100 Eugaree, Southport
Centro Concepts
What's new
- 10 Nov 20266 files saved on SharePoint: Pre-Lodgement Submission Questionnaire - Filled out.docx, CC06565-TMP-Rev01-Centro Concepts - 100 Eugaree, Southport.docx, CC06565-CTMP-Rev01-Centro Concepts - 100 Eugaree, Southport.pdf, CC06565-TMP-Rev01-Centro Concepts - 100 Eugaree, Southport.pdf and 2 more
- 10 Nov 2026, 9:19 amMackenzy Moller on CC06565 - Centro Concepts - 100 Eugaree, Southport: @R.R URGENT can this work zone be fixed asap please make sure it it updated in the TMP and TGS workzone signs need to reflet 6:30am -4:30pm
- 4 Nov 20264 files saved on SharePoint: CC06565-S2-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.tcp, CC06565-S2-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.pdf, CC06565-S1-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.tcp, CC06565-S1-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.pdf
- 3 Nov 20261 file saved on SharePoint: Request RE_ 100 Eugaree - RFP - Traffic Engineer.eml
- 20 Oct 2026, 11:11 amSandy on CC06565 - Centro Concepts - 100 Eugaree, Southport: ✓ Invoice to follow ✓ Plans sent to client (2010) CC06565 - Centro Concepts - 100 Eugaree, Southport.eml
- 19 Oct 2026, 10:04 amMackenzy Moller on CC06565 - Centro Concepts - 100 Eugaree, Southport: URGENT @R.R @Christopher Wright Please see Clients response to the document - this needs to be fixed ASAP I have reviewed the docs you sent through and have the following comments. General note, all the TGS reference 98 Eugaree St, this needs to change to…
Crompton Concepts prepares the traffic management for Centro Concepts on this project at 100 Eugaree St, Southport, QLD. 1 Monday request is open; the most pressing is at the with client stage; the current CTMP on SharePoint is Rev 01; 2 TGS suites on file (S1 Rev 02, S2 Rev 02). On the permit boards: 0 permits in force and 1 in progress. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06565
- MondayCC06565 - Centro Concepts - 100 Eugaree, Southport
- Client
- Centro Concepts
- Crompton job
- CC06565
- Location
- 100 Eugaree St, Southport, QLD
- LGA / authority
- City of Brisbane
- Project coordinator
- Mackenzy Moller
- Latest planner · TMD
- R.R · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- 0 in force · 1 in progress
- Last activity
- 16 Nov 2026
- Files on SharePoint
- 37 in 18 folders
What needs attention now
- Issued, waiting on client: CC06565 - Centro Concepts - 100 Eugaree, Southport. Required by 14 Oct 2026. Planner: R.R · TMD: Christopher Wright · Last note (10 Nov 2026, Mackenzy Moller): “@R.R URGENT can this work zone be fixed asap please make sure it it updated in the TMP and TGS workzone signs need to reflet 6:30am -4:30pm”
- Permit in progress: LONO (CMP / LONO) is Council Pending.
PPermits
1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| LONO Team Mackenzy · BCC CMP Lodgment / GCCC LONO lodgment | CMP / LONO | In progress Council Pending |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06565-CTMP-Rev01-Centro Concepts - 100 Eugaree, Southport.pdfCTMP Rev 01 · 10 Nov 2026
- DOCX100 Eugaree - TMP Project Information Request.docx20 Oct 2026
- DOCX100 Eugaree - TMP Project Information Request.docx14 Oct 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLRequest RE_ 100 Eugaree - RFP - Traffic Engineer3 Nov 2026
- EMLSent Quote22 Oct 2025
- EML25-191.01-1a 100 Eugaree Street, Southport FEE PROPOSAL22 Oct 2025
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 10 Nov 2026 | 2 | CC06565-CTMP-Rev01-Centro Concepts - 100 Eugaree, Southport.pdf |
| — | TMP | Rev 01 | 10 Nov 2026 | 2 | CC06565-TMP-Rev01-Centro Concepts - 100 Eugaree, Southport.pdfTraffic Impact Analysis & Detour Analysis.pdf |
| — | RA | Rev 01 | 23 Oct 2026 | 2 | CC06565-RA.pdf |
| S0 | Workzone plan | no rev | 10 Nov 2026 | 0 | CC06565-S0-Work Zone Plan-R1-Centro Concepts - 100 Eugaree, Southport.pdf |
| S1 | TGS | Rev 02 | 4 Nov 2026 | 3 | CC06565-S1-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.pdf |
| S2 | TGS | Rev 02 | 4 Nov 2026 | 3 | CC06565-S2-TGS-Rev 02-Centro Concepts - 100 Eugaree, Southport.pdf |
03Requests on Monday
1 request since 9 Oct 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06565 - Centro Concepts - 100 Eugaree, Southport | New plans | With client Client Review | 9 Oct 2026 | 14 Oct 2026 | R.R | Christopher Wright |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- R.RPlanner
- Christopher WrightTMD
- Mackenzy MollerProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 10 Nov 2026, 9:19 am · Mackenzy Moller · CC06565 - Centro Concepts - 100 Eugaree, Southport
@R.R URGENT can this work zone be fixed asap please make sure it it updated in the TMP and TGS workzone signs need to reflet 6:30am -4:30pm
- 10 Nov 2026, 10:30 am · R.R
Hi @Mackenzy Moller Workzone plans updated. Thank you TGS: Sharepoint - Documents - TGS - All Documents TMP:Sharepoint - Documents - Rev 01 - All Documents
- 10 Nov 2026, 10:30 am · R.R
- 20 Oct 2026, 11:11 am · Sandy · CC06565 - Centro Concepts - 100 Eugaree, Southport
✓ Invoice to follow ✓ Plans sent to client (2010) CC06565 - Centro Concepts - 100 Eugaree, Southport.eml
- 19 Oct 2026, 10:04 am · Mackenzy Moller · CC06565 - Centro Concepts - 100 Eugaree, Southport
URGENT @R.R @Christopher Wright Please see Clients response to the document - this needs to be fixed ASAP I have reviewed the docs you sent through and have the following comments. General note, all the TGS reference 98 Eugaree St, this needs to change to 100 Eugaree St down the bottom of the sheet. Nice to be able to copy and paste haha. TGS Stage 1 * Demolition & Excavation - All good. * Daily Arrangement / Concrete Pours (Parking Lane Closure) - Need to probably review the cone layout for the lane closure heading west so it doesn't block the 98 Eugaree St entry. * Concrete Pours (Lane and Footpath Closure) - Why is the lane closed so much? Exceeds quite significantly, probably overkill. Could be similar to the other concrete pour/daily arrangement TGS but just half road rather than shoulder. Please review and let us know your thoughts. * Aftercare (Footpath Closure) - Can we use bollards instead of cones with flagging/bunting, I would say this is easier/better. * Tower Crane Erection - I think we should have an option to run with a half road closure as this can be pretty much the same as the concrete pour TGS. TGS Stage 2 * Maybe we will make the pedestrian entry where the footpath ends so pedestrians don't need to walk on the street then into site. Might be worth changing. TMP - Below are my comments but I think you guys needs to review this. Not sure if it has been reviewed since 98 Eugaree St. * 5.1.6 has Lindores Personnel as the company implemented for traffic…
- 19 Oct 2026, 10:39 pm · R.R
TGS amendments: S1 Sharepoint - Documents - Rev 02 - All Documents TGS 2: adjusted the cones for #98 driveway access TGS 3: Opted to Half Road Closure instead (Westbound lane closed) / added detour map for westbound traffic TGS 4: changed the “bollards with mesh fence” (cones with flagging/bunting, which I believe refers to this) to just bollards. TGS 7: I’ve included a note directing to the existing half-road closure TGS 8: Opted to half road closure as well S2 Sharepoint - Documents - Rev 02 - All Documents Added a few callouts to avoid confusion along the site pedestrian route. TMP: Sharepoint - Documents - Rev 01 - All Documents Accounts: 4x TGS amendments CC06565-S1-2B CC06565-S1-3B/3C CC06565-S1-4B CC06565-S2-1B TMP amendments
- 20 Oct 2026, 6:30 am · Christopher Wright
Morning @R.R There does not seem to be files in this folder? The half road closure will need to be changed to Shuttle flow the same as the concrete pour TGS, I know the word "Half road closure" was there but it also identifies the TGS that they want it to be that same as.
- 20 Oct 2026, 10:03 am · R.R
@Christopher Wright, thanks for clarifying the half‑road setup. I’ll make the necessary adjustments to the plans. The TMP will follow and be updated shortly.
- 20 Oct 2026, 2:32 pm · R.R
Hi @Christopher, Files are now uploaded, including the TMP and the new TIA. There are a few items I need help with, as I’m not fully sure what amendments are required: 1. The legislation list 2. The crash data tool I have here is the same tool used from the old data
- 29 Oct 2026, 11:21 am · Riri D.
@R.R can you please check if this has been updated
- 4 Nov 2026, 11:27 am · Riri D.
Make this as a priority @R.R after your current job allocation :)
- 4 Nov 2026, 7:20 pm · R.R
@Riri D. updated now. Thank you
- 5 Nov 2026, 11:12 am · Riri D.
sent back to client Re_ CC06565 - Centro Concepts - 100 Eugaree, Southport.eml
- 19 Oct 2026, 10:39 pm · R.R
- 14 Oct 2026, 7:48 am · Mackenzy Moller · CC06565 - Centro Concepts - 100 Eugaree, Southport
Sent to client for review Re_ 100 Eugaree St, Southport - RFQ.eml
- 13 Oct 2026, 12:47 pm · Mackenzy Moller · CC06565 - Centro Concepts - 100 Eugaree, Southport
@R.R please see attached from client to help with TMP 100 Eugaree - TMP Project Information Request.docx
- 13 Oct 2026, 1:07 pm · R.R
Thank you. I’ve uploaded the plans, separating Stage 1 and Stage 2. When you have a moment, could you please review them to make sure everything is aligned.
- 13 Oct 2026, 1:13 pm · Mackenzy Moller
@R.R Looks great thanks
- 13 Oct 2026, 5:40 pm · R.R
Hi @Mackenzy Moller @A.A , Files uploaded for review. Thank you S1: Sharepoint - Documents - S1 - All Documents S2: Sharepoint - Documents - S2 - All Documents Work Zone Plan: Sharepoint - Documents - Rev 00 - All Documents TMP: Sharepoint - Documents - Rev 00 - All Documents Accounts: S1= 7x TGS (TGS CC06565-S1-1A/B to TGS CC06565-S1-7A/B) S2=1x TGS (TGS CC06565-S2-1A/B 10 1x Work Zone Plan 1 TMP
- 14 Oct 2026, 7:37 am · Christopher Wright
This is GTG
- 13 Oct 2026, 1:07 pm · R.R
- 9 Oct 2026, 12:33 pm · Sandy · CC06565 - Centro Concepts - 100 Eugaree, Southport
Hi @R.R Plans folder: Plans - CC06565 Suite: Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 100 Eugaree, Southport Quote: N/A Request type: New plans Scope: TGS & TMP Client mark-ups/attachments: N/A For this one planner can copy the TGS and TMP from 98 Eugaree St. 1 x TMP 7 x TGS TGS & TMP need to be completed no later the Wednesday Lunch time Client is providing Plans will pass them over once we have received them
- 9 Oct 2026, 1:15 pm · R.R
Hi @Sandy @Mackenzy Moller, May I please have a copy for 98 Eugaree St. I understand the need to have the plans and TMP completed within the required date; however, it’s difficult to move forward and determine the duration of the work process with the information still incomplete. I’m unable to proceed at this stage.
- 9 Oct 2026, 1:28 pm · Riri D.
@R.R Plans folder: Plans - CC05445 Use these plans as a reference Rev 00 and copy for 100 Eugaree, Southport plans Project location: 98 Eugaree, Southport
- 9 Oct 2026, 1:31 pm · Mackenzy Moller
@Riri D. @R.R just hear from client they will send through the projects plans Monday as he is not in the office today. please start with copying 98 for this stage and we can make amendments on Monday when we have site plans 😀
- 9 Oct 2026, 1:32 pm · R.R
Thanks @Mackenzy Moller @Riri D.
- 12 Oct 2026, 9:38 am · Mackenzy Moller
@R.R please see attached and comments from Client - could this be strated on ASAP client will require it by Wednesday See attached our Site Plan. I have added comments around Stage 01 and Stage 02 works, details below for reference. * Stage 01 - This will be during in-ground works/earthworks. Trucks can drive in and out of site as required. * Stage 02 - This will be after Stage 01 is complete and we start building the structure where trucks cannot enter/exit from site. This is when the work zone will be required from * 100 Eugaree - Site Plan (Rev 01).pdf * * On the back of the below, with the TMP, can you please review and make sure all items, locations (i.e. medical centres), etc. is all current. I think from 98 Eugaree there will need to be some changes mad
- 13 Oct 2026, 7:45 am · Mackenzy Moller
@R.R how are you going with this one? will it be able to be TMD reviews today
- 13 Oct 2026, 9:51 am · R.R
@Mackenzy Moller The plans are uploaded, and I’m in the process of completing the TMP. It should be ready for TMD review today.
- 13 Oct 2026, 11:12 am · Mackenzy Moller
@R.R Hey looks to be a few TGS missing can you confirm there are 7 we should be copying the following from 98 and just adjusting them to 100
- 13 Oct 2026, 11:14 am · R.R
@Mackenzy Moller, thanks for sending this one. I'll reupload the files shortly
- 27 Oct 2026, 9:37 am · Christopher Wright
This appears to be GTG @Riri D. can you send this off to the client please.
- 9 Oct 2026, 1:15 pm · R.R
06Every file and folder
37 files in 18 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|