59 Garfield Tce
Fine Peace Australia
What's new
- 17 Nov 20266 files saved on SharePoint: CC06590-S1-TGS-R0.tcp, CC06590-S1-CTMP-R0.pdf, CC06590-S1-TMP-R0.pdf, CC06590-TMP-Rev0.docx and 2 more
- 16 Nov 202613 files saved on SharePoint: TMP Risk Report - Fine Peace Australia.pdf, TGS_RA - CC06590-S1-TGS-6B.png, TMP_Project_Fine_Peace_Australia.json, TGS_RA - CC06590-S1-TGS-6A.png and 9 more
- 16 Nov 2026, 4:04 pmS.B on CC06590 - Fine Peace Australia - 59 Garfield Tce: Hi Michelle, Jurisdiction: QLD, City of Gold Coast (Garfield Tce, Surfers Paradise, 50 km/h). Reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and CoGC requirements. A solid, comprehensive set. All seven stages are covered (site prep, demolition/excavation,…
- 12 Nov 20267 files saved on SharePoint: CC06590-S1-TGS-R0.1.tcp, CC06590-TMP-Rev0.docx, CC06590-S1-CTMP-R0.pdf, CC06590-S1-TGS-R0.tcp and 3 more
- 11 Nov 20262 files saved on SharePoint: CC06590-S1-CTMP-R0 2.pdf, CC06590-S1-TMP-R0 2.pdf
- 5 Nov 2026, 12:48 pmMichelle Sayson on CC06590 - Fine Peace Australia - 59 Garfield Tce: Draft TGS and TMP uploaded Rev 00
Crompton Concepts prepares the traffic management for Fine Peace Australia on this project at 59 Garfield Terrace, Surfers Paradise, QLD. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 0 in progress. Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- FolderPlans - CC06590
- MondayCC06590 - Fine Peace Australia - 59 Garfield Tce
- Client
- Fine Peace Australia
- Crompton job
- CC06590
- Location
- 59 Garfield Terrace, Surfers Paradise, QLD
- LGA / authority
- Surf Coast Shire Council
- Project coordinator
- Aisha Waver
- Latest planner · TMD
- Michelle Sayson · Andrew Bryers
- Monday project status
- New
- Deliverables
- TGS
- Permits (Monday)
- 0 in force · 0 in progress
- Last activity
- 17 Nov 2026
- Files on SharePoint
- 63 in 22 folders
What needs attention now
- Review comments to action: CC06590 - Fine Peace Australia - 59 Garfield Tce. Required by 4 Nov 2026 (overdue). Planner: Michelle Sayson · TMD: Andrew Bryers · Last note (16 Nov 2026, S.B): “Hi Michelle, Jurisdiction: QLD, City of Gold Coast (Garfield Tce, Surfers Paradise, 50 km/h). Reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and CoGC requirements. A solid,…”
PPermits
1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.
| Permit | Authority | Type | Status | Period | Sent | Follow up | Renewal | Permit no. |
|---|---|---|---|---|---|---|---|---|
| LONO Team Aisha · BCC CMP Lodgment / GCCC LONO lodgment | CMP / LONO |
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06590-S1-CTMP-R0.pdfCTMP Rev 00 · 17 Nov 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFS1 · CC06590-S1-TGS-R0.pdfRev 00 + 6 more
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLPO 59GT-PO-000130 Oct 2026
- EMLRe_ Permits Quote - 59 Garfield Pde28 Oct 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 00 | 17 Nov 2026 | 1 | CC06590-S1-CTMP-R0.pdf |
| — | TMP | Rev 00 | 17 Nov 2026 | 1 | CC06590-S1-TMP-R0.pdfTMP Risk Report - Fine Peace Australia.pdf |
| General | Swept path | no rev | 7 Oct 2026 | 0 | Garfield terrace-Swept Path.pdf |
| S1 | TGS | Rev 00 | 17 Nov 2026 | 1 | CC06590-S1-TGS-R0.pdfOA - Truck Access.pdfOA_ Active - Concrete pours and large deliveries.pdfOA_ Active - Construction Level.pdfOA_ Active - Tower Crane, Piling Rig.pdfOA_ Inactive - Tower Crane, Piling Rig.pdf+1 more |
03Requests on Monday
1 request since 28 Oct 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06590 - Fine Peace Australia - 59 Garfield Tce | New plans | Review amendments Internal Amendments | 28 Oct 2026 | 4 Nov 2026 | Michelle Sayson | Andrew Bryers |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- AishaProject coordinator (folder flag)
- Michelle SaysonPlanner
- Andrew BryersTMD
- Aisha WaverProject coordinator (Monday)
Client / site
- Director - Aodi Zhang0416 715 754
- frederickfeng@finepeaceaustralia.comfrederickfeng@finepeaceaustralia.com
05Update log
Monday updates and replies on this project's requests, newest first.
- 16 Nov 2026, 4:04 pm · S.B · CC06590 - Fine Peace Australia - 59 Garfield Tce
Hi Michelle, Jurisdiction: QLD, City of Gold Coast (Garfield Tce, Surfers Paradise, 50 km/h). Reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and CoGC requirements. A solid, comprehensive set. All seven stages are covered (site prep, demolition/excavation, excavation/construction, daily arrangement, tower crane install/dismantle, concrete pours/large deliveries, gantry), with stop/slow sequences, estimated queue lengths, inserts for the Frederick St / Enderley Ave approaches, local-traffic access by TCs, and footpath closures with USE OTHER FOOTPATH signs. Please work through the following before it goes out. Also confirm on monday that it's ready for TMD review, as Aisha asked on 5/11 and there's no reply yet. 1. Wrong risk assessment in the RA folder * "RA / TMP Risk Report – CC06590.pdf" is for "Lanes East Village Facade Rectification, The Lanes Boulevard, Mermaid Waters", which is a different project. Please produce the RA for 59 Garfield Tce and make sure the wrong one isn't in the CTMP appendix. 2. End of queue (1D, and any stop/slow sheet) * 1D shows estimated queues of 96 m and 149 m, but the main advance sequence (STOP HERE, PREPARE TO STOP, 40 / ROADWORK AHEAD) is only around 6 + 15 + 15 m from the holding point. Please confirm the PREPARE TO STOP signs in Inserts A/B (Frederick St / Enderley Ave) sit beyond the 149 m queue end, and dimension that distance on the sheet. Otherwise drivers will arrive at a stopped queue with no warning. Apply the same check to…
- 16 Nov 2026, 4:53 pm · Michelle Sayson
Thank you @S.B will work on these amendments tomorrow, also regarding the review last comment on 5/11 it was coordinated with Aisha through teams and I believe it is being reviewed and the TBA and TBC information are still pending from the client.
- 16 Nov 2026, 4:53 pm · Michelle Sayson
- 5 Nov 2026, 12:48 pm · Michelle Sayson · CC06590 - Fine Peace Australia - 59 Garfield Tce
Draft TGS and TMP uploaded Rev 00
- 5 Nov 2026, 2:11 pm · Aisha Waver
is this ready for review @Michelle Sayson :)
- 5 Nov 2026, 2:11 pm · Aisha Waver
- 4 Nov 2026, 9:00 am · Michelle Sayson · CC06590 - Fine Peace Australia - 59 Garfield Tce
TGS completed, uploaded at Rev 00 TMP work in progress
- 28 Oct 2026, 12:31 pm · Sandy · CC06590 - Fine Peace Australia - 59 Garfield Tce
Hi Plans folder: Plans - CC06590 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 59 Garfield Tce Quote: QU5698 / QU5702 Request type: New plans Scope: TGS & TMP Client mark-ups/attachments:
06Every file and folder
63 files in 22 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|