiced
Invoiced
14 Aug 202620 Aug 2026

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Tim Fraser - - Directortim@rosenlund.com.au
  • invoicesadmin@rosenlund.com.au

Crompton Concepts

  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. IV0025171 as per QU5479 sent to client - Shaz 0409 Re RE Taringa Tricare Project.eml

  2. INVOICING NOTES Please invoice as per quote QU5479 Client Email for invoice and sending. Taringa Tricare Project.eml Quote QU5479 (1).pdf

  3. Hi @Neil Lancaster @K.R @Christopher Wright, For CC06525 - Rosenlund - Taringa Tricare - 52 Seven Oaks St, I've completed the TGS, TIA report, RA, and TMP following the recent comments provided by the client. It is now available for QS Review. Thank you. Accounts: 10xTGS 1xTIA 1xRA 1xOA 1xFull TMP Link: TGS: Rev 00 TMP: Rev00 It is now available for review. Thank you!

    • 28 Aug 2026, 9:11 am · Christopher Wright

      This is GTG @Neil Lancaster

    • 28 Aug 2026, 9:14 am · Neil Lancaster

      @ChristopherThanks mate!:)

    • 31 Aug 2026, 9:25 am · KB.R

      Hi @Neil Lancaster @Christopher Wright. As requested, I've removed the TC from TGS 6F. Updated TGS, TMP, and CTMP are all uploaded now. Thanks!

  4. Hi @Christopher Wright @Neil Lancaster @K.R, For CC06525 - Rosenlund - Taringa Tricare - 52 Seven Oaks St, I've tentatively uploaded the completed TGS, TIA report, and RA for this allocation. One thing to note there that for the TGS for footpath closure on Whitmore Street, pedestrian detour is not feasible as there are no available crossings near the area to direct it to the opposite footpath, which was the initial advise of Mark. What I did here is I did a lateral shift and had pedestrians directed to the shoulder of Whitmore Street. I'll try to upload the completed TMP later, if not, latest would be tomorrow morning. Thank you!

  5. Hi @K.R @Neil Lancaster @Christopher Wright, Hi team, I had a Teams discussion with @K.R yesterday about the list of confirmations for this allocation. Kerri mentioned that she was gonna confirm these questions with Mark but I haven't received a response about it since asking yesterday. All questions below are following the updated quote sent by Kerri yesterday. 1. What is the daily arrangement? 2. Where do they want to hold and release when trucks are nosing and reversing in in the second TGS? 3. For stormwater connection works, this was previously divided into two stages in which I've already made 2 TGSs as shown below (see snippets). Now that with the updated quote it shows it is divided into three stages with 1 road closure and two shuttle flow. Would you be able to provide a markup for each setup here so I know how it would be divided? First Stage Second Stage 4. For the last set of TGS on Whitmore St Service/Civil Connection Crossing, do we have a markup for this so we know the extent of the area they would be taking up? We do have a markup in this area, but this is only for ground retention/piling works & verge construction works. Could you please confirm?

    • 27 Aug 2026, 11:40 am · KB.R

      @K.R had sent additional instructions for this allocation from client.

    • 27 Aug 2026, 12:08 pm · KB.R

      Following client's comments, For 6F, what do they mean when peds put on the other side of the road? They will be redirected to the opposite footpath? There are no crossings available to have peds cross the other side if that's the case. Hence, I had them redirected to the road shoulder. See current road configuration with works below. For 8F, I think excavation would impede both bounds of Seven Oaks Street and Brasted Street as pipes based on the civil plans they have provided are within that area. I think their comment is for 9F (See snippet below). For this, will this now be configured as a half road closure? If that's the case, would you happen to know the depth of excavation of the works. This will be needed to determine if we can use bollards or a road safety barrier system is needed (See table below). With clearances, this would fall under <2.5m clearance. So if excavation exceeds…

  6. Starting this one today while waiting for URGENT!! CC06402-S1 - Rev 2 - Constructions Group - 11-13 Rosewood Ave, Broadbeach. Had this put on hold also last Friday to prioritise CC02659 - S1 - Rev 14 - Marquee Projects - 1297 Gold Coast Highway.

    • 18 Aug 2026, 10:00 am · KB.R

      Putting this on hold to work on CC06139 - S2 - Graya - 39 Jefferson Lane. Thank you.

    • 20 Aug 2026, 9:22 am · KB.R

      Will work on this one again as I had to prioritise URGENT!! CC06402-S1 - Rev 2 - Constructions Group - 11-13 Rosewood Ave, Broadbeach yesterday. Putting this up as requested info as Kerri will post additional updates regarding this allocation.

06Every file and folder

41 files in 15 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.