← All projectsCC06609
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

33 Ellis St, Kangaroo Point

Skyline Building Group

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Skyline Building Group on this project at 33 Ellis St, Kangaroo Point, QLD. 1 Monday request is open; the most pressing is at the review amendments stage; the current CTMP on SharePoint is Rev 00; 1 TGS suite on file (S1 Rev 00). Every file opens straight from SharePoint.

Client
Skyline Building Group
Crompton job
CC06609
Location
33 Ellis St, Kangaroo Point, QLD
LGA / authority
City of Brisbane
Project coordinator
Aisha Waver
Latest planner · TMD
KB.R · Christopher Wright
Monday project status
New
Deliverables
TGS, TMP
Permits (Monday)
None on the permit boards
Last activity
16 Nov 2026
Files on SharePoint
26 in 11 folders

What needs attention now

  1. Review comments to action: CC06609 - Skyline Building Group - 33 Ellis St, Kangaroo Point. Required by 13 Nov 2026 (overdue). Planner: KB.R · TMD: Christopher Wright · Last note (16 Nov 2026, S.B): “Hi KB.R, Jurisdiction: QLD (BCC, Ellis St 40 km/h, next to the St Joseph's school zone on Leopard St). Thanks for asking for a clear list rather than chasing every report comment.…”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

03Requests on Monday

1 request since 9 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06609 - Skyline Building Group - 33 Ellis St, Kangaroo PointNew plansReview amendments
Internal Amendments
9 Nov 202613 Nov 2026KB.RChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • KB.RPlanner
  • Christopher WrightTMD
  • Aisha WaverProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. Hi KB.R, Jurisdiction: QLD (BCC, Ellis St 40 km/h, next to the St Joseph's school zone on Leopard St). Thanks for asking for a clear list rather than chasing every report comment. 1D is well detailed: portabooms with TCs at both ends, 30 m queue lengths, footpath closed with temporary pram ramps, the SECTION A-A cross-section, driveway access note, and the "signs here due to existing W-barrier / lack of space" notes. Here's my call on the Third Pass report: Action these (agree with the report) * Aftercare 2C (blocker 3): with the lane and footpath fully reopened, only 10 signs are marked COVER and several PREPARE TO STOP, ROADWORK AHEAD and DO NOT OVERTAKE stay live overnight. PREPARE TO STOP / TC symbolic must be covered when there's no TC. Please cover everything except anything genuinely needed after hours (probably nothing). * Western holding point clearance (blocker 2): 1D shows only 6 m from the STOP HERE / portaboom to the work area on that side, versus 15 m on the other. Please move it upstream to give a proper buffer, or explain on the sheet why it can't move (driveway, crest). * Independent check (must-fix 1): R.D.T and R.D are blank on every sheet, and Chris is both the TGS designer and the CTMP reviewer. Please fill in the reviewer and date on the title blocks, and make the CTMP preparer/reviewer two different people. * School and stakeholders (must-fix 2): signs and queues reach the 40 SCHOOL ZONE on Leopard St. Add a short notification section (St Joseph's,…

    • 16 Nov 2026, 5:43 pm · KB.R

      I have a few confirmations with regards to the AI-assisted review you have sent over @S.B: * Aftercare 2C (blocker 3): with the lane and footpath fully reopened, only 10 signs are marked COVER and several PREPARE TO STOP, ROADWORK AHEAD and DO NOT OVERTAKE stay live overnight. PREPARE TO STOP / TC symbolic must be covered when there's no TC. Please cover everything except anything genuinely needed after hours (probably nothing). --Not sure what to cover here. I've already covered all WORKMAN/ROADWORD and PTS/FLAGMAN signs. I've just kept RWA ARROW/DNO like how we set up our aftercare when these are long term works? * Western holding point clearance (blocker 2): 1D shows only 6 m from the STOP HERE / portaboom to the work area on that side, versus 15 m on the other. Please move it upstream to give a proper buffer, or explain on the sheet why it can't move (driveway, crest). --This was a…

  2. Hi @Christopher Wright, I've uploaded the CTMP, TGS, and all relevant files for this allocation. This has already undergone three rounds of review, and I've noticed some inconsistencies in the amendments requested through the Review App. As requested by @Ethan Mathews, the TC taper has been reduced to 10 m, with a supporting risk assessment prepared for your review and approval. To avoid further conflicting amendments and finalise this allocation, could you please clarify which comments from the Third Pass Report still need to be actioned and which can be disregarded? Please also let me know if there are any additional changes required before finalisation. Accounts: 2xTGS 1xTMP 1xRA Link: TGS > Rev 00 TMP > Rev 00It is now available for review. Thank you!

    • 16 Nov 2026, 2:12 pm · Aisha Waver

      @S.B can you please review :)

  3. Hi Plans folder: Plans - CC06609 Suite: S1 Save work here: TGS > Rev 00 TMP > Rev 00 Project location: 33 Ellis St, Kangaroo Point Quote: N/A Request type: New plans Scope: TGS & TMP Client mark-ups/attachments: Plans Request form.pdf

    • 10 Nov 2026, 2:03 pm · KB.R

      Putting this on hold as further amendments for HEH Civil has come through. Tentative progress TGS and TIA has been uploaded for reference. Waiting for @Aisha Waver's response.

06Every file and folder

26 files in 11 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved