← All projectsCC06571
Project portal · built 17 Nov 2026, 10:03 am AEST · TMD approved We supply traffic control

310 Vulture St, Kangaroo Point

Industrial Demolition

Harmonised works. This site's works affect a neighbouring site, so the traffic plans are harmonised. Each site stays its own job with its own CC. The other site is not named in the folder; check the harmonisation plans.

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Industrial Demolition on this project at 310 Vulture Street, Kangaroo Point,, QLD. 2 Monday requests are open; the most pressing is at the TMD approved stage; the current TMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 02). On the permit boards: 0 permits in force and 1 in progress. Monday holds 2 requests for this job (1 new, 1 amendments); all of them are on this page. Every file opens straight from SharePoint.

Client
Industrial Demolition
Crompton job
CC06571
Location
310 Vulture Street, Kangaroo Point,, QLD
LGA / authority
Kangaroo Island Council
Project coordinator
Neil Lancaster
Latest planner · TMD
Leo Escoton · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 1 in progress
Last activity
16 Nov 2026
Files on SharePoint
31 in 51 folders

What needs attention now

  1. TMD approved, ready to issue: CC06571 - Industrial Demolition - 310 Vulture St, Kangaroo Point. Required by 16 Oct 2026 (overdue). Planner: John Paul Ebarsabal, Leo Escoton · TMD: Christopher Wright · Last note (20 Oct 2026, S.B): “Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS *…”
  2. Urgent TMD approved, ready to issue: CC06571-S1 - Rev 2 - Industrial Demolition - 310 Vulture St, Kangaroo Point. Required by 11 Nov 2026 (overdue). Planner: Leo Escoton · TMD: Christopher Wright · Last note (9 Nov 2026, Leo Escoton): “Hi @Christopher Wright and @Riri D., for review Link: CC06571 Accounts 1x TGS - Amended TGS to incorporate and harmonise existing contractor signage, including work-hours…”
  3. Permit in progress: Footpath (Footpath) is To do.

PPermits

1 permit line on the Monday permit boards: 0 in force, 1 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
Footpath
Team Neil · BCC Footpath Applications - Neil
FootpathIn progress
To do

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

    Nothing filed for this yet.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
—TMPRev 0127 Oct 20261CC06571-TMP-Rev01.pdf
S1TGSRev 0210 Nov 20263CC06571-TGS-S1-Rev02 - 310 Vulture St, Kangaroo Point.pdf

03Requests on Monday

2 requests since 14 Oct 2026: 1 for new plans and 1 amendment to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06571-S1 - Rev 2 - Industrial Demolition - 310 Vulture St, Kangaroo Point UrgentAmendmentS1Rev 02TMD approved
TMD Approved
9 Nov 202611 Nov 2026Leo EscotonChristopher Wright
CC06571 - Industrial Demolition - 310 Vulture St, Kangaroo PointNew plansTMD approved
TMD Approved
14 Oct 202616 Oct 2026John Paul Ebarsabal, Leo EscotonChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • NeilProject coordinator (folder flag)
  • Leo EscotonPlanner
  • Christopher WrightTMD
  • John Paul EbarsabalPlanner
  • Neil LancasterProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi @Christopher Wright and @Riri D., for review Link: CC06571 Accounts 1x TGS - Amended TGS to incorporate and harmonise existing contractor signage, including work-hours arrangements, with the proposed worksite traffic setup Thank you!

  2. Plans folder: Plans - CC06571 Suite: S1 Save work here: TGS > Rev 02 - harmonize TGS Project location: 310 Vulture St, Kangaroo Point Quote: none Job request form: none Request type: Amendment Scope: TGS Please amend and harmonise our TGSs to match the existing traffic setup shown in the other contractor’s TGS. Please follow the below instructions: * Use the existing contractor’s TGS as the base/reference for the current site setup. * The worksite is located within the area highlighted in red in the provided markup. Please ensure this area is clearly identified as our worksite on all relevant TGSs. * Keep the existing contractor’s work-hours signage and setup as shown on their TGS. * Work-hours signage only for now — no after-hours signage. * Do not include the footpath signage. * Identify the existing contractor’s signs as their signs, using the red border/marking as discussed, so our Traffic Controllers can clearly distinguish them from our signs. * Where their existing signage already matches what we require, do not duplicate it. We only need to add our signage where something is missing or required for our worksite. * Incorporate our required signage around their existing setup and ensure the distances are maintained as per the existing TGS.* For example, if their Workman 40/NROX 50 setup already provides the required traffic control, retain it and only add/adjust our signs where necessary. * The final TGS should clearly show our worksite and the harmonised traffic…

    • 10 Nov 2026, 1:07 pm · Christopher Wright

      This is GTG @Neil Lancaster

  3. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * TGS * TMP

  4. Posted by john@cromptonconcepts.com.au (john@cromptonconcepts.com.au) · @John Paul Ebarsabal via Work Flow RapidPlan screenshot skipped: No plan file for this task Links * Rapid - TGS Plan * TMP

  5. Hi Plans folder: Plans - CC06571 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 310 Vulture St, Kangaroo Point Quote: QU5678 Request type: New plans Scope: TGS & TMP Client mark-ups/attachments: This is for a new TGS to be created to assist with footpath closure on Lahey Lane, Kangaroo Point. The client will need to erect scaffolding along Lahey Lane, on the western side of the lane, acting as containment scaffolding for the demolition. I have attached a rough mark-up of where the containment scaffold is needed. The client will also be using 320 Vulture Street and crossing materials and plant across Lahey Lane to this property next door so a TGS's for this process is also required as per the attached quote. Please reach out if there are any questions:) Quote QU5678.pdf

    • 14 Oct 2026, 9:27 am · Riri D.

      @C.R FORMPO001 (4).pdf Quote QU5678.pdf

    • 14 Oct 2026, 10:46 am · C.R

      Hi @Sandy / @Riri D. / @Neil Lancaster , Can you please supply me with additional info for the project? If the client can fully answer our project information form, that would be helpful as everything needed for the TMP is listed there. Some key information needed for confirmation: 1. What type of TMP is needed? Full, Medium, or Mini? 2. Client Contact Details (Including Project Manager, Site Manager, WHS, Site Supervisor) - Name, Email, and Phone Number 3. Project Details (Background, Description, Number of Floors, etc.) 4. Project Schedule (Proposed Start Date and Proposed End Date) 5. Working Hours 6. Installation Date and Removal Date of Long-Term Signages 7. Workzone Details (Dimension of workzone: Length x Width) Hoping to hear back from you guys. Thank you!

    • 14 Oct 2026, 3:36 pm · C.R

      Hi @Sandy / @Riri D. / @Neil Lancaster , Just a gentle nudge and a follow-up on the above please? Thank you!

    • 14 Oct 2026, 5:04 pm · Riri D.

      @C.R, Ethan has an urgent allocation for you. As advised, this will be reallocated to John Paul, and I’ve already liaised with him regarding this. Please contact him via Teams to arrange a quick handover for this job allocation. Thanks! john@cromptonconcepts.com.au

    • 15 Oct 2026, 9:27 am · C.R

      @Riri D. Noted on this. Thank you! I'll be removing myself from the project and adding John Paul as the Planner. @John Paul Ebarsabal As discussed over teams, I'll be uploading the TCP and TMP (word document) that you can use. I haven't gotten the chance to talk to Neil regarding any instructions on the project. What I only have is that of the listed details above by @Sandy . You can use them as your reference. I listed down a couple of things for client confirmation/response, feel free to follow it up with Rihana or @Neil. TCP & TMP Location: TGS > Rev 00TMP > Rev 00

    • 15 Oct 2026, 9:45 am · Riri D.

      Here is the info for Industrial Demos Allocation @John Paul Ebarsabal * Client Contact Details (Including Project Manager, Site Manager, WHS, Site Supervisor) Name, Email, and Phone Number Project Manager Jean Burl 0459400162 jean.burl@industrialdemolition.com.au Site Manager Jean Burl As above. WHS Neville Williams 0456980047 neville.williams@industrialdemolition.com.au Site Supervisor TBC * Project Details (Background, Description, Number of Floors, etc.) 310 Vulture St - Full demolition and removal of the existing building. 5 floors with plant room on the roof. * Project Schedule (Proposed Start Date and Proposed End Date) Soft start 12/10/2026, Demolition Scaffolding Scheduled for November 28th , demolition to start 11/01/27 through to early April. * Working Hours Monday -Friday (06:30-16:30) & Saturdays 0700-1400 * Installation Date and Removal Date of Long-Term Signages Install…

    • 15 Oct 2026, 10:06 am · C.R

      Hi @John Paul, forgot to mention that you can use the json file in there for the options analysis. Just edit out the correct contents so that it matches each TGS.

    • 15 Oct 2026, 10:16 am · John Paul Ebarsabal

      noted. thanks

    • 20 Oct 2026, 8:19 am · Christopher Wright

      Morning @C.R please see amendments required. TGS Amendments.docx The TMP also appears to have not been completed. Please ensure the TMR cert: 0260. Please revise the whole TMP

    • 20 Oct 2026, 9:51 am · C.R

      Hi @Christopher , I think you tagged the wrong person here. I'm not the planner for this allocation. It was reallocated and completed by @John Paul. Hi @Riri D., Can you please relay Chris's comments to @John Paul. Thanks.

    • 20 Oct 2026, 10:15 am · C.R

      Hi team, please be advised that I am not the planner for this allocation. I turned it all over to @John Paullast Thursday at 7:00 in the morning. This is per @Ethanand @Riri's instruction. I was advised that this handover was coordinated to @Neilso that I can work on 485 Adelaide. Thanks.

    • 20 Oct 2026, 11:04 am · Riri D.

      Thanks, @C.R. @John Paul Ebarsabal, could you please amend this as per Chris’s markup and comment above? Thank you!

    • 20 Oct 2026, 11:15 am · John Paul Ebarsabal

      Currently working on this.

    • 20 Oct 2026, 1:07 pm · John Paul Ebarsabal

      Hi @Christopher Wright, I already uploaded the amendment to the folder. Please review it at your convenience. * Rev 01 TGS * Rev 01 TMP Link: Sharepoint - Documents - S1 - All DocumentsLet me know if there is further need Thank you.

    • 21 Oct 2026, 10:10 am · Christopher Wright

      Hi @John Paul Ebarsabal I cant see how this document is complete when I'm seeing things like this. The TMD list should not have all of these people there and the dates are missing. @John Paul Ebarsabal A TMP starts off as a generic document, we then need to add all relevant information that pertains to the site, any information that is not for this site must be removed and all highlighted sections need to be unhighlighted. @Riri D. Can you please allocate another planner to assist @John Paul Ebarsabal in getting this sorted ASAP please, this is now super URGENT. @Neil Lancaster FYI Info is also missing here Page 15 is blank This information is incorrect

    • 21 Oct 2026, 10:39 am · John Paul Ebarsabal

      Hi @Christopher Wright , I Apologies, this is my first time working on a TMP. I would appreciate it if you could help me understand the TMP requirements and provide any available references or sample documents for guidance. If This is supper urgent maybe need some other planners to assist or correct this for now. Thank you.

    • 21 Oct 2026, 10:42 am · Christopher Wright

      @John Paul Ebarsabal @Leo Escoton Can you assist with this TMP please

    • 21 Oct 2026, 12:31 pm · Leo Escoton

      Hi @Christopher Wright, TMP has been amended and for review. Please let me know if we need changes, Thank you! Accounts: Sharepoint - Documents - Rev 01 - All Documents

    • 23 Oct 2026, 10:26 am · Christopher Wright

      This is GTG

    • 27 Oct 2026, 12:27 pm · Christopher Wright

      Hi @Leo Escoton The client would like Hording around the scaffold, I have put this on the TGS (Pink Line) Can you add a section in the TMP for this please, the date for the installation will be December and for the dismantle please just put 2027.

    • 27 Oct 2026, 1:13 pm · Leo Escoton

      Hi @Christopher Wright, I uploaded the amended TMP on Rev00 since It's not letting me upload it on Rev01

    • 27 Oct 2026, 1:14 pm · Leo Escoton

      link: Sharepoint - Rev 00 - All Documents

    • 28 Oct 2026, 9:40 am · Christopher Wright

      This is GTG @Neil Lancaster

06Every file and folder

31 files in 51 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved