← All projectsCC06556
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD approved

38 Seaworld Drive, Main Beach

BDCM

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for BDCM on this project at 38 Seaworld Drive, Main Beach. 1 Monday request is open; the most pressing is at the TMD approved stage; the current CTMP on SharePoint is Rev 01; 2 TGS suites on file (General Rev 00, S1 Rev 02). On the permit boards: 0 permits in force and 1 in progress. Every file opens straight from SharePoint.

Client
BDCM
Crompton job
CC06556
Location
38 Seaworld Drive, Main Beach
LGA / authority
—
Project coordinator
K.R
Latest planner · TMD
J.R · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 1 in progress
Last activity
5 Nov 2026
Files on SharePoint
75 in 19 folders

What needs attention now

  1. TMD approved, ready to issue: CC06556 - BDCM - 38 Seaworld Drive, Main Beach. Required by 30 Sep 2026 (overdue). Planner: J.R · TMD: Christopher Wright · Last note (3 Nov 2026, J.R): “Hi @Christopher Wright @Neil Lancaster for review per meeting with mark. TGS: Rev02 CTMP: Rev01 Change log: Amendment Section Date Updated TGS 1 and TGS 3 to reflect works zone at…”
  2. Permit in progress: OPW – Pedestrian Refuge Island (CMP / LONO) is FEE PAID.

PPermits

1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
OPW – Pedestrian Refuge Island
Team Neil · BCC CMP Lodgement / GCCC LONO Lodgement
CMP / LONOOngoingIn progress
FEE PAID

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

1 request since 25 Sep 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06556 - BDCM - 38 Seaworld Drive, Main BeachNew plansTMD approved
TMD Approved
25 Sep 202630 Sep 2026J.RChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Client / site

  • Todd Whitetwhite@bdcm.com.au

Crompton Concepts

  • J.RPlanner
  • Christopher WrightTMD
  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi @Christopher Wright @Neil Lancaster for review per meeting with mark. TGS: Rev02 CTMP: Rev01 Change log: Amendment Section Date Updated TGS 1 and TGS 3 to reflect works zone at site frontage; revised TGS 2 pedestrian management with footpath reinstatement after hours and updated Option Analysis/ Risk Assessment; removed additional TC from TGS 7. 7.2, 8.2, 8.3, 8.4, 8.5, Appendix B, Appendix C 03/11/2026 Accounts: 4x TGS amendments 1x CTMP amendment 1x DRA amendment

    • 4 Nov 2026, 12:31 pm · Christopher Wright

      This is GTG @Neil Lancaster

  2. 23 Oct 2026, 3:15 pm · Riri D. · CC06556 - BDCM - 38 Seaworld Drive, Main Beach

    Sent to Mark directly File.eml

  3. 25 Sep 2026, 3:25 pm · Permits · CC06556 - BDCM - 38 Seaworld Drive, Main Beach

    Hi @J.R , Please see markups and save work here: Main Folder Link: 38 Seaworld Drive, Main Beach TGS > Rev 00 As noted by @K.R : "Mark's mark up mentions the Multiplex Pedestrian Refuge, This is the drawings for the location." Seaworld Drive - Mark Ups from Mark.eml 23-087-10A.1 [SET].pdf Any questions, please liaise with @Riri D. thanks thanks ~ clint

    • 28 Sep 2026, 9:24 am · J.R

      Hi @Neiland @K.R, good morning! Just to follow-up on the approved Quote and additional instructions (if any) to proceed with this project. May I also request the long‑term signage installed along Seaworld Drive for the nearby 'Mantaray Development' project, should there be a need to harmonize our proposed signage with theirs. Thank you!

    • 28 Sep 2026, 10:10 am · K.R

      @J.R CC03590-S2-TGS - Rev 2 -The Mantaray - Lot 503, Sea World Dr, Main Beach.pdf This was the TGS that was quoted for the signage. Crompton did not install but this should be roughly what is out there. I am trying to get a hold of the TC company that is looking after it. I will get them to confirm today. Neil has also tried to follow up with their team for the information.

    • 28 Sep 2026, 10:39 am · J.R

      Thank you so much, Kerri @K.R. Kindly advise if the planning quote is already made/ approved.

    • 29 Sep 2026, 3:59 pm · J.R

      Hi @K.R I've completed the draft TGS for this project per mark-up. The file is now available in the folder. Thank you! Pending: - approved Quote - client contact person - works zone pin spots as GCCC requirement

    • 29 Sep 2026, 4:01 pm · K.R

      @J.R @Neil Lancaster - Neil will have an additional TGS requirement and mark up from our meeting today. I will get him to add to Monday for you. We are also still waiting on information from the client to fialise the TMP information sheet

    • 30 Sep 2026, 9:41 am · J.R

      Hi @Neil Lancaster, I would like to follow-up on this one please. Thank you!

    • 30 Sep 2026, 2:11 pm · Neil Lancaster

      @J.R @K.R We are still waiting on the client to provide the info. I will follow up with them today.

    • 30 Sep 2026, 4:53 pm · Neil Lancaster

      Hi Jenesis, @J.R @K.G The footpath detour on the TGS is incorrect, it needs to be up around the roundabout to the north. Please can you revise the plans? :) Any question, please reach out.

    • 1 Oct 2026, 11:15 am · J.R

      Hi @Neil Lancaster Can i please have the name, position, number and email of the client contact person for the TGS? Thank you!

    • 1 Oct 2026, 12:30 pm · J.R

      @Neil Lancaster the detour route on the TGS has been updated. Thanks!

    • 2 Oct 2026, 8:16 am · Neil Lancaster

      @J.R Thank you!

    • 6 Oct 2026, 11:22 am · Neil Lancaster

      @J.R Hey Jenesis, Can I please get an update on the TMP for this. I cant locate it anywhere. Thanks in advance, Neil.

    • 6 Oct 2026, 11:37 am · J.R

      Hi @Neil, the TMP is not yet available because I'm still waiting for the approved Quote and TMP info from client (client contact info/ site reps etc/ duration of work etc.) mentioned by Kerri to create the TMP. So far i only based the creation of TGS per mark's mark-up and not on an approved quote. Please refer to this format TMP Information Form.docx to be filled by the client. Thank you.

    • 15 Oct 2026, 10:10 am · J.R

      @Riri D. this is for another project '15 Sunrise Blvd, Surfers Paradise', thus will not help me with the TMP creation for this project. Kindly double check before uploading. FYI @K.R, thank you!

    • 16 Oct 2026, 1:43 pm · Riri D.

      @J.R my bad it was put into the wrong allocation. I will delete it to avoid confusion and checking for this project TMP details.

    • 16 Oct 2026, 1:57 pm · Riri D.

      Hi @J.R, just following up on the TMP details - Mark will send it to you. Could you please let me know the expected turnaround time when you get a chance? Once it's ready, please give me a heads-up so I can send it through to Mark. Thanks heaps!

    • 16 Oct 2026, 2:31 pm · J.R

      @Riri D. do we have an ETA on the TMP details from Mark?

    • 16 Oct 2026, 2:37 pm · J.R

      Pending infos are: - Filled TMP information form - Works zone spot marks c/o steve - site layout plan

    • 19 Oct 2026, 3:47 pm · J.R

      Hi @Christopher Wright, the TGS file is now available for review. CTMP to be follow once information from client is received. Thanks! TGS accounts: 9x TGS - TGS 1-9 per Site activities and inactive period per meeting with Mark 1x Works Zone Plan Gold Coast - TGS 10 1x Long-term Signage Plan - TGS 11 (per daily arrangement set-up)

    • 19 Oct 2026, 3:48 pm · J.R

      FYI @K.R @Neilthanks!

    • 20 Oct 2026, 12:40 pm · Christopher Wright

      This appears to be GTG @Neil Lancaster

    • 26 Oct 2026, 10:33 am · J.R

      Hi @Christopher Wright the CTMP and updated TGS are now available for review. The TGS file and works zone separate file were updated to reflect the updated works zone schedule provided by the client (6:30AM-6:30PM MON-SAT). CTMP: Rev0 TGS: Rev01

    • 27 Oct 2026, 12:19 pm · Christopher Wright

      Hi @J.R Can you please review the changes in the rapid file and amend please.

    • 30 Oct 2026, 9:53 am · Christopher Wright

      Morning @J.R Can you complete this asap please.

    • 30 Oct 2026, 9:54 am · J.R

      @Christopher Wright working on it now. I'm sorry I was on sick leave yesterday.

    • 30 Oct 2026, 9:55 am · Christopher Wright

      @J.R No worries, I hope you are feeling better today.

    • 30 Oct 2026, 10:54 am · J.R

      @Christopher Wright the TGS and CTMP are now updated. Thank you! CTMP: Rev0 TGS: Rev01

    • 30 Oct 2026, 11:20 am · Christopher Wright

      @J.R Thank you. @Neil Lancaster this is GTG

06Every file and folder

75 files in 19 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved