← All projectsCC06535
Project portal · built 17 Nov 2026, 10:03 am AEST · Recently active

13. Evergreen Ave and Pub Lane

Enprocon

What's new

Monday updates and SharePoint changes, newest first

Full update log
  • 21 Aug 2026, 9:03 amPermits on CC06535 - Enprocon - Evergreen Ave and Pub Lane: save work here: Plans CC06535 See quote inside plans folder, Approval for Evergreen Ave but not for pub lane just yet. Only 1x TGS approved. (no TMP) Client request: Could I please get a couple new TGS as per details below? Address: Opposite 61 Evergreen Ave,…

Crompton Concepts prepares the traffic management for Enprocon on this project at 61 Evergreen Ave, Loganlea, QLD. No Monday request is open right now; the latest one closed recently; 1 TGS suite on file (S1 Rev 00). Every file opens straight from SharePoint.

Client
Enprocon
Crompton job
CC06535
Location
61 Evergreen Ave, Loganlea, QLD
LGA / authority
City of Brisbane
Project coordinator
D.B
Latest planner · TMD
—
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
26 Aug 2026
Files on SharePoint
9 in 2 folders

What needs attention now

  1. Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

    Nothing filed for this yet.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
S1TGSRev 0025 Aug 20261CC06535-TGS-S1-Rev00 - Evergreen Ave, Loganlea.pdf

03Requests on Monday

1 request since 21 Aug 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06535 - Enprocon - Evergreen Ave and Pub LaneNew plansInvoiced
Invoiced
21 Aug 20261 Jan 1970

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • D.BProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 21 Aug 2026, 9:03 am · Permits · CC06535 - Enprocon - Evergreen Ave and Pub Lane

    save work here: Plans CC06535 See quote inside plans folder, Approval for Evergreen Ave but not for pub lane just yet. Only 1x TGS approved. (no TMP) Client request: Could I please get a couple new TGS as per details below? Address: Opposite 61 Evergreen Ave, Loganlea TGS: Option for Stop/go and shoulder closure (cones run along kerb invert) Location: 80m measurement below depicts the extents of the work required Description: Construction of footpath and parking bays Thanks - Shaz

    • 21 Aug 2026, 9:46 am · D.B

      Hi Planner, client wants shoulder closure on the main TGS with an insert of hold and release. if possible please.

    • 25 Aug 2026, 8:28 am · D.B

      @A.B please write comments on monday. Continue with shoulder closure, with hold and release. low suburbs can get away with 2.5m of road width each lane.

    • 25 Aug 2026, 8:29 am · D.B

      show on plans 2.5m each lane with cones on shoulder, that way we have done the drawing correct, if the client needs any amendments they will come back to us.

    • 25 Aug 2026, 1:40 pm · A.B

      Hi @D.B thanks so much for this. Hi @Chris, uploaded the shoulder closure TGS with insert for hold and release option. For pedestrians, Declan advised that Enprocon will be managing pedestrian movements with no peds route on plans. Thank you! Accounts: x1 TGS

    • 26 Aug 2026, 12:00 pm · Christopher Wright

      This is GTG @D.B

06Every file and folder

9 files in 2 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved