← All projectsCC06590
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

59 Garfield Tce

Fine Peace Australia

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Fine Peace Australia on this project at 59 Garfield Terrace, Surfers Paradise, QLD. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 00). On the permit boards: 0 permits in force and 0 in progress. Every file opens straight from SharePoint.

Client
Fine Peace Australia
Crompton job
CC06590
Location
59 Garfield Terrace, Surfers Paradise, QLD
LGA / authority
Surf Coast Shire Council
Project coordinator
Aisha Waver
Latest planner · TMD
Michelle Sayson · Andrew Bryers
Monday project status
New
Deliverables
TGS
Permits (Monday)
0 in force · 0 in progress
Last activity
17 Nov 2026
Files on SharePoint
63 in 22 folders

What needs attention now

  1. Review comments to action: CC06590 - Fine Peace Australia - 59 Garfield Tce. Required by 4 Nov 2026 (overdue). Planner: Michelle Sayson · TMD: Andrew Bryers · Last note (16 Nov 2026, S.B): “Hi Michelle, Jurisdiction: QLD, City of Gold Coast (Garfield Tce, Surfers Paradise, 50 km/h). Reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and CoGC requirements. A solid,…”

PPermits

1 permit line on the Monday permit boards: 0 in force, 0 in progress. Newest first within each state; closed and expired permits are at the bottom.

PermitAuthorityTypeStatusPeriodSentFollow upRenewalPermit no.
LONO
Team Aisha · BCC CMP Lodgment / GCCC LONO lodgment
CMP / LONO

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

1 request since 28 Oct 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06590 - Fine Peace Australia - 59 Garfield TceNew plansReview amendments
Internal Amendments
28 Oct 20264 Nov 2026Michelle SaysonAndrew Bryers

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • AishaProject coordinator (folder flag)
  • Michelle SaysonPlanner
  • Andrew BryersTMD
  • Aisha WaverProject coordinator (Monday)

Client / site

  • Director - Aodi Zhang0416 715 754
  • frederickfeng@finepeaceaustralia.comfrederickfeng@finepeaceaustralia.com

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi Michelle, Jurisdiction: QLD, City of Gold Coast (Garfield Tce, Surfers Paradise, 50 km/h). Reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and CoGC requirements. A solid, comprehensive set. All seven stages are covered (site prep, demolition/excavation, excavation/construction, daily arrangement, tower crane install/dismantle, concrete pours/large deliveries, gantry), with stop/slow sequences, estimated queue lengths, inserts for the Frederick St / Enderley Ave approaches, local-traffic access by TCs, and footpath closures with USE OTHER FOOTPATH signs. Please work through the following before it goes out. Also confirm on monday that it's ready for TMD review, as Aisha asked on 5/11 and there's no reply yet. 1. Wrong risk assessment in the RA folder * "RA / TMP Risk Report – CC06590.pdf" is for "Lanes East Village Facade Rectification, The Lanes Boulevard, Mermaid Waters", which is a different project. Please produce the RA for 59 Garfield Tce and make sure the wrong one isn't in the CTMP appendix. 2. End of queue (1D, and any stop/slow sheet) * 1D shows estimated queues of 96 m and 149 m, but the main advance sequence (STOP HERE, PREPARE TO STOP, 40 / ROADWORK AHEAD) is only around 6 + 15 + 15 m from the holding point. Please confirm the PREPARE TO STOP signs in Inserts A/B (Frederick St / Enderley Ave) sit beyond the 149 m queue end, and dimension that distance on the sheet. Otherwise drivers will arrive at a stopped queue with no warning. Apply the same check to…

    • 16 Nov 2026, 4:53 pm · Michelle Sayson

      Thank you @S.B will work on these amendments tomorrow, also regarding the review last comment on 5/11 it was coordinated with Aisha through teams and I believe it is being reviewed and the TBA and TBC information are still pending from the client.

  2. 5 Nov 2026, 12:48 pm · Michelle Sayson · CC06590 - Fine Peace Australia - 59 Garfield Tce

    Draft TGS and TMP uploaded Rev 00

    • 5 Nov 2026, 2:11 pm · Aisha Waver

      is this ready for review @Michelle Sayson :)

  3. 4 Nov 2026, 9:00 am · Michelle Sayson · CC06590 - Fine Peace Australia - 59 Garfield Tce

    TGS completed, uploaded at Rev 00 TMP work in progress

  4. 28 Oct 2026, 12:31 pm · Sandy · CC06590 - Fine Peace Australia - 59 Garfield Tce

    Hi Plans folder: Plans - CC06590 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 59 Garfield Tce Quote: QU5698 / QU5702 Request type: New plans Scope: TGS & TMP Client mark-ups/attachments:

06Every file and folder

63 files in 22 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved