1 Clarke St, Southport
Azure
What's new
- 16 Nov 2026, 3:45 pmS.B on CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport: Hi Rudra and Aisha, I've checked the current CC06563-TGS-S1-Rev06.pdf in the Rev 06 folder. Thanks for putting the numbering back: 9C/D (Plan 6 contingency) and 10C/D (Plan 7) now match what Council has in the CTMP, and Plan 5 (8A–8E) is back with the Rev 6…
- 16 Nov 202614 files saved on SharePoint: CC06563-TMP-Rev07.pdf, CC06563-CTMP-Rev07.pdf, TMP Risk Report - 1 Clarke St, Southport.pdf, CC06563-TMP-Rev07.docx and 10 more
- 14 Nov 20264 files saved on SharePoint: CRM 1838059 _ LONO - 1 Clarke Street, Southport.eml, Untitled_Project_TGS_Risk_Sheet_Page2.png, Untitled_Project_TGS_Risk_Sheet_Page1.png, RE_ CRM 1838059 _ LONO - 1 Clarke Street, Southport.eml
- 13 Nov 20262 files saved on SharePoint: options_analysis.png, CRM - 1838059 - LONO - 1 Clarke Street, Southport EML.eml
- 12 Nov 2026, 3:56 pmRica Panganiban on CC06563 - Azure - 1 Clarke St, Southport: IV0025967 - drafted - Rica
- 12 Nov 20261 file saved on SharePoint: CC06563-TMP-Rev05.docx
Crompton Concepts prepares the traffic management for Azure on this project at 1 Clarke St, Southport, QLD. 6 Monday requests are open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 07; 1 TGS suite on file (S1 Rev 07). On the permit boards: 0 permits in force and 3 in progress. Monday holds 8 requests for this job (1 new, 7 amendments); all of them are on this page. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder1. Plans - CC06563
- MondayCC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport
- MondayCC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport
- MondayCC06563-TMP - Rev 5 - Azure - 1 Clarke St, Southport
- Client
- Azure
- Crompton job
- CC06563
- Location
- 1 Clarke St, Southport, QLD
- LGA / authority
- —
- Project coordinator
- Aisha Waver
- Latest planner · TMD
- Rudra Khadka · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- 0 in force · 3 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 136 in 35 folders
What needs attention now
- Review comments to action: CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport. Required by 7 Nov 2026 (overdue). Planner: Rudra Khadka · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi Rudra and Aisha, I've checked the current CC06563-TGS-S1-Rev06.pdf in the Rev 06 folder. Thanks for putting the numbering back: 9C/D (Plan 6 contingency) and 10C/D (Plan 7) now…”
- Issued, waiting on client: CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport. Required by 16 Oct 2026. Planner: J.G · TMD: Christopher Wright · Last note (16 Oct 2026, Riri D.): “Sent to client Re_ TGS Amendment - 1 Clarke St.eml”
- Issued, waiting on client: CC06563-S1 - Rev 2 - Azure - 1 Clarke St, Southport. Required by 21 Oct 2026. Planner: Rudra Khadka · TMD: Christopher Wright · Last note (20 Oct 2026, Riri D.): “Sent to client Re_ TGS Amendment - 1 Clarke St.eml”
- Issued, waiting on client: CC06563-TMP - Rev 5 - Azure - 1 Clarke St, Southport. Required by 4 Nov 2026. Planner: Christine Vilador · TMD: S.B · Last note (2 Nov 2026, Christine Vilador): “@S.B for TMD review. 1x TMD amendment - updated Sections 6.1 and 6.2.1 to reflect Monday–Friday working hours (6:30 AM–6:30 PM), and clarified pedestrian arrangements for Plans 6…”
- Urgent Issued, waiting on client: CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport. Required by 6 Nov 2026. Planner: KB.R · TMD: Christopher Wright · Last note (4 Nov 2026, KB.R): “Hi @Aisha Waver @Christopher Wright, For URGENT!! CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport, I've amended the TMP following client's confirmation: can we please…”
- Complete, to be invoiced: CC06563 - Azure - 1 Clarke St, Southport. Required by 8 Oct 2026. · Last note (12 Nov 2026, Rica Panganiban): “IV0025967 - drafted - Rica”
- Permit in progress: TCP (TMR) is TMR Pending. Follow up 12 Nov 2026. Wanted from 12 Nov 2026.
- Permit in progress: Hold and Release: Operational Permit (Gold Coast) is Initial Pending. Follow up 24 Nov 2026. Wanted from 1 Dec 2026.
- Permit in progress: LONO Application (CMP / LONO) is Council Pending.
PPermits
3 permit lines on the Monday permit boards: 0 in force, 3 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| Hold and Release: Operational Permit Team Aisha · Gold Coast Permits - Aisha | Gold Coast | Ongoing | In progress Initial Pending | 1 Dec 2026 – 1 Mar 2027 | 10 Nov 2026 | 24 Nov 2026 | 18 Jan 2027 | |
| TCP Team Aisha · TMR Permits - Aisha | TMR | Ongoing | In progress TMR Pending | 12 Nov 2026 – 28 Aug 2027 | 10 Nov 2026 | 12 Nov 2026 | 12 Nov 2026 | |
| LONO Application Team Aisha · BCC CMP Lodgment / GCCC LONO lodgment | CMP / LONO | In progress Council Pending |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06563-CTMP-Rev07.pdfCTMP Rev 07 · 16 Nov 2026
- PDFCC06563-Site Plan.pdf14 Oct 2026
- PDFCC06563-Site Plan.pdf14 Oct 2026
- PDFCC06563-Site Plan.pdf12 Oct 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLCRM 1838059 _ LONO - 1 Clarke Street, Southport14 Nov 2026
- EMLRE_ CRM 1838059 _ LONO - 1 Clarke Street, Southport14 Nov 2026
- EMLCRM - 1838059 - LONO - 1 Clarke Street, Southport EML13 Nov 2026
- EMLLONO EML Correspondance with council for amendments - CRM 1838059 _ LONO - 1 Clarke Street, Southport -29 Oct 2026
- EMLRe_ TGS Amendment - 1 Clarke St19 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 07 | 16 Nov 2026 | 8 | CC06563-CTMP-Rev07.pdf |
| — | TMP | Rev 07 | 16 Nov 2026 | 8 | CC06563-TMP-Rev07.pdfTMP Risk Report - 1 Clarke St, Southport.pdf |
| — | RA | Rev 06 | 4 Nov 2026 | 5 | Appendix E Desktop Risk Assessment.pdf |
| S1 | TGS | Rev 07 | 16 Nov 2026 | 8 | CC06563-TGS-S1-rev07 - 1 Clarke St, Southport.pdf |
03Requests on Monday
8 requests since 6 Oct 2026: 1 for new plans and 7 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport | Council RFI | S1 | Rev 06 | Review amendments Internal Amendments | 5 Nov 2026 | 7 Nov 2026 | Rudra Khadka | Christopher Wright |
| CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport Urgent | Council RFI | TMP | Rev 06 | With client Client review | 4 Nov 2026 | 6 Nov 2026 | KB.R | Christopher Wright |
| CC06563-TMP - Rev 5 - Azure - 1 Clarke St, Southport | Council RFI | TMP | Rev 05 | With client Client review | 2 Nov 2026 | 4 Nov 2026 | Christine Vilador | S.B |
| CC06563-S1 - Rev 5 - Azure - 1 Clarke St, Southport Urgent | Council RFI | S1 | Rev 05 | Closed No Charge | 29 Oct 2026 | 31 Oct 2026 | ||
| CC06563-S1 - Rev 4 - Azure - 1 Clarke St, Southport Urgent | Council RFI | S1 | Rev 04 | Closed No Charge | 26 Oct 2026 | 28 Oct 2026 | ||
| CC06563-S1 - Rev 2 - Azure - 1 Clarke St, Southport | Council RFI | S1 | Rev 02 | With client Client review | 19 Oct 2026 | 21 Oct 2026 | Rudra Khadka | Christopher Wright |
| CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport | Amendment | S1 | Rev 01 | With client Client review | 14 Oct 2026 | 16 Oct 2026 | J.G | Christopher Wright |
| CC06563 - Azure - 1 Clarke St, Southport | New plans | To invoice To Be Invoiced | 6 Oct 2026 | 8 Oct 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- AishaProject coordinator (folder flag)
- Rudra KhadkaPlanner
- Christopher WrightTMD
- KB.RPlanner
- Christine ViladorPlanner
- S.BTMD
- J.GPlanner
- Aisha WaverProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 3:45 pm · S.B · CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport
Hi Rudra and Aisha, I've checked the current CC06563-TGS-S1-Rev06.pdf in the Rev 06 folder. Thanks for putting the numbering back: 9C/D (Plan 6 contingency) and 10C/D (Plan 7) now match what Council has in the CTMP, and Plan 5 (8A–8E) is back with the Rev 6 note. 1. Which file is final? * . The only PDF in Rev 06 has R.D 12/11/2026, and its revision history stops at Rev 6 (12/11), so I can't confirm whether Chris's change is in it. Aisha, can you confirm which file Antonette saved and where? Whoever has the final version, please save it as the only PDF in Rev 06 and add the change to the revision history (e.g. "Added ROADWORK AHEAD for turning traffic and speed reduction on TGS __, 16/11/2026"). 2. LONO already issued, so check before sending * Council's LONO came through on 13/11, and Chloe's 5/11 email asked for 8D/8E to be removed from the deck. The Rev 6 note says Plan 5 was "added back and fence line moved as per council request". If that came out of the Teams meeting with Chloe, great, but please make sure we have it in writing. If it's actually a client request, change the wording. Any sheet changed after the LONO (Plan 5, plus Chris's sign change) will need Council to accept it. * Council's permit wording lists 1D–6D at Revision 3 and 7C at Revision 4. Please confirm with Aisha that issuing everything at Rev 6 won't cause a mismatch with the permit. If it might, list on the cover which sheets actually changed in each revision. 3. Revision history (still to fix from…
- 12 Nov 2026, 3:56 pm · Rica Panganiban · CC06563 - Azure - 1 Clarke St, Southport
IV0025967 - drafted - Rica
- 10 Nov 2026, 2:59 pm · S.B · CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport
Hi Rudra, Checked Rev 06 against Chloe's email (5 Nov). 8D/8E (Plan 5, Smith St fencing/stormwater) has been taken out, which is what Council asked for. But the renumbering has created a problem. * Please don't renumber. In Rev 05 the daily arrangements were 9C/D (Plan 6 contingency) and 10C/D (Plan 7). In Rev 06 they've become 8C/D and 9C/D. Chloe said no further TMP amendments, so the CTMP she's approving still refers to the old numbers. Council's permit wording and the CTMP would no longer match the deck we send her. Please put the numbering back to Rev 05 (keep 9 and 10 as they were) and just remove 8A/B/C and 8D/E. A gap in the numbering is fine. Note on the cover that TGS 8 was removed at Council's request. * Revision history. Rev 4 (27/10) is listed twice and the Rev 5 description is blank. Please clean that up while you're in there. The Rev 6 note should say "TGS 8 (Plan 5) removed per Council request, no other changes". * Before Aisha sends it back to Chloe, please quickly check that every TGS number in the CTMP matches a sheet in the deck. Cheers @Rudra Khadka @Aisha Waver
- 5 Nov 2026, 4:48 pm · Riri D. · CC06563-S1 - Rev 6 - Azure - 1 Clarke St, Southport
Plans folder: 1. Plans - CC06563 Suite: S1 Save work here: TGS > Rev 06 Project location: 1 Clarke St, Southport Quote: none Job request form: none Request type: Amendment Scope: TGS Could the following TGS’ please be removed from the deck to ensure the deck contains only the TGS that are being implemented for this project: * CC06563-S1-8E * CC06563-S1-8D
- 6 Nov 2026, 12:00 pm · Rudra Khadka
Hi @Aisha Waver @Christopher Wright Task is competed and uploaded to its respective folder. Link: Rev 06 Accounts, 2 x TGS ( CC06563-S1-8D/E removed from the deck and remaining TGS renumbered) Thank You!
- 10 Nov 2026, 5:05 pm · Riri D.
@Rudra Khadka we initially removed plan 5 from the suite, however we need to add it back in and move the fence line where the red line is
- 11 Nov 2026, 3:25 pm · Aisha Waver
Is anyone on this one if Rudra is away? we also need this one back please
- 12 Nov 2026, 12:44 pm · Aisha Waver
has this one been completed please
- 12 Nov 2026, 12:45 pm · Rudra Khadka
Working on it. Will update ASAP. Thank You!
- 12 Nov 2026, 4:21 pm · Rudra Khadka
Hi @Aisha Waver Task is completed and uploaded to its respective folder. Accounts, 1 x Additional TGS Plan:5 - TGS (8D/E) 1 x TMP ( Updated TGS on CTMP )
- 13 Nov 2026, 11:56 am · Aisha Waver
@Rudra Khadka can we please make further amendments. The fnecline now needs to be on the daily arrangment please and thank you
- 13 Nov 2026, 12:06 pm · Rudra Khadka
Hi @Aisha Waver Can you please message me on teams for small clarification. Though my question is i shall add the fence line on whole perimeter or which portion ,also we have two suites of daily arrangement. Will you please confirm this before i make changes.Thank You!
- 13 Nov 2026, 12:27 pm · Aisha Waver
please void. Thank you
- 13 Nov 2026, 12:30 pm · Rudra Khadka
Thanks @Aisha- noted, I will leave the drawings unchanged.
- 16 Nov 2026, 10:19 am · Christopher Wright
Hi @Rudra Khadka there is missing "Roadwork Ahead" signage for vehicles turning, there will also need to be a speed reduction.
- 16 Nov 2026, 11:51 am · Rudra Khadka
Hi @Christopher Wright Above comments are amended and uploaded to its respective folder. Thank You!
- 16 Nov 2026, 12:08 pm · Aisha Waver
please disregard all. Antonette is amended the required things
- 6 Nov 2026, 12:00 pm · Rudra Khadka
- 4 Nov 2026, 4:53 pm · KB.R · CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport
Hi @Aisha Waver @Christopher Wright, For URGENT!! CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport, I've amended the TMP following client's confirmation: can we please explain/detail what the works are for in plan 1 of 7.2 and explain why it is stil closed during the after care. I've amended it as concrete curing as the reason for the verge closure during after-hours. Accounts: 1xTMP Amendment Link: Rev 06 It is now available for review. Thank you!
- 5 Nov 2026, 10:08 am · Aisha Waver
Andrew has reviewed, has been sent to client
- 5 Nov 2026, 10:08 am · Aisha Waver
- 4 Nov 2026, 1:21 pm · KB.R · CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport
Hi @Riri D. @Aisha Waver @Christopher Wright, I've reviewed the TGS and CTMP and I think this has already been addressed in 7.2 for the daily arrangement. Their daily arrangement is Plan 6 & 7 which is CC06563-S1-9 and CC06563-S1-10 in the count. I've highlighted in yellow the description to note that there are no footpath closures for the daily arrangement. The figure also shows no footpath closure within the area, and this is reflected in the table as well. I've checked also the separate sections discussing each daily arrangement (8.6 & 8.7) and it reflects that there are no footpath closures during site active and site inactive hours. I don't think there's any more amendment needed to be done here.
- 4 Nov 2026, 12:49 pm · Riri D. · CC06563-TMP - Rev 6 - Azure - 1 Clarke St, Southport
LONO application amendment please update the relevant in blue from the CTMP Plans folder: 1. Plans - CC06563 Suite: S1 Save work here: TMP > Rev 06 Project location: 1 Clarke St, Southport Quote: none Job request form: none Request type: Amendment Scope: CTMP CRM 1838059 _ LONO - 1 Clarke Street, Southport.eml
- 2 Nov 2026, 1:42 pm · Christine Vilador · CC06563-TMP - Rev 5 - Azure - 1 Clarke St, Southport
@S.B for TMD review. 1x TMD amendment - updated Sections 6.1 and 6.2.1 to reflect Monday–Friday working hours (6:30 AM–6:30 PM), and clarified pedestrian arrangements for Plans 6 & 7 in Section 7.2 to confirm no daily footpath closure or associated aftercare is proposed. Link - Rev 05
- 30 Oct 2026, 11:37 am · Riri D. · CC06563-S1 - Rev 5 - Azure - 1 Clarke St, Southport
URGENT!! CC06563-S1 - Rev 5 - Azure - 1 Clarke St, Southport Aisha Waver TMD Approved sent back to council by Aisha - no charged as per Aisha
- 29 Oct 2026, 1:05 pm · S.B · CC06563-S1 - Rev 5 - Azure - 1 Clarke St, Southport
Posted by marklara@cromptonconcepts.com.au (marklara@cromptonconcepts.com.au) · @Mark Darren via Work Flow This is now ready for Review. Kindly check the folder below: TGS Rev 05 - Sharepoint - Documents TMP Rev 04 - Sharepoint - Documents Please let me know if any further information or revisions are required. Thank you. TGS Amendment: - Added afftercare notes and show workman signs to be covered on 2D, 4D, and 6D. TMP Amendment: - Updated aftercare on - Section 7.2 – Fig. 7, 9, 11 Links * TGS Sharepoint * TMP Sharepoint RapidPlan screenshot attached below. RapidPlan time: 2h
- 29 Oct 2026, 9:59 am · Permits · CC06563-S1 - Rev 5 - Azure - 1 Clarke St, Southport
Hi Team!! Please save work here: TGS > Rev 05 TMP > Rev 04 Plans: 1. Plans - CC06563 Council RFI. Details below. Thanks ~ Shaz
- 29 Oct 2026, 10:13 am · Riri D.
@Mark Darren please see job request and council email for the markups as reference amendment request - Job Request.pdf LONO EML Correspondance with council for amendments - CRM 1838059 _ LONO - 1 Clarke Street, Southport -.eml
- 29 Oct 2026, 1:00 pm · Mark Darren
Hi, @Christopher Wrigh. This is now ready for Review. Kindly check the folder below: TGS Rev 05 - Sharepoint - Documents TMP Rev 04 - Sharepoint - Documents Please let me know if any further information or revisions are required. Thank you. TGS Amendment: - Added afftercare notes and show workman signs to be covered on 2D, 4D, and 6D. TMP Amendment: - Updated aftercare on - Section 7.2 – Fig. 7, 9, 11
- 29 Oct 2026, 10:13 am · Riri D.
- 28 Oct 2026, 2:32 pm · Aisha Waver · CC06563-S1 - Rev 4 - Azure - 1 Clarke St, Southport
LONO Amendents - no charge
- 27 Oct 2026, 10:49 am · KB.R · CC06563-S1 - Rev 4 - Azure - 1 Clarke St, Southport
Hi @Aisha Waver @S.B, For CC06563-S1 - Rev 4 - Azure - 1 Clarke St, Southport, I have amended the TGS and TMP following client's comments. Summary of changes are written in each change log. I've covered everything on what was requested, please let me know if there's anything you want me to add further. Accounts: 1xTGS Amendment 1xTMP Amendment 1xRA Amendment 1xOA Amendment Link: TGS > Rev 04 TMP > Rev 03 It is now available for review. Thank you!
- 28 Oct 2026, 2:28 pm · Aisha Waver
- 26 Oct 2026, 4:32 pm · Riri D. · CC06563-S1 - Rev 4 - Azure - 1 Clarke St, Southport
CC06563-S1-7D - Rev 4 amendment, to change the current footpath closure, no longer Impacting the footpath. We will have the current fenceline bought on the inside boundary of the footpath, so no direct impact on the pedestrians. Can we please amend the TMP as follows. Please clarify time frames, for the following works to justify the current pedestrian detours. * There are only 2 crossovers, 1 is temporary and 1 is permanent.* Construction of new final crossover on Clarke St - 1.5 week (detailed ex, material import + place, FRP concrete, curing, 12m of new kerb) * Construction of temp crossover on Village - 2 days * Make good to village boulevard council kerb/softscape/footpath once temp crossover is removed - 4 days can we clarify in the TMP that works from within the site will be conducted on some Saturdays. for non-traffic impacting/noisy construction works. Will definitely be wanting to have the odd Saturday here and there for subbies to come in and catch up on work (plumbers, carpenters etc, not major works). Can we also please remove the plan 5 - storm water TGS in the TMP as this has been removed from the current TGS suite. Can we also please make clear in the TMP that all major construction works such as (if relevant) * Delivery and removal of piling rigs and other oversized plant. * Mobile crane setup and operation. * Concrete pours. * General heavy vehicle and construction-related deliveries. * Any other activities requiring occupation of City land, traffic…
- 20 Oct 2026, 12:45 pm · Riri D. · CC06563-S1 - Rev 2 - Azure - 1 Clarke St, Southport
Sent to client Re_ TGS Amendment - 1 Clarke St.eml
- 19 Oct 2026, 10:32 am · Riri D. · CC06563-S1 - Rev 2 - Azure - 1 Clarke St, Southport
@Rudra Khadka Could you please get the attached form completed so we can load you into our system. Realized that a PO hadn't been issued to you yet. Regarding the CTMP, just 2 items below: Plan 2: * Page 48/252 - Duration will be prior to handover of Stage 1 (Early March-2028) * Just to confirm that we're on the same page. When you've written "temporary crossover construction", you know that we're not actually (haven't planned to atleast) going to be constructing anything outside our boundary, right? We're building a standard rock gravel entry and cattle grid from our boundary inwards. Would just be installing kerb ramps, meaning council's verge, footpath, and kerb would be tracked over and obviously need to be made good on the back end. If it gets too messy, I'd likely pour a temp crossover which I suppose this TGS would cover. * There is no permanent crossover ever going there. * Can you confirm that I'm good to run with the above methodology? Couple images of proposal * * * Plan 3:* Page 53/252 - Start Date: Early March 2028 * Page 53/252 - Duration: Early April 2028 prior to Stage 4 handover Re_ TGS Amendment - 1 Clarke St.eml - also saved in folder
- 19 Oct 2026, 10:02 am · Permits · CC06563-S1 - Rev 2 - Azure - 1 Clarke St, Southport
Hi Plans folder: 1. Plans - CC06563 Suite: S1 Save work here: TGS > Rev 02 Project location: 1 Clarke St, Southport Thank you! 🧡Kim
- 19 Oct 2026, 10:34 am · Riri D.
@Rudra Khadka its TMP amendment. Save work here: TMP > Rev 02
- 19 Oct 2026, 12:30 pm · Rudra Khadka
Hi @Aisha Waver @Christopher Wright and @Riri D. Work is completed and uploaded to attached link below. Link:https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts, 1 x TMP ( Updated Plan 2 and 3 of CTMP for duration of work and updated methodology for Temp. Crossover construction in Plan 2)
- 20 Oct 2026, 10:03 am · Christopher Wright
Hi @Rudra Khadka Please add a colour to all closed sections of the road way on all applicable TGS's Please allocate " Road Work Ahead's" in the approach signage please Please remove the TC's and the 4 cones from this plan.
- 20 Oct 2026, 12:04 pm · Rudra Khadka
Hi @Christopher Wright TGS is amended and added to Rev 02 folder attached below link. Please let me know if this requires further changes. Link:https://cromptonconcepts.sharepoint.com/Shared%20Documents/Forms/AllItems.aspx?id=%2FShared%20Docume... Accounts, amended TGS (3D,3E,9D,10C) Thank You!
- 20 Oct 2026, 12:16 pm · Christopher Wright
This is GTG
- 20 Oct 2026, 1:57 pm · Riri D.
Hi @Christopher Wright, client came back and says that the plan 5 stormwater made it's way back in? Could you please assist on this one? Re_ TGS Amendment - 1 Clarke St.eml
- 20 Oct 2026, 9:26 pm · Riri D.
@Rudra Khadka please amend as per client request and teams Chris if needed :)
- 21 Oct 2026, 7:16 am · Christopher Wright
This has been corrected and also sent to the client
- 19 Oct 2026, 10:34 am · Riri D.
- 16 Oct 2026, 3:14 pm · Riri D. · CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport
Sent to client Re_ TGS Amendment - 1 Clarke St.eml
- 16 Oct 2026, 9:55 am · Riri D. · CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport
@J.G Amendment on 1 Clarke st, Southport. I have added the TGS with comments on what needs to be amended - Aisha CC06563-TGS-S1-Rev01 - marked up for amendment.pdf
- 16 Oct 2026, 10:09 am · J.G
@Riri D. This is done and was sent to client for review. Thank you
- 16 Oct 2026, 10:09 am · J.G
- 15 Oct 2026, 2:43 pm · Riri D. · CC06563 - Azure - 1 Clarke St, Southport
Plans sent to client Fw_ Revised TGS and TMP - 1 Clarke St, Southport.eml
- 15 Oct 2026, 2:33 pm · Riri D. · CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport
Plans sent to client Fw_ Revised TGS and TMP - 1 Clarke St, Southport.eml
- 14 Oct 2026, 2:38 pm · J.G · CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport
@Christopher Wright For TMD review. Thank you Amendments: 2x TGS Amendment (TGS 1&2): Updated description to New Crossover Construction 2x TGS Amendment (TGS 3&4): Updated description to Temporary Crossover Construction 2x TGS Amendment (TGS 5&6): (1) Updated description to Footpath Connection Works (2) Overlay snip on TGS 1x TGS Amendment (TGS 8): (1) Extended work area (2) Overlay snip on TGS 1x TGS Amendment (TGS 10): Updated Site Ingress/Egress arrows to better show reverse entry 1x TGS Amendment (TGS 11): Updated TC note 1x Haulage Route Amendment: Updated per TGS 10 and 11 site entry/exit 1x TMP Amendment: Figures and descriptions updated per above. Links: TGS - Rev 01 TMP - Rev 01 Thank you
- 15 Oct 2026, 7:36 am · Christopher Wright
This is GTG @Aisha Waver
- 15 Oct 2026, 7:36 am · Christopher Wright
- 14 Oct 2026, 1:50 pm · Sandy · CC06563-S1 - Rev 1 - Azure - 1 Clarke St, Southport
Hi @J.G Plans folder: 1. Plans - CC06563 Suite: S1 Save work here: TGS > Rev 01 Project location: 1 Clarke St, Southport Quote: N/A Request type: Amendment Scope: TGS Specific operations: Ask more details to PC TGS to amend: TGS number Client mark-ups/attachments: N/A
- 14 Oct 2026, 1:57 pm · Riri D.
@J.G as discussed on teams, adding a Monday for the amendment request sent by @Aisha Waver on teams.
- 14 Oct 2026, 1:57 pm · Riri D.
- 13 Oct 2026, 8:12 am · A.A · CC06563 - Azure - 1 Clarke St, Southport
@Aisha Waver GTG
- 12 Oct 2026, 3:53 pm · A.A · CC06563 - Azure - 1 Clarke St, Southport
@J.G Hi Jaymark, instead of noting that due to low traffic expected, send all peds to the end of the road. If they choose to do something different to whats on the TGS it will be up to them. We will keep it legal. The City of Gold Coast will not support that as a proper risk assessment.
- 12 Oct 2026, 4:28 pm · J.G
@A.A All good, thank you Link: TGS > Rev 00 TMP > Rev 00
- 12 Oct 2026, 4:28 pm · J.G
- 9 Oct 2026, 2:36 pm · J.G · CC06563 - Azure - 1 Clarke St, Southport
@A.A For TMD review. Thank you Accounts: 11x TGS 1x RA 1x TIA Full TMP Link: TGS > Rev 00 TMP > Rev 00
- 6 Oct 2026, 5:07 pm · Permits · CC06563 - Azure - 1 Clarke St, Southport
Plans folder: 1. Plans - CC06563 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 1 Clarke St, Southport Quote: to follow Request type: New Scope: TGS & TMP Instructions: Remove all work zone plans from TMP and TGS. 2. section view of the work area for the storm water 3. Daily arrangement - changed the direction of the trucks enry and exit, keep the current arrangement as a back up. new daily arrangement additional TGS to enter from Clarke and exit on to VillageBlvd 4. Note in the TMP workers will be encouraged to work off site and carpool to the construction site and public transport will be heavily encouraged 5. Repilcate everything else Thanks. Iris (061026)
06Every file and folder
136 files in 35 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|