33 Park Rd, Milton
Hutchinson Builders
What's new
- 17 Nov 2026, 7:36 amP.P on CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road): @Mackenzy Moller Internal revisions made as per Sanju. Please note that client request concrete trucks to reverse out of site into traffic is not feasible due to LOS F conditions. Trucks will need to nose into the closure area then reverse onto pump from…
- 17 Nov 20268 files saved on SharePoint: CC06605-RA.pdf, CC06605-TIA.pdf, CC06605-CTMP-Rev01- 33 Park Rd, Milton.pdf, CC06605-TMP-Rev01.docx and 4 more
- 16 Nov 2026, 3:55 pmS.B on CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road): Hi Patrick, Jurisdiction: QLD (Brisbane City Council local roads), so I've reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and BCC requirements. Nice, thorough set. All 10 site-active / detour / aftercare scenarios are covered for both frontages, the…
- 13 Nov 2026, 6:17 amP.P on CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road): @Mackenzy Moller @Riri D. TGS amendments complete as per client markups. Outllook servers are down in the United States at the time of typing this so I can't currently send/receive emails. If they are functioning before my day ends I will email them to you.…
- 13 Nov 20261 file saved on SharePoint: CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdf
- 12 Nov 2026, 12:00 pmMackenzy Moller on CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road): @Riri D. @P.P Please confirm if the Amendments are being worked on as we speak and the ETA on when they will be completed CC06605-S1-TGS-Rev00- 15-17 Douglas St, Milton - HB MARKUP.pdf
Crompton Concepts prepares the traffic management for Hutchinson Builders on this project at 15–17 Douglas Street, Milton QLD 4064. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 01; 1 TGS suite on file (S1 Rev 01). Every file opens straight from SharePoint.
- FolderProject folder on SharePoint
- Folder1. Plans - CC06605
- MondayCC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
- Client
- Hutchinson Builders
- Crompton job
- CC06605
- Location
- 15–17 Douglas Street, Milton QLD 4064
- LGA / authority
- City of Brisbane
- Project coordinator
- Mackenzy Moller
- Latest planner · TMD
- P.P · Christopher Wright
- Monday project status
- New
- Deliverables
- TGS, TMP
- Permits (Monday)
- None on the permit boards
- Last activity
- 17 Nov 2026
- Files on SharePoint
- 23 in 39 folders
What needs attention now
- Urgent Review comments to action: CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road). Required by 10 Nov 2026 (overdue). Planner: P.P · TMD: Christopher Wright · Last note (17 Nov 2026, P.P): “@Mackenzy Moller Internal revisions made as per Sanju. Please note that client request concrete trucks to reverse out of site into traffic is not feasible due to LOS F conditions.…”
PPermits
Permits are tracked on the Monday team permit boards and the Permit Register.
No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.
01New to the project? Start here
- 1
Understand the job
Start with the current traffic management plan, then the client's project information.
- PDFCC06605-CTMP-Rev01- 33 Park Rd, Milton.pdfCTMP Rev 01 · 17 Nov 2026
- 2
Open the current TGS set
Latest revision of each suite. Earlier revisions are in the register and the file list.
- PDFS1 · CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdfRev 01 + 1 more
- 3
Know the paperwork
Project information, contacts, permits, quotes and invoices, as filed on SharePoint.
- 4
Catch up on correspondence
The latest emails saved into the project folder.
- EMLFw_ Park rd - Check over 7 Nov 2026
02Document register
Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.
| Suite | Document | Latest | Saved | Revs | Current files |
|---|---|---|---|---|---|
| — | CTMP | Rev 01 | 17 Nov 2026 | 2 | CC06605-CTMP-Rev01- 33 Park Rd, Milton.pdf |
| — | TMP | Rev 01 | 17 Nov 2026 | 2 | CC06605-TMP-Rev01.pdf |
| — | RA | Rev 01 | 17 Nov 2026 | 2 | CC06605-RA.pdf |
| — | TIA | Rev 01 | 17 Nov 2026 | 2 | CC06605-TIA.pdf |
| General | Workzone plan | Rev 00 | 12 Nov 2026 | 1 | CC06605-WZ Plan- Rev 00- 15-18 Douglas St, Milton.pdf |
| S1 | TGS | Rev 01 | 17 Nov 2026 | 2 | CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdfCC06605-S1-TGS-Rev01- 33 Park Rd, Milton.pdf |
03Requests on Monday
1 request since 6 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.
| Request | Type | Suite | Rev | Stage | Requested | Required by | Planner | TMD |
|---|---|---|---|---|---|---|---|---|
| CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road) Urgent | New plans | Review amendments Internal Amendments | 6 Nov 2026 | 10 Nov 2026 | P.P | Christopher Wright |
04Who's who
From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.
Crompton Concepts
- MaccaProject coordinator (folder flag)
- P.PPlanner
- Christopher WrightTMD
- Mackenzy MollerProject coordinator (Monday)
05Update log
Monday updates and replies on this project's requests, newest first.
- 17 Nov 2026, 7:36 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
@Mackenzy Moller Internal revisions made as per Sanju. Please note that client request concrete trucks to reverse out of site into traffic is not feasible due to LOS F conditions. Trucks will need to nose into the closure area then reverse onto pump from within closure and then nose out into traffic when sufficient gaps exist. Information regarding specific positioning of concrete pumps was not given so I have made assumptions on where they should go. TMP: Rev 01 TGS: Rev 01
- 17 Nov 2026, 8:13 am · Mackenzy Moller
Okay thank you, can this please be TMD reviewed this morning @Christopher Wright @Riri D. @S.B
- 17 Nov 2026, 8:13 am · Mackenzy Moller
- 16 Nov 2026, 3:55 pm · S.B · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
Hi Patrick, Jurisdiction: QLD (Brisbane City Council local roads), so I've reviewed against AS 1742.3 / QGTTM / MUTCD Part 3 and BCC requirements. Nice, thorough set. All 10 site-active / detour / aftercare scenarios are covered for both frontages, the client's work-zone extents are picked up (Rev 1 note "Client amendments to work zone extent on all site active TGS's"), 7B–9B have the one-way detours with ROAD CLOSED AHEAD / DETOUR / END DETOUR, and 10B aftercare shows the advance signs covered. A few things to fix before it goes back to Mackenzy: 1. Client name and email are wrong on every sheet * All title blocks and the cover read "Hutchison Builders" and "brad.clark@hutchisonbuilders.com.au". It should be Hutchinson. As written, the email would bounce. Please fix it in the TGS template and the CTMP. 2. Concrete pours: trucks reversing * The client form says "hopper is north facing, trucks to reverse out". I can't find any reversing note on 7B, 8B or 9B. Please add the agitator reversing movement and who controls it (TC holding traffic and pedestrians on the footpath/ped route while the truck reverses, plus a spotter behind the truck), and show the pump/agitator positions. 3. Speed signs * Every sheet header says "Road Speed: 40 km/hr", but each sheet carries both END ROADWORK 50 and END ROADWORK 40 plates, plus "40 / REDUCE SPEED" on all approaches. If Douglas St is already posted 40, the 40 REDUCE SPEED signs on that approach are redundant and should come off. If Park…
- 13 Nov 2026, 6:17 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
@Mackenzy Moller @Riri D. TGS amendments complete as per client markups. Outllook servers are down in the United States at the time of typing this so I can't currently send/receive emails. If they are functioning before my day ends I will email them to you. I've tried to upload the pdf's to here as well as sharepoint links in the meantime. TGS Saved Here: Rev 01 TMP Saved here: Rev 01 CC06605-S1-TGS-Rev01- 15-17 Douglas St, Milton.pdf CC06605-CTMP-Rev01- 15-17 Douglas St, Milton.pdf
- 12 Nov 2026, 12:00 pm · Mackenzy Moller · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
@Riri D. @P.P Please confirm if the Amendments are being worked on as we speak and the ETA on when they will be completed CC06605-S1-TGS-Rev00- 15-17 Douglas St, Milton - HB MARKUP.pdf
- 12 Nov 2026, 2:42 pm · Mackenzy Moller
@P.P @Riri D. could you please confirm if these amendments are being actioned and an ETA oh when i will be able to send back to client
- 13 Nov 2026, 12:44 am · P.P
@Mackenzy Moller I will have these done today. In case you are unaware I am on the other side of the world so I do not work Australian hours.
- 12 Nov 2026, 2:42 pm · Mackenzy Moller
- 12 Nov 2026, 4:42 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
@Riri D. @Mackenzy Moller TMP is complete. Site contact added to TGS's as well. All items have been emailed to Mark with both of you and the Operations account CC'd
- 11 Nov 2026, 7:50 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
TMP completion is pending client contact info and project dates/timeline. Document can be fully complete tomorrow if information is provided overnight.
- 11 Nov 2026, 8:09 am · Mackenzy Moller
ct Overview Project title: 33 Park Rd, Milton - Retail Expansion Project description and scope of works:* Description of what is being constructed * Number of floors (above and below ground) * Type of development (residential / commercial) 33 Park Rd, Milton - Retail Expansion – commercial Site details Site Address (including street number) 33 Park Rd, Milton - Retail Expansion Project dates:* Commencement date * Expected completion date Unsure at this point Proposed operational days / times: Mon – fri Key contacts Project Manager* Name * Email * Phone no. Dan Harrison 0412 573 089 daniel.harrison@hutchies.com.au Site Manager* Name * Email * Phone no. Brad Clark Brad.clark@hutchinsonbuilders.com.au 0434 019 122 Traffic Management Traffic Control Company (Implementing): Crompton Concepts Long-Term Signage No required Site Sheds and Bins Internal Raft Pours - how many - how often - Number…
- 11 Nov 2026, 8:09 am · Mackenzy Moller
- 10 Nov 2026, 2:52 pm · Riri D. · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
TGS sent to client Park Rd Milton Project .eml
- 10 Nov 2026, 5:52 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
@Riri D. 10x TGS complete and sent to Mark Bryers as per instructions. TMP is pending TGS design approval and client information from Project Information Request Form. Currently no contacts or project dates/timelines have been provided. ETA for TMP is still currently late this week. Rev 00
- 10 Nov 2026, 2:50 pm · Riri D.
@P.P Site manager will be the following Brad Clark Brad.clark@hutchinsonbuilders.com.au 0434 019 122 Please use the following details for TMP, Mark has confirmed this is all we will require, How long would it take to have the TMP done, also 1 amendment for TGS on page 12 need to add another TC Project Overview Project title: 33 Park Rd, Milton - Retail Expansion Project description and scope of works:* Description of what is being constructed * Number of floors (above and below ground) * Type of development (residential / commercial) 33 Park Rd, Milton - Retail Expansion – commercial Site details Site Address (including street number) 33 Park Rd, Milton - Retail Expansion Project dates:* Commencement date * Expected completion date Unsure at this point Proposed operational days / times: Mon – fri Key contacts Project Manager* Name * Email * Phone no. Dan Harrison0412 573…
- 10 Nov 2026, 2:50 pm · Riri D.
- 7 Nov 2026, 10:19 am · P.P · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
TGS's in progress, ETA tuesday. TMP pending TGS completion. ETA late next week
- 6 Nov 2026, 12:02 pm · Riri D. · CC06605 - Hutchinson Builders - 33 Park Rd, Milton (Park Road)
Plans folder: 1. Plans - CC06605 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 15–17 Douglas Street, Milton Quote: QU5667 Job request form: Request type: New Scope: TGS & TMP * TC requirements for the following setups:* Douglas St footpath closure (ped’s diverted to shoulder) * Park Rd footpath closure (ped’s diverted to shoulder) Combined Douglas St & Park Rd footpath closure (ped’s diverted to shoulder) Douglas St footpath & shoulder closure (ped’s diverted to opposite side of the st) Park Rd footpath & shoulder closure (ped’s diverted to opposite side of the st) Combined Douglas St & Park Rd footpath & shoulder closure (ped’s diverted to opposite side of the st) Douglas St East bound lane closure Park Rd Nth bound lane closure Combined Douglas St E bound & Park Rd N bound lane closure Quote QU5667.pdf Fw_ Park rd - Check over .eml
06Every file and folder
23 files in 39 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.
| Type | Name | Folder | Saved |
|---|