← All projectsCC06616
Project portal · built 17 Nov 2026, 10:03 am AEST · Review amendments

75 Johson St, Byron Bay

Grayne

What's new

Monday updates and SharePoint changes, newest first

Full update log

Crompton Concepts prepares the traffic management for Grayne on this project at 73-75 Jonson Street, Byron Bay, NSW 2481. 1 Monday request is open; the most pressing is at the review amendments stage; 1 TGS suite on file (S1 Rev 00). Every file opens straight from SharePoint.

Client
Grayne
Crompton job
CC06616
Location
73-75 Jonson Street, Byron Bay, NSW 2481
LGA / authority
Byron
Project coordinator
K.R
Latest planner · TMD
A.B · Christopher Wright
Monday project status
New
Deliverables
TGS
Permits (Monday)
None on the permit boards
Last activity
16 Nov 2026
Files on SharePoint
7 in 13 folders

What needs attention now

  1. Review comments to action: CC06616 - Grayne - 75 Johson St, Byron Bay. Required by 16 Nov 2026 (overdue). Planner: A.B · TMD: Christopher Wright · Last note (16 Nov 2026, Riri D.): “Plans sent to client Re_ Credit app for TCs tomorrow .eml”

PPermits

Permits are tracked on the Monday team permit boards and the Permit Register.

No permits for this job on the Monday permit boards. If permits are needed, they have not been set up there yet.

01New to the project? Start here

  1. 1

    Understand the job

    Start with the current traffic management plan, then the client's project information.

    Nothing filed for this yet.

  2. 2

    Open the current TGS set

    Latest revision of each suite. Earlier revisions are in the register and the file list.

  3. 3

    Know the paperwork

    Project information, contacts, permits, quotes and invoices, as filed on SharePoint.

  4. 4

    Catch up on correspondence

    The latest emails saved into the project folder.

02Document register

Latest revision of each TMP, TGS suite and report, read from the revision folders and file names on SharePoint. Archived and superseded folders are left out.

SuiteDocumentLatestSavedRevsCurrent files
S1TGSRev 0016 Nov 20261CC06616-TGS-S1-Rev00 - 75 Jonson St, Byron Bay.pdfCouncil RFI Response.pdf

03Requests on Monday

1 request since 16 Nov 2026: 1 for new plans and 0 amendments to this job, newest first. Amendments stay on this page, never as a separate project.

RequestTypeSuiteRevStageRequestedRequired byPlannerTMD
CC06616 - Grayne - 75 Johson St, Byron BayNew plansReview amendments
Internal Amendments
16 Nov 202616 Nov 2026A.BChristopher Wright

04Who's who

From the Contact folders on SharePoint and the people assigned on Monday. Check the project information folder for the latest contact list.

Crompton Concepts

  • MaccaProject coordinator (folder flag)
  • A.BPlanner
  • Christopher WrightTMD
  • K.RProject coordinator (Monday)

05Update log

Monday updates and replies on this project's requests, newest first.

  1. 16 Nov 2026, 4:19 pm · Riri D. · CC06616 - Grayne - 75 Johson St, Byron Bay

    Plans sent to client Re_ Credit app for TCs tomorrow .eml

  2. 16 Nov 2026, 3:54 pm · S.B · CC06616 - Grayne - 75 Johson St, Byron Bay

    Hi A.B, Thanks for turning this around quickly. 1C (Zone A – Jonson St) and 2C (Zone B – Fletcher St) follow the client's PBOP: kerbside parking bays only, traffic lanes and footpaths stay open, 25 m work area, and the cover/title blocks have Harrison Gray's details and Byron Shire Council. As this is NSW, a few things need sorting before it goes to Harrison: 1. NSW designer accreditation (statutory) * The title blocks show "Chris Wright – TMD # OP630", which is a QLD TMR accreditation. In NSW the TGS needs to be prepared/approved by someone holding a current TfNSW Prepare a Work Zone Traffic Management Plan (PWZTMP) qualification, with that card number on the title block. Please confirm who in the team holds PWZTMP and update the title blocks. Also confirm the crew on site hold NSW TC / Implement TGS tickets. 2. TGS doesn't match the approved PBOP * The PBOP (RA-2026-12071) has interlocking hard barriers on the road side and both ends of each bay group, with "NO PARKING – WORKS IN PROGRESS" signs fixed to them. The 1A/2A manifests only list 1 x chevron and 3 x R5-40 No Parking, with no barriers. Please add the barrier type, quantity and extent to 1C/2C and the manifests. * 1C/2C show two "TC" symbols (legend: Traffic Controller), but the note and the PBOP say spotters, and the PBOP states no traffic controllers or traffic control devices. 1A/2A also list "TC (Including Breaks): 2, TC Vehicle: 1". If our people are only spotting, please use a spotter symbol and set TC…

  3. 16 Nov 2026, 9:56 am · Riri D. · CC06616 - Grayne - 75 Johson St, Byron Bay

    Plans folder: 1. Plans - CC06616 Suite: S1 Save work here: TGS > Rev 00 Project location: 75 Johson St, Byron Bay Quote: none Job request form: none Request type: New Scope: TGS Prepare TGS for awning wash and repaint works at Westpac Building. Client has provided PBOP showing occupation of parking bays on Jonson St and Fletcher St for 5 days outside trading hours. Use supplied markup/PBOP as basis for design. Urgent request from client. Council RFI Response.pdf Fw_ Credit app for TCs tomorrow .eml

    • 16 Nov 2026, 11:47 am · Riri D.

      Harrison Gray Director M. 0458 090 839 E. harrison.gray@grayne.com.au

    • 16 Nov 2026, 2:10 pm · A.B

      Hi @Chris, uploaded 2 TGS for separate zones A & B in NSW for your review. Thank you! Accounts: x2 New TGS (TGS 1C & 2C) TGS: Sharepoint - Documents - Rev 00 - All Documents

06Every file and folder

7 files in 13 folders. Type part of a name, a suite, a revision or a street to narrow the list. Sort by name or by date saved.

TypeNameFolderSaved