205 - 211 Surf Parade, Surfers Paradise
OBX Constructions
What's new
- 16 Oct 2026, 10:17 amRiri D. on CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise:
- 7 Oct 2026, 1:14 pmKB.R on CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise: Hi @Ethan Mathews @Christopher Wright, I've created 2xConcept Plans following the markups attached. I've provided peds management options for each TGS as well. Accounts: 2xConcept Plans Link: Concept Plans It is now available for review.
- 7 Oct 2026, 10:44 amPermits on CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise: Hi @KB.R Please save work here: Concept Plans Project folder: 205 - 211 Surf Parade, Surfers Paradise Mark Ups Below: Option 1: Hold & Release both ways with x1 TC using portabooms both directions, trucks to nose into and out from wearing slab Option 2: Hold…
Crompton Concepts prepares the traffic management for OBX Constructions on this project at 205 Surf Parade, Surfers Paradise QLD 4217, Australia. No Monday request is open right now; the latest one closed recently. Every file opens straight from SharePoint.
- Client
- OBX Constructions
- Crompton job
- CC06564
- Location
- 205 Surf Parade, Surfers Paradise QLD 4217, Australia
- LGA / authority
- City of Gold Coast
- Project coordinator
- Ethan Mathews
- Latest planner · TMD
- —
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- None on the permit boards
- Last activity
- 16 Oct 2026
- Files on SharePoint
- 7 in 9 folders
What needs attention now
- Nothing open on Monday. The latest request is closed or invoiced; this project stays on the list while it had activity in the last 120 days.
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
Nothing filed for this yet.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
Nothing filed for this yet.
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
No TMP, TGS or report PDFs found in the project folder yet.
03Requests on Monday
1 request since 7 Oct 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise | New plans | Closed No charge | 7 Oct 2026 | 12 Oct 2026 |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- Ethan MathewsProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Oct 2026, 10:17 am · Riri D. · CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise
- 7 Oct 2026, 1:14 pm · KB.R · CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise
Hi @Ethan Mathews @Christopher Wright, I've created 2xConcept Plans following the markups attached. I've provided peds management options for each TGS as well. Accounts: 2xConcept Plans Link: Concept Plans It is now available for review.
- 7 Oct 2026, 3:12 pm · KB.R
As per instructions, I've amended it following the easement closure you want me to note in the plans. Though, peds detour for the easement closure is only described in a note, rather than showing it, as it is only for temporary closure for site shed installation. Thanks!
- 8 Oct 2026, 9:32 am · Christopher Wright
This is GTG @Ethan Mathews
- 7 Oct 2026, 3:12 pm · KB.R
- 7 Oct 2026, 10:44 am · Permits · CC06564 - Concept Plan - OBX Constructions - 205-211 Surf Parade, Surfers Paradise
Hi @KB.R Please save work here: Concept Plans Project folder: 205 - 211 Surf Parade, Surfers Paradise Mark Ups Below: Option 1: Hold & Release both ways with x1 TC using portabooms both directions, trucks to nose into and out from wearing slab Option 2: Hold & Release one way with x1 TC using x1 portaboom for trucks to nose in and out of the wearing slab - Please also note x2 options for pedestrians on each TGS: Hold & Release or closure detour Thanks - Shaz
06Every file and folder
7 files in 9 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|