The Lanes Blvd Mermaid Waters
Hutchinson Builders
What's new
- 11 Nov 20261 file saved on SharePoint: TRAFFIC CONTROL BOOKING FORM.docx
- 4 Nov 20262 files saved on SharePoint: Quote QU5785.pdf, Signage Cost.pdf
- 3 Nov 20262 files saved on SharePoint: CC06540-S1-TGS-Rev05.pdf, CC06540-S1-TGS-Rev05.tcp
- 2 Nov 2026, 11:14 amPermits on CC06540-S1 - Rev 5 - Hutchinson Builders - The Lanes Blvd Mermaid Waters: Hi team, Kindly see instructions provided by @Aisha: "TGS Amendment allocation - The Lanes, Hutchinson Builders. the two spotters standing within the building, can we please specify that they will be labourers supplied by Hutchinson. can we remove the 2…
- 28 Oct 2026, 3:21 pmPermits on CC06540-S1 - Rev 4 - Hutchinson Builders - The Lanes Blvd Mermaid Waters: Hi Team! Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 04 Project location: The Lanes Blvd Mermaid Waters Quote: none Request type: Amendment Scope: TGS only new TGS amendment please - for the lanes - Hutchinson builders Can we please…
- 23 Oct 2026, 10:02 amSandy on CC06540-S1 - Rev 3 - Hutchinson Builders - The Lanes Blvd Mermaid Waters: Hi Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 03 TMP > Rev 02 Project location: The Lanes Blvd Mermaid Waters Quote: none As discussed, markup/amendments for our TGS Tower Crane Install- Key Notes * Tower 1 & 2 Main Entries closed. *…
Crompton Concepts prepares the traffic management for Hutchinson Builders on this project at 5 The Lanes Boulevard, Mermaid Waters, Queensland 4218, Mermaid Beach, QLD. 5 Monday requests are open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 05). Monday holds 6 requests for this job (1 new, 5 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06540
- MondayCC06540-S1 - Rev 5 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
- MondayCC06540-S1 - Rev 4 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
- MondayCC06540-S1 - Rev 3 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
- Client
- Hutchinson Builders
- Crompton job
- CC06540
- Location
- 5 The Lanes Boulevard, Mermaid Waters, Queensland 4218, Mermaid Beach, QLD
- LGA / authority
- City of Gold Coast
- Project coordinator
- C.C
- Latest planner · TMD
- Marie Est · S.B
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- None on the permit boards
- Last activity
- 11 Nov 2026
- Files on SharePoint
- 69 in 60 folders
What needs attention now
- Issued, waiting on client: CC06540-S1 - Rev 1 - Hutchinson Builders - The Lanes Blvd Mermaid Waters. Required by 23 Sep 2026. Planner: R.R · TMD: Christopher Wright · Last note (23 Sep 2026, Riri D.): “Plans sent to client - Re_ Lanes Mermaid Waters Projects.eml”
- Urgent Issued, waiting on client: CC06540-S1 - Rev 2 - Hutchinson Builders - The Lanes Blvd Mermaid Waters. Required by 10 Oct 2026. Planner: Michelle Sayson · TMD: Andrew Bryers · Last note (19 Oct 2026, Michelle Sayson): “TGS Amendments: - Additional carpark for tenants and residents (ALL TGS) - 1 x Additonal TGS for Boardwalk Pedestrian Users (TGS 5)”
- Issued, waiting on client: CC06540-S1 - Rev 3 - Hutchinson Builders - The Lanes Blvd Mermaid Waters. Required by 25 Oct 2026. Planner: Christine Vilador · TMD: Christopher Wright · Last note (23 Oct 2026, Sandy): “Hi Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 03 TMP > Rev 02 Project location: The Lanes Blvd Mermaid Waters Quote: none As discussed, markup/amendments…”
- Issued, waiting on client: CC06540-S1 - Rev 4 - Hutchinson Builders - The Lanes Blvd Mermaid Waters. Required by 30 Oct 2026. Planner: J.G · TMD: Christopher Wright · Last note (28 Oct 2026, Permits): “Hi Team! Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 04 Project location: The Lanes Blvd Mermaid Waters Quote: none Request type: Amendment Scope: TGS…”
- Issued, waiting on client: CC06540-S1 - Rev 5 - Hutchinson Builders - The Lanes Blvd Mermaid Waters. Required by 4 Nov 2026. Planner: Marie Est · TMD: S.B · Last note (2 Nov 2026, Permits): “Hi team, Kindly see instructions provided by @Aisha: "TGS Amendment allocation - The Lanes, Hutchinson Builders. the two spotters standing within the building, can we please…”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06540-CTMP-Rev01.pdfCTMP Rev 01 · 22 Sep 2026
- PDF7012575 - Cromptons Wo.pdf25 Aug 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLRE_ Lanes Mermaid Waters Projects23 Oct 2026
- EMLFw_ Lanes Mermaid Waters Projects18 Sep 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 22 Sep 2026 | 2 | CC06540-CTMP-Rev01.pdf |
| — | TMP | Rev 02 | 23 Oct 2026 | 3 | CC06540-TMP-Rev02.pdf |
| — | TIA | Rev 00 | 3 Sep 2026 | 1 | TIA Report - CC06540.pdf |
| S1 | TGS | Rev 05 | 3 Nov 2026 | 6 | CC06540-S1-TGS-Rev05.pdf |
03Requests on Monday
6 requests since 25 Aug 2026: 1 for new plans and 5 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06540-S1 - Rev 5 - Hutchinson Builders - The Lanes Blvd Mermaid Waters | Amendment | S1 | Rev 05 | With client Client review | 2 Nov 2026 | 4 Nov 2026 | Marie Est | S.B |
| CC06540-S1 - Rev 4 - Hutchinson Builders - The Lanes Blvd Mermaid Waters | Amendment | S1 | Rev 04 | With client Client review | 28 Oct 2026 | 30 Oct 2026 | J.G | Christopher Wright |
| CC06540-S1 - Rev 3 - Hutchinson Builders - The Lanes Blvd Mermaid Waters | Amendment | S1 | Rev 03 | With client Client review | 23 Oct 2026 | 25 Oct 2026 | Christine Vilador | Christopher Wright |
| CC06540-S1 - Rev 2 - Hutchinson Builders - The Lanes Blvd Mermaid Waters Urgent | Amendment | S1 | Rev 02 | With client Client review | 8 Oct 2026 | 10 Oct 2026 | Michelle Sayson | Andrew Bryers |
| CC06540-S1 - Rev 1 - Hutchinson Builders - The Lanes Blvd Mermaid Waters | Amendment | S1 | Rev 01 | With client Client review | 21 Sep 2026 | 23 Sep 2026 | R.R | Christopher Wright |
| CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters | New plans | Invoiced Invoiced | 25 Aug 2026 | 28 Aug 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Client / site
- Ben.Stewart@hutchinsonbuilders.com.auBen.Stewart@hutchinsonbuilders.com.au
- Charlie.Seaman@hutchinsonbuilders.com.auCharlie.Seaman@hutchinsonbuilders.com.au
- Maddison.Moss@hutchinsonbuilders.com.auMaddison.Moss@hutchinsonbuilders.com.au
Crompton Concepts
- Marie EstPlanner
- S.BTMD
- J.GPlanner
- Christopher WrightTMD
- Christine ViladorPlanner
- Michelle SaysonPlanner
- Andrew BryersTMD
- R.RPlanner
- C.CProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 2 Nov 2026, 11:14 am · Permits · CC06540-S1 - Rev 5 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Hi team, Kindly see instructions provided by @Aisha: "TGS Amendment allocation - The Lanes, Hutchinson Builders. the two spotters standing within the building, can we please specify that they will be labourers supplied by Hutchinson. can we remove the 2 traffic controllers within the site compound, closest to the JIB as the site will be closed off to locals, and will n=be no need to direct anyone. can we remove the traffic controller sitting on the footpath, next to the green work area that is to assist pedestrians and cars affected by the road closure. as all local traffic will be closed off, and Jib will be in the way for any one to access" Kindly save work here: TGS > Rev 05 Main Folder Link: The Lanes Blvd Mermaid Waters Any questions, kindly liaise with @Riri D. , or directly to @Aisha thanks thanks ~ clint
- 2 Nov 2026, 1:22 pm · Marie Est
Hello @Riri D. and @Aisha Waver, May I ask which specific TGS they are asking for amendment, is it also for CC06540-S1-2D (Tower Crane Installation & Dismantling)? Thank you.
- 2 Nov 2026, 1:24 pm · Aisha Waver
yes correct :)
- 2 Nov 2026, 1:55 pm · Marie Est
Hello @S.B , The TGS S1 has already been amended and uploaded to the folder. Please review it at your convenience. * 1x TGS Amendment on S1 - CC06540-S1-2D - Rev 5 - Removal of TC and additional note. Link: TGS - https://cromptonconcepts.sharepoint.com/:f:/g/IgC4Qf9tRGoJR7b4Ya80N9M0AdqQbKMze6flNTPtJBEb1AQ?e=SwTv... Thank you.
- 2 Nov 2026, 2:40 pm · Riri D.
@Marie Est We removed the TC that was sitting here, can we please put him back, to allow remove cones to allow entry and exit of residents. Thanks!
- 2 Nov 2026, 3:51 pm · Marie Est
Hello @S.B, The TGS S1 Internal Amendment has already been done and uploaded to the folder. Please review it at your convenience. * 1x TGS Amendment on S1 - CC06540-S1-2D - Rev 5 - Putting all the TC back for Residents entry and exit. Link: TGS - https://cromptonconcepts.sharepoint.com/:f:/g/IgC4Qf9tRGoJR7b4Ya80N9M0AdqQbKMze6flNTPtJBEb1AQ?e=SwTv... Thank you.
- 2 Nov 2026, 1:22 pm · Marie Est
- 28 Oct 2026, 3:21 pm · Permits · CC06540-S1 - Rev 4 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Hi Team! Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 04 Project location: The Lanes Blvd Mermaid Waters Quote: none Request type: Amendment Scope: TGS only new TGS amendment please - for the lanes - Hutchinson builders Can we please remove the purple line as pedestrian access wont be maintained during the tower crane. the TC at the top of the driveway, text box needs to be changed and clarify that he is to assist NDIS persons returning back into tower 2 the TC floating in tower 1 (tower closest to the roundabout) text box needs to change and state they are assisting residents to the fire escape down to the basement/carpark. Can we also please make a comment on the TGS that we will have a Traffic controller at arena gates (not on the map) to assist with the trucks entry and exit through the arena site to Hutchinson site. Thanks ~ Shaz
- 28 Oct 2026, 5:05 pm · J.G
Hi @Aisha, about this comment: Can we please remove the purple line as pedestrian access wont be maintained during the tower crane. Should we change the pedestrian diversion to this using existing crossing points/driveway: Let me know. Thank you
- 29 Oct 2026, 1:01 pm · Riri D.
@J.G spoke to Aisha please proceed
- 29 Oct 2026, 1:35 pm · J.G
@S.B For review. Thank you TGS > Rev 04 Account: 1x TGS Amendment (TGS 2D) -Changed pedestrian diversion per confirmation above -updated TC notes and added #7 in Notes box Also updated title blocks for missing Designer name and date for amendment. Thank you
- 30 Oct 2026, 10:31 am · Christopher Wright
This is GTG @Aisha Waver
- 28 Oct 2026, 5:05 pm · J.G
- 23 Oct 2026, 10:02 am · Sandy · CC06540-S1 - Rev 3 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Hi Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 03 TMP > Rev 02 Project location: The Lanes Blvd Mermaid Waters Quote: none As discussed, markup/amendments for our TGS Tower Crane Install- Key Notes * Tower 1 & 2 Main Entries closed. * Alternate route for all residents will be via the B1 North/East Fire Escape adjacent the B1 Driveway. The Fire door has an alarm on it, which is not connected to the FIP. Building Management can/will have to disarm. * Due to stairs from the B1Fire escape to Level 1 (Ground) dedicated spotter/s will need to be placed within the Tower 2 Level 1 Foyer and Level 1 (Ground) B1 Fire Escape entry and exit location to assist NDIS persons to access/ egress as required. * Abedian to access/egress South side of Building to the Boardwalk. * Units Tower 1, Level 10, 04 & Tower 2 Level 12 02 will have to vacate the building as per HCH Lift Plan. * The Building Alternate Emergency Route will still be available through the B1 - B2 Southern Fire Escape. Could we also please book Traffic Control in for this TGS implementation for the 4, 5 & 6/11/26 for a 6am start? *Weather depending Can we also amend the current tower crane install/dismantle TGS and close of the temporary residents carpark FW_ Tower Crane Install Exclusion Zone & Residents Alternate Route (1).eml
- 23 Oct 2026, 2:48 pm · Christine Vilador
@Christopher Wright for TMD review. * 1x TGS Amendment CC06540-S1-2D - Updated tower crane exclusion zone, resident access arrangements, main entrance and temporary carpark closures, and additional spotters at Tower 2 Level 1 foyer and B1 Fire Escape. * 1x TMP Amendment – Updated Section 2.3 to reflect the revised tower crane exclusion zone and resident access arrangements. TGS - Rev 03 TMP - Rev 02
- 28 Oct 2026, 1:27 pm · Christopher Wright
This is GTG @Aisha Waver
- 23 Oct 2026, 2:48 pm · Christine Vilador
- 19 Oct 2026, 10:09 am · Michelle Sayson · CC06540-S1 - Rev 2 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
TGS Amendments: - Additional carpark for tenants and residents (ALL TGS) - 1 x Additonal TGS for Boardwalk Pedestrian Users (TGS 5)
- 8 Oct 2026, 12:20 pm · Sandy · CC06540-S1 - Rev 2 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Hi @Lenny Salugao Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 02 Project location: The Lanes Blvd Mermaid Waters Quote: N/A Request type: Amendment Scope: TGS Specific operations: Please see attached email TGS to amend: TGS number Client mark-ups/attachments: Any specific files the planner needs to refer to?
- 8 Oct 2026, 12:53 pm · Riri D.
Hi @Lenny Salugao, let me know if you have any question. Also, you may check the previous revision in case you needed reference too. THanks!
- 12 Oct 2026, 1:06 pm · Riri D.
Hi @Michelle, reallocating this over to you as a matter of urgency. THanks!
- 12 Oct 2026, 3:22 pm · Michelle Sayson
@Sandy @Riri D. Can you please upload the MAP attachment that the client is referring on their email above. Thanks
- 12 Oct 2026, 4:24 pm · Riri D.
@Michelle SaysonThe Lanes GRC_Overall evac paths.pdf
- 12 Oct 2026, 6:32 pm · Michelle Sayson
Hi @Riri D. Amended TGS CC06540-S1-TGS-Rev02.pdf Uploaded on TGS > Rev 02
- 8 Oct 2026, 12:53 pm · Riri D.
- 23 Sep 2026, 2:07 pm · Riri D. · CC06540-S1 - Rev 1 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Plans sent to client - Re_ Lanes Mermaid Waters Projects.eml
- 21 Sep 2026, 10:52 am · Permits · CC06540-S1 - Rev 1 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Hi, Plans folder:Plans - CC06540 Suite: S1 Save work here: TGS >Rev 02 Project location:The Lanes Blvd Mermaid Waters Additional TGS and amendments as per clients mark ups - Rev 02 everything is saved in this folder, please also update CTMP. TMP TGS -Karein (2109)
- 21 Sep 2026, 5:22 pm · R.R
Hi @Permits , I believe the files in the Rev 2 folder may be duplicates of those in Rev 1. This could still be for Rev 1. Kindly confirm. Thank you.
- 21 Sep 2026, 8:52 pm · Riri D.
@R.R saved this in Rev 01 please thanks
- 22 Sep 2026, 9:00 am · R.R
Hi @A.A @C.C , TGS 2 & 3 amended. TGS 4 added as well. Thank you. TGS: Sharepoint - Documents - Rev 01 - All Documents TMP: Sharepoint - Rev 01 - All DocumentsAccounts: 2x TGS amendments 1x TGS add'l TMP amendment
- 22 Sep 2026, 11:10 am · Christopher Wright
This is GTG @C.C
- 21 Sep 2026, 5:22 pm · R.R
- 11 Sep 2026, 3:01 pm · Sandy · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
✓ IV0025246 - draft CC06540-S1-1A/B/C Options Analysis & Risk Assessment / Drive-In / Drive-Out - Daily Arrangement (Lakeside Drive - Truck Access Management) CC06540-S1-2A/B/C/D Options Analysis & Risk Assessment / Tower Crane Installation (Lakeside Drive - Full Road Closure) CC06540-S1-3A/B/C Options Analysis & Risk Assessment / Eastern Elevation Installation/Removal (Lakeside Drive - Hold & Release) 1x mini TMP 1x TIA 1x RA
- 10 Sep 2026, 6:28 pm · Riri D. · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Chelsea team catch up 10-09-26.pdf Invoice as per quote QU-5514 but make sure its 3x TGS CC06540-S1-1A/B/C Options Analysis & Risk Assessment / Drive-In / Drive-Out - Daily Arrangement (Lakeside Drive - Truck Access Management) CC06540-S1-2A/B/C/D Options Analysis & Risk Assessment / Tower Crane Installation (Lakeside Drive - Full Road Closure) CC06540-S1-3A/B/C Options Analysis & Risk Assessment / Eastern Elevation Installation/Removal (Lakeside Drive - Hold & Release) 1x mini TMP
- 8 Sep 2026, 6:38 pm · Riri D. · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Plans sent to client - Re_ Lanes Mermaid Waters Projects.eml
- 8 Sep 2026, 10:21 am · A.A · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
@C.C GTG
- 7 Sep 2026, 3:44 pm · C.C · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
@Riri D. I have sent this to the client as they have been requesting this for ages.
- 4 Sep 2026, 7:04 am · A.A · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
@B.R Please amend as attached. CC06540-S1-TGS-Rev00.pdf
- 4 Sep 2026, 11:43 am · B.R
Hi @A.A, This is revised and for your review. Thank you!
- 4 Sep 2026, 11:43 am · B.R
- 25 Aug 2026, 5:17 pm · Permits · CC06540 - Hutchinson Builders - The Lanes Blvd Mermaid Waters
Plans folder: Plans - CC06540 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: The Lanes Blvd Mermaid Waters Quote: QU5514 Request type: New Scope: TGS & TMP Client mark-ups/attachments: see attached quote QU5514 and email markup request for reference (teams Chelsea if needed) Quote QU5514 - Planning Quote.pdf RE_ Lanes Mermaid Waters Projects.eml thanks - shaz
- 26 Aug 2026, 1:56 pm · B.R
Hi @C.C, following our teams, 1. There are 2 projects mentioned in the email, with addresses 2 & 5 – The Lanes Blvd, Mermaid Waters. Confirming if these are going to be the 2 TGSs, with one TGS for each address. (photo below) 2. Since both are for the drive-in/out of trucks, could I also ask for the driveway markup for each TGS just to make sure we have the correct access for each one? Thank you! 3. Can I ask for this info to include in the mini TMP, as well. thanks! For both TGS/activities - -Start Date -Duration -Frequency -Expected No. of Construction Vehicles per Shift -Type of Vehicles
- 26 Aug 2026, 2:33 pm · Riri D.
@B.R I think @C.C mentioned its only for Project 1: The Lanes Blvd Mermaid Waters
- 26 Aug 2026, 3:04 pm · B.R
@Riri D. Thanks for this, since there are 2 TGS for Driving in/out, can I request for markup ups on these, as well as for the items on number 3? Thank you :)
- 27 Aug 2026, 11:59 am · Riri D.
@B.R asked the site for #2 & #3 :)
- 31 Aug 2026, 5:32 pm · B.R
Hi @Riri D., just wanted to follow up on this. Thanks!
- 1 Sep 2026, 1:01 pm · Riri D.
@B.RRE_ Lanes Mermaid Waters Projects.eml
- 3 Sep 2026, 3:00 pm · B.R
Hi @A.A, This is uploaded and for review. TGSs are based on the markups given above. Thank you! Folder Link: S1 Files: TGS > Rev 00 - CC06540-S1-TGS-Rev00.pdf TMP > Rev 00 - CC06540-CTMP-Rev00.pdf Accounts: 3xTGS - CC06540-S1-1A/B/C - Drive-In / Drive-Out - Daily Arrangement - CC06540-S1-2A/B/C/D - Tower Crane Installation - CC06540-S1-3A/B/C - Eastern Elevation Installation/Removal 1xMini TMP 1xTIA 1xRA